天津醫(yī)院深基坑工程中地連墻與排樁的應(yīng)用研究

發(fā)布時(shí)間:2018-06-25 05:17

  本文選題:排樁 + 地下連續(xù)墻。 參考:《天津大學(xué)》2014年碩士論文


【摘要】:本文以天津醫(yī)院改擴(kuò)建一期工程為背景,基坑開挖深度14.30m。通過在實(shí)際工程中深基坑支護(hù)形式由地連墻轉(zhuǎn)變?yōu)榕艠督Y(jié)構(gòu)形式,前后比較了兩種支護(hù)形式的優(yōu)缺點(diǎn),并在地連墻、排樁支護(hù)結(jié)構(gòu)形式中對穩(wěn)定性、變形效果采用軟件模擬方式進(jìn)一步分析。主要做了以下幾方面的工作:1、地連墻支護(hù)結(jié)構(gòu)形式在工程中首先被采用,但在實(shí)際施工中出現(xiàn)了難以預(yù)料的不良施工效果,通過分析設(shè)計(jì)、施工、地質(zhì)條件等因素,得出了地連墻支護(hù)結(jié)構(gòu)在本工程中的不利原因。由此闡述了不宜在地質(zhì)條件差,地下水位過高,地下20m左右還存在承壓水易造成塌孔這樣特定的地質(zhì)條件下采用地連墻基坑支護(hù)形式。2、通過現(xiàn)場原因分析,專家論證,試驗(yàn)性施工等方法論證后轉(zhuǎn)變基坑支護(hù)形式為排樁,從施工效果和軟件模擬得到,排樁沿豎向的水平位移以及沿橫向的水平位移的變形趨勢都呈“弓形”,且位移值沿著基坑深度方向越來越大,但是位移最大值始終位于基坑開挖面以上附近。圍護(hù)墻頂部的水平和豎向位移在開挖過程的變化趨勢基本一致,且隨著基坑開挖的進(jìn)行,圍護(hù)墻頂部的水平和豎向位移均呈現(xiàn)線性增加的趨勢。3、基坑外側(cè)的土體沉降值變化曲線均為“長凹槽形”,且沉降值不大,說明基坑在開挖的過程對基坑周邊的地表的沉降影響基本一致。且隨著基坑開挖的進(jìn)行,基坑外側(cè)土體的沉降值也跟著遞增。基坑開挖對地表沉降的影響范圍也隨著基坑開挖的進(jìn)行,而影響范圍逐漸增加,一般在2.5~5.0倍的開挖深度。4、通過現(xiàn)場實(shí)測數(shù)據(jù),基坑周邊地下水位和周圍建筑物均符合相關(guān)規(guī)范要求,所以采用排樁的深基坑支護(hù)結(jié)構(gòu)對于基坑周邊的地下水位和周圍建筑物沉降的控制效果是良好的。研究表明,深基坑支護(hù)結(jié)構(gòu)的選擇,不但與工程所在地的地理環(huán)境和地質(zhì)條件有關(guān),它還與工程的其他施工工序有關(guān)。本工程施工工序的安排,對基坑支護(hù)工程的成敗,有著深刻的影響,排樁較地下連續(xù)墻深基坑支護(hù)結(jié)構(gòu)之所以獲得成功,一個(gè)很重要的因素,就是合理調(diào)整了施工工序,將止水帷幕施工放在灌注樁施工之前,有效的阻斷了地下承壓水的侵?jǐn)_,保證了灌注樁的順利成孔。排樁的深基坑支護(hù)結(jié)構(gòu)充分發(fā)揮了結(jié)構(gòu)的優(yōu)點(diǎn),為今后的工程提供了具有一定參考價(jià)值的借鑒。
[Abstract]:In this paper, the excavation depth of the foundation pit is 14.30 m, based on the first stage reconstruction and extension project of Tianjin Hospital. Through the transformation of deep foundation pit support form from ground connecting wall to row pile structure in practical engineering, the advantages and disadvantages of two kinds of supporting forms are compared before and after, and the stability of these two kinds of supporting forms is compared in the form of ground connecting wall and row pile supporting structure. The deformation effect is further analyzed by software simulation. I mainly did the following work: 1, the ground connection wall support structure form was first adopted in the project, but in the actual construction there appeared unpredictable bad construction effect, through the analysis of design, construction, geological conditions and other factors, The unfavorable reasons of the ground-connected wall supporting structure in this project are obtained. In this paper, it is expounded that it is not suitable to adopt the retaining form of ground connected wall foundation pit under the special geological conditions, such as poor geological conditions, high groundwater level and 20 m underground pressure water, which can easily lead to collapse of holes. Through field cause analysis, experts prove that, After demonstration of experimental construction and other methods, the supporting form of foundation pit is changed to row pile. From the results of construction and software simulation, the deformation trend of horizontal displacement along vertical direction and horizontal displacement along lateral direction of row pile is shown as "bow". The displacement value is increasing along the depth of the foundation pit, but the maximum displacement is always near the excavation surface. The horizontal and vertical displacement at the top of the retaining wall is basically the same in the excavation process, and with the excavation of foundation pit, The horizontal and vertical displacements at the top of the retaining wall show a linear increasing trend. The settlement curves of soil outside the foundation pit are all "long grooves", and the settlement values are not large. It shows that the influence of excavation process on the surface settlement around the foundation pit is basically the same. With the excavation of foundation pit, the settlement of soil outside the foundation pit increases. The influence range of foundation pit excavation on surface settlement is also increasing with the excavation of foundation pit, and the influence range is generally at 2.5 ~ 5.0 times of excavation depth. The underground water level around the foundation pit and the surrounding buildings all meet the requirements of the relevant codes, so the control effect of the deep foundation pit supporting structure with row piles on the underground water level around the foundation pit and the settlement of the surrounding buildings is good. The study shows that the selection of deep foundation pit supporting structure is not only related to the geographical environment and geological conditions of the site of the project, but also related to other construction processes of the project. The arrangement of the construction procedure of this project has a profound influence on the success or failure of the foundation pit support project. One of the important factors for the success of the deep foundation pit support structure with the row piles compared with the underground continuous wall is the reasonable adjustment of the construction procedure. Before the construction of water-stop curtain is put into the construction of cast-in-place pile, the interference of underground confined water is effectively blocked, and the smooth formation of the bored pile is ensured. The supporting structure of deep foundation pit with row pile has brought the advantages of structure into full play and provided some reference for future engineering.
【學(xué)位授予單位】:天津大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TU753

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 王立平;王和平;;鉆孔排樁和錨桿組合擋墻施工技術(shù)[J];城市建筑;2013年22期

2 張華;謝慧;;排樁結(jié)構(gòu)在居民區(qū)防汛堤防中的應(yīng)用[J];小水電;2011年03期

3 楊燦輝;;排樁兼作地下工程抗浮的應(yīng)用探討[J];建設(shè)科技;2014年08期

4 何文熙;;擠壓鉆孔搭接排樁研究[J];中國新技術(shù)新產(chǎn)品;2013年13期

5 M·H·ABDUL KHADER ,趙智邦;密排樁防波堤的研究[J];港工技術(shù);1985年01期

6 屠毓敏;俞亞南;;被動排樁彎曲性狀的三維有限元分析[J];巖土力學(xué);2008年02期

7 劉雪教;排樁全套管法施工技術(shù)[J];建筑施工;2001年04期

8 姚遠(yuǎn);對深基坑排樁支護(hù)結(jié)構(gòu)設(shè)計(jì)中幾個(gè)問題的探討[J];四川建筑科學(xué)研究;1999年02期

9 李新坡,袁文忠;多支點(diǎn)排樁計(jì)算ANSYS二次開發(fā)技術(shù)研究[J];鐵道建筑技術(shù);2004年02期

10 洪家寶;劉嘉;鄭克亞;王蘊(yùn)智;;水平荷載作用下排樁受力變形影響因素分析[J];水利與建筑工程學(xué)報(bào);2011年02期

相關(guān)會議論文 前3條

1 吉林;阮靜;朱文白;;“排樁凍結(jié)”法在深大基坑應(yīng)用中的幾個(gè)問題[A];科技、工程與經(jīng)濟(jì)社會協(xié)調(diào)發(fā)展——中國科協(xié)第五屆青年學(xué)術(shù)年會論文集[C];2004年

2 張浩;王曉毅;;深基礎(chǔ)排樁代模施工技術(shù)[A];施工機(jī)械化新技術(shù)交流會論文集(第十一輯)[C];2010年

3 梁志榮;裴捷;;排樁凍結(jié)法應(yīng)用于超深基坑圍護(hù)結(jié)構(gòu)實(shí)踐[A];全國城市地下空間學(xué)術(shù)交流會論文集[C];2004年

相關(guān)重要報(bào)紙文章 前1條

1 記者 陸待君 實(shí)習(xí)生 王萍;嘉陵江底成排樁孔深達(dá)33米 老板當(dāng)起監(jiān)工夯牢大橋根基[N];南充日報(bào);2010年

相關(guān)博士學(xué)位論文 前3條

1 向波;小直徑鋼管排樁抗滑機(jī)理及計(jì)算方法研究[D];西南交通大學(xué);2013年

2 黃建坤;周期性排樁和波屏障在土木工程減振中的應(yīng)用研究[D];北京交通大學(xué);2014年

3 徐滿清;軌道交通振動傳播與排樁減振的數(shù)值分析方法及應(yīng)用[D];南昌大學(xué);2010年

相關(guān)碩士學(xué)位論文 前10條

1 潘新恩;雙排式鉆孔抗滑樁前后排樁荷載分擔(dān)規(guī)律研究[D];重慶交通大學(xué);2015年

2 王媛媛;含垃圾填埋土地層深大基坑雙排樁力學(xué)效應(yīng)及影響因素研究[D];重慶大學(xué);2015年

3 王另的;地鐵近場建筑物周期性排樁隔振性能研究[D];中國鐵道科學(xué)研究院;2016年

4 王世雄;天津醫(yī)院深基坑工程中地連墻與排樁的應(yīng)用研究[D];天津大學(xué);2014年

5 崔允亮;水平荷載作用下排樁的受力和變形特性研究[D];揚(yáng)州大學(xué);2009年

6 何云勇;小直徑鋼管排樁加固邊坡的理論分析與試驗(yàn)驗(yàn)證[D];西南交通大學(xué);2012年

7 趙世俊;混凝土排樁隔振的現(xiàn)場試驗(yàn)及數(shù)值模擬[D];鄭州大學(xué);2014年

8 張正義;小直徑鋼管排樁抗滑計(jì)算理論及離心模型試驗(yàn)研究[D];西南交通大學(xué);2010年

9 郎麗麗;基坑支護(hù)中排樁—圈梁結(jié)構(gòu)的研究[D];中國石油大學(xué)(華東);2013年

10 伍宇進(jìn);上海地區(qū)排樁圍護(hù)優(yōu)化設(shè)計(jì)研究[D];同濟(jì)大學(xué);2006年

,

本文編號:2064759

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/guanlilunwen/chengjian/2064759.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶69dcb***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com