600米跨巨型穹頂網(wǎng)格結(jié)構(gòu)的設(shè)計(jì)和施工技術(shù)研究

發(fā)布時(shí)間:2018-05-27 20:09

  本文選題:三向巨型網(wǎng)格結(jié)構(gòu) + 超大跨空間結(jié)構(gòu)施工技術(shù); 參考:《太原理工大學(xué)》2014年碩士論文


【摘要】:隨著經(jīng)濟(jì)和文化的飛速發(fā)展,人們在不斷探索能將更大的空間覆蓋起來的超大跨空間結(jié)構(gòu),譬如能夠?qū)⒄麄(gè)街區(qū)、整個(gè)廣場、甚至整個(gè)山谷覆蓋于其中形成一個(gè)可人工控制結(jié)構(gòu)內(nèi)部氣候的居住環(huán)境或休閑環(huán)境,這就需要跨度能夠達(dá)到500米,甚至幾千米的超大跨空間結(jié)構(gòu)來滿足人類對大空間的需求。本文以現(xiàn)有的大跨空間結(jié)構(gòu)形式為基礎(chǔ),提出了一種新穎的大跨空間結(jié)構(gòu)形式一一三向巨型網(wǎng)格結(jié)構(gòu)。然后根據(jù)現(xiàn)有的結(jié)構(gòu)設(shè)計(jì)規(guī)范,設(shè)計(jì)了一個(gè)擬建于太原市郊區(qū)的600米跨度的三向巨型網(wǎng)格結(jié)構(gòu)穹頂,并運(yùn)用該結(jié)構(gòu)進(jìn)行了一下幾方面的工作:(1)利用Midas gen 8.0有限元分軟件對該結(jié)構(gòu)進(jìn)行了計(jì)算(包括在靜力荷載、地震作用、溫度作用下的強(qiáng)度驗(yàn)算、剛度驗(yàn)算,地震作用下的模態(tài)分析等);并對該結(jié)構(gòu)的各項(xiàng)經(jīng)濟(jì)技術(shù)指標(biāo)進(jìn)行了統(tǒng)計(jì)。(2)介紹了現(xiàn)有常用大跨空間結(jié)構(gòu)的施工方法,并在此基礎(chǔ)上提出了運(yùn)用分步頂升法來實(shí)現(xiàn)超大跨空間結(jié)構(gòu)的施工安裝。(3)介紹了分步頂升法的施工順序,和該結(jié)構(gòu)施工段的劃分;按照分步頂升法的施工順序?qū)⒔Y(jié)構(gòu)的施工過程劃分為16個(gè)施工階段,并對每個(gè)施工步驟所涉及的施工流程做了簡要的描述。(4)根據(jù)所劃分的施工階段,運(yùn)用Midas gen 8.0有限元分析軟件對該結(jié)構(gòu)進(jìn)行了施工模擬計(jì)算,計(jì)算結(jié)果表明該結(jié)構(gòu)的撓度和桿件的強(qiáng)度、穩(wěn)定性等滿足現(xiàn)行規(guī)范的要求。(5)設(shè)計(jì)了卸載施工方案,簡要介紹了千斤頂?shù)男遁d步驟,并運(yùn)用Midas gen 8.0有限元分析軟件對結(jié)構(gòu)的卸載過程進(jìn)行了模擬計(jì)算,確定了每個(gè)卸載步中卸載位移量的大小。(6)設(shè)計(jì)了頂升方案,并介紹了頂升原理;根據(jù)計(jì)算結(jié)果,提取出各個(gè)頂升階段頂升點(diǎn)的支反力,按照提取出的支反力設(shè)計(jì)頂升支架;對頂升支座進(jìn)行了設(shè)計(jì);確定了千斤頂?shù)男吞;詳?xì)介紹了頂升工藝。(7)根據(jù)施工過程中結(jié)構(gòu)的位移情況,采用正裝迭代法,對施工過程中結(jié)構(gòu)各個(gè)關(guān)鍵點(diǎn)施工坐標(biāo)預(yù)調(diào)值進(jìn)行了計(jì)算,使結(jié)構(gòu)的竣工位形與設(shè)計(jì)位形的偏差在精度范圍內(nèi)。(8)分析了溫度作用對結(jié)構(gòu)施工過程的影響,并提出了相應(yīng)的解決方案。對600米跨三向巨型網(wǎng)格結(jié)構(gòu)的分析和計(jì)算結(jié)構(gòu)表明:該結(jié)構(gòu)形式傳力路徑明確,經(jīng)濟(jì)技術(shù)指標(biāo)在合理范圍內(nèi);分步頂升法相比其他施工方法有其獨(dú)特的優(yōu)勢和特點(diǎn),具有廣闊的運(yùn)用前景;對于分步頂升法,消除頂升過程中的水平推力是這一方法的技術(shù)難點(diǎn)和重點(diǎn),只有合理設(shè)計(jì)頂升方案和頂升支架,才能更好的將分步頂升法運(yùn)用于工程實(shí)際中;溫度作用對施工過程中結(jié)構(gòu)內(nèi)力的影響不可忽視,同時(shí)在超大跨度空間結(jié)構(gòu)的施工過程中,要充分考慮溫度作用的影響,預(yù)先設(shè)置多套應(yīng)急預(yù)案,保證施工正常進(jìn)行。
[Abstract]:With the rapid development of economy and culture, people are constantly exploring the super-large space structure that can cover the larger space, such as the whole block, the whole square, Even the whole valley is covered in it to form a living environment or leisure environment which can be controlled by artificial structure, which requires a super-large space structure with a span of 500 meters or even a few kilometers to meet the needs of human beings for large space. Based on the existing large span space structure, a novel one-three-dimensional giant grid structure is proposed in this paper. Then, according to the existing structural design code, a 600-meter span giant grid dome is designed to be built in the suburb of Taiyuan. Using the structure to do some work in several aspects: 1) using Midas gen 8.0 finite element software to calculate the structure (including static load, earthquake action, temperature action, strength check calculation, stiffness check calculation, etc.) Modal analysis under seismic action, and statistical analysis of various economic and technical indexes of the structure are also given. The construction methods of existing long-span spatial structures are introduced. On the basis of this, the paper puts forward the application of stepwise lifting method to realize the construction installation of super-large span space structure. It introduces the construction sequence and the division of the construction section of the structure. According to the construction sequence of stepwise lifting method, the construction process of the structure is divided into 16 construction stages, and the construction process involved in each construction step is described briefly. Midas gen 8.0 finite element analysis software is used to simulate the construction of the structure. The calculation results show that the deflection of the structure and the strength and stability of the members meet the requirements of the current code. The unloading steps of the Jack are briefly introduced, and the unloading process of the structure is simulated and calculated by using Midas gen 8.0 finite element analysis software. The size of the unloading displacement in each unloading step is determined, and the lifting scheme is designed. According to the calculation results, the support and reaction force of each lifting point is extracted, and the lifting support is designed according to the extracted support reaction force, the lifting support is designed, and the type of Jack is determined. According to the displacement of the structure during construction, the construction coordinate presetting value of every key point in the construction process is calculated by using the formal iteration method. The effect of temperature on the construction process of the structure is analyzed and the corresponding solution is put forward by making the deviation between the completed configuration of the structure and the design configuration within the precision range. The analysis and calculation of the 600 m span three dimensional giant grid structure show that the force transfer path of the structure is clear, the economic and technical indexes are within a reasonable range, and the stepwise lifting method has its unique advantages and characteristics compared with other construction methods. For the stepwise lifting method, eliminating the horizontal thrust in the process of lifting is the technical difficulty and key point of this method, only reasonable design of the lifting scheme and lifting support is the only way to solve the problem. The effect of temperature on the internal force of the structure should not be ignored, and the effect of temperature should be fully considered in the construction of large span space structure. Set up several emergency plans in advance to ensure normal construction.
【學(xué)位授予單位】:太原理工大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TU399

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 賀擁軍;周緒紅;周佳偉;;拉索預(yù)應(yīng)力空間網(wǎng)格結(jié)構(gòu)的索張力計(jì)算及張拉全過程分析[J];自然災(zāi)害學(xué)報(bào);2012年02期

2 賀擁軍;李練兵;周緒紅;;行波激勵(lì)下圓柱面巨型網(wǎng)格結(jié)構(gòu)的地震響應(yīng)分析[J];土木建筑與環(huán)境工程;2012年02期

3 董石麟;邢棟;趙陽;;現(xiàn)代大跨空間結(jié)構(gòu)在中國的應(yīng)用與發(fā)展[J];空間結(jié)構(gòu);2012年01期

4 賀擁軍;李練兵;周緒紅;;多點(diǎn)激勵(lì)下圓柱面巨型網(wǎng)格結(jié)構(gòu)地震響應(yīng)分析[J];防災(zāi)減災(zāi)工程學(xué)報(bào);2011年03期

5 賀擁軍;周佳偉;周緒紅;;拉索預(yù)應(yīng)力球面巨型網(wǎng)格結(jié)構(gòu)靜力性能優(yōu)化分析[J];湖南大學(xué)學(xué)報(bào)(自然科學(xué)版);2010年03期

6 賀擁軍;全勇;周緒紅;李佳;;巨型網(wǎng)格開合屋蓋靜力與穩(wěn)定性能研究[J];湖南大學(xué)學(xué)報(bào)(自然科學(xué)版);2009年04期

7 李峰;郭宏超;劉建毅;;球面巨型網(wǎng)格結(jié)構(gòu)動(dòng)力特性及抗震分析[J];鋼結(jié)構(gòu);2008年09期

8 賀擁軍;李佳;周緒紅;;球面巨型網(wǎng)格結(jié)構(gòu)的構(gòu)成、支承方式與力學(xué)模型[J];湖南大學(xué)學(xué)報(bào)(自然科學(xué)版);2007年03期

9 賀擁軍;周緒紅;董石麟;;巨型網(wǎng)格結(jié)構(gòu)的結(jié)構(gòu)形式與支承方式[J];建筑結(jié)構(gòu);2006年08期

10 俞寶達(dá);王旭峰;金人杰;;高空滑移施工技術(shù)在網(wǎng)架中的應(yīng)用[J];結(jié)構(gòu)工程師;2006年03期

相關(guān)會(huì)議論文 前5條

1 董石麟;趙陽;;三十年來中國現(xiàn)代大跨空間結(jié)構(gòu)的體系發(fā)展與創(chuàng)新[A];第十四屆空間結(jié)構(gòu)學(xué)術(shù)會(huì)議論文集[C];2012年

2 劉錫良;;現(xiàn)代空間結(jié)構(gòu)的新發(fā)展[A];慶賀劉錫良教授執(zhí)教五十周年暨第一屆全國現(xiàn)代結(jié)構(gòu)工程學(xué)術(shù)報(bào)告會(huì)論文集[C];2001年

3 趙劍利;劉錫良;陳志華;田浩;;攀達(dá)穹頂體系設(shè)計(jì)計(jì)算前處理程序的開發(fā)[A];慶賀劉錫良教授執(zhí)教五十周年暨第一屆全國現(xiàn)代結(jié)構(gòu)工程學(xué)術(shù)報(bào)告會(huì)論文集[C];2001年

4 賀擁軍;董石麟;;巨型網(wǎng)格結(jié)構(gòu)的形體分析與力學(xué)模型[A];第九屆空間結(jié)構(gòu)學(xué)術(shù)會(huì)議論文集[C];2000年

5 趙劍利;劉錫良;陳志華;;攀達(dá)穹頂體系頂升過程的機(jī)構(gòu)運(yùn)動(dòng)分析和計(jì)算機(jī)模擬[A];第九屆空間結(jié)構(gòu)學(xué)術(shù)會(huì)議論文集[C];2000年

相關(guān)博士學(xué)位論文 前6條

1 劉永建;大跨度拱支結(jié)構(gòu)力學(xué)性能與施工技術(shù)研究[D];天津大學(xué);2012年

2 許賢;張拉整體結(jié)構(gòu)的形態(tài)理論與控制方法研究[D];浙江大學(xué);2009年

3 徐洪濤;大跨度建筑結(jié)構(gòu)表現(xiàn)的建構(gòu)研究[D];同濟(jì)大學(xué);2008年

4 劉宏偉;大跨建筑混合結(jié)構(gòu)設(shè)計(jì)研究[D];同濟(jì)大學(xué);2008年

5 史洪泉;大跨度空間鋼結(jié)構(gòu)施工全過程力學(xué)分析及考慮施工影響的若干要素研究[D];東南大學(xué);2005年

6 張志宏;大型索桿梁張拉空間結(jié)構(gòu)體系的理論研究[D];浙江大學(xué);2003年

相關(guān)碩士學(xué)位論文 前10條

1 王慶;六種典型雙層球面網(wǎng)殼參數(shù)化建模及形狀優(yōu)化設(shè)計(jì)[D];山東建筑大學(xué);2012年

2 陳良偉;圓柱面巨型網(wǎng)格結(jié)構(gòu)動(dòng)力穩(wěn)定性研究[D];湖南大學(xué);2012年

3 丁樂然;肋環(huán)型巨型網(wǎng)格弦支穹頂結(jié)構(gòu)靜力性能及動(dòng)力特性分析[D];西安建筑科技大學(xué);2012年

4 尹春;某會(huì)議中心鋼結(jié)構(gòu)安裝技術(shù)研究[D];西安建筑科技大學(xué);2012年

5 王超;六種典型帶肋局部雙層球面網(wǎng)殼的參數(shù)化建模及形狀優(yōu)化設(shè)計(jì)[D];山東建筑大學(xué);2012年

6 支榮權(quán);單層短程線型球面網(wǎng)殼優(yōu)化設(shè)計(jì)及抗震性能研究[D];山東建筑大學(xué);2011年

7 張志剛;單層球面網(wǎng)殼穩(wěn)定設(shè)計(jì)方法研究[D];華南理工大學(xué);2011年

8 章小桐;拉索預(yù)應(yīng)力柱面巨型網(wǎng)格結(jié)構(gòu)的靜力與穩(wěn)定性研究[D];湖南大學(xué);2011年

9 李練兵;多點(diǎn)激勵(lì)下圓柱面巨型網(wǎng)格結(jié)構(gòu)的地震響應(yīng)分析[D];湖南大學(xué);2011年

10 林志野;大跨度空間鋼結(jié)構(gòu)滑移法施工全過程力學(xué)行為研究[D];沈陽建筑大學(xué);2011年

,

本文編號:1943578

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/guanlilunwen/chengjian/1943578.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶2df11***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請E-mail郵箱bigeng88@qq.com