東北地區(qū)風(fēng)電供暖分析研究
本文選題:風(fēng)電并網(wǎng) + 東北電網(wǎng)��; 參考:《華北電力大學(xué)》2014年碩士論文
【摘要】:隨著東北地區(qū)的風(fēng)電裝機(jī)容量的逐年增大,風(fēng)電的大規(guī)模并網(wǎng)給電網(wǎng)安全、穩(wěn)定運(yùn)行帶來較大影響。至2012年已經(jīng)帶來嚴(yán)重的棄風(fēng)問題,其中東北電網(wǎng)為棄風(fēng)限電“重災(zāi)區(qū)”。筆者結(jié)合東北電網(wǎng)風(fēng)電增長形勢,通過探究分析遼寧省風(fēng)電負(fù)荷特性、系統(tǒng)調(diào)峰能力,分析出東北地區(qū)風(fēng)電現(xiàn)狀不容樂觀而解決該問題最為實(shí)際的出路就是風(fēng)電供暖。國家能源局在2013年春節(jié)后緊急發(fā)布《關(guān)于做好2013年風(fēng)電并網(wǎng)和消納相關(guān)工作的通知》,并將風(fēng)電儲能和供暖系統(tǒng)作為重點(diǎn)。 基于此本文對風(fēng)電供暖系統(tǒng)關(guān)鍵技術(shù)進(jìn)行深入分析,通過前期的調(diào)研和綜合分析,筆者發(fā)現(xiàn)目前風(fēng)電供暖系統(tǒng)尚處于起始階段,,關(guān)鍵的技術(shù)有待進(jìn)一步調(diào)查,關(guān)鍵設(shè)備有待研發(fā)和引進(jìn),并得出風(fēng)電供暖的關(guān)鍵技術(shù)難點(diǎn)在于儲能和熱能效率。同時筆者分析得出風(fēng)電供暖的發(fā)展將成為制約風(fēng)電領(lǐng)域發(fā)展的最關(guān)鍵因素,由于時間所限調(diào)整研究方向,因此筆者后期將進(jìn)一步重點(diǎn)通過文獻(xiàn)綜述分析國內(nèi)外風(fēng)電供暖關(guān)鍵技術(shù)和核心關(guān)鍵設(shè)備,并擬依據(jù)東北電網(wǎng)供暖試點(diǎn)系統(tǒng)所需解決問題和思路引起關(guān)聯(lián)設(shè)備作為解決依據(jù),并將進(jìn)一步探究更佳的技術(shù)和經(jīng)濟(jì)解決方案。 風(fēng)電棄風(fēng)問題是世界風(fēng)力發(fā)電共同面臨的難題。本文著重分析了東北電網(wǎng)風(fēng)電棄風(fēng)量的變化規(guī)律,發(fā)現(xiàn)棄風(fēng)嚴(yán)重期與城市冬季供暖期在時間上吻合。在此基礎(chǔ)上,進(jìn)一步分析了將目前棄風(fēng)電量能夠?yàn)榧泄┡到y(tǒng)提供的供熱能力,和改造現(xiàn)有系統(tǒng)的復(fù)雜程度,證明在東北地區(qū)實(shí)施風(fēng)電供暖的可行性。并結(jié)合東北地區(qū)現(xiàn)有的集中供暖設(shè)備以及并網(wǎng)型風(fēng)電機(jī)組,建立了混合儲能系統(tǒng)模型,并用Simulink仿真證實(shí)了方案的可行。提出相應(yīng)的風(fēng)光互補(bǔ)系統(tǒng)改造方案及微網(wǎng)系統(tǒng)實(shí)施方案,使風(fēng)能利用率得到進(jìn)一步提高,并建立了區(qū)域式供暖的模型。雖然通過模型分析風(fēng)電供暖項(xiàng)目目前在經(jīng)濟(jì)價值上沒有可行性,但綜合考慮環(huán)境因素和治污費(fèi)用上,具有重大的現(xiàn)實(shí)意義,通過國家和部分省市的政策來看,未來將有長足的發(fā)展空間。
[Abstract]:With the increase of installed capacity of wind power in Northeast China, large-scale grid connection of wind power has a great impact on the safety and stability of power grid. By 2012 has brought a serious problem of wind abandonment, including the Northeast Power Grid for the abandonment of electricity "hard disaster area." Combined with the situation of wind power growth in Northeast China Power Grid, the author analyzes the characteristics of wind power load in Liaoning Province and the capacity of peak shaving system, and finds out that the current situation of wind power in Northeast area is not optimistic, and the most practical way to solve this problem is wind power heating. After the Spring Festival in 2013, the State Energy Administration issued an urgent notice on doing a good job in wind power grid connection and absorption in 2013, and focused on wind power storage and heating systems. Based on this, the key technologies of wind power heating system are deeply analyzed. Through the previous investigation and comprehensive analysis, the author finds that the wind power heating system is still in the initial stage, and the key technologies need to be further investigated. The key equipment needs to be developed and imported, and the key technical difficulties of wind power heating are energy storage and thermal energy efficiency. At the same time, the author concludes that the development of wind power heating will become the most critical factor restricting the development of wind power field. Therefore, the author will further analyze the key technologies and key equipment of wind power heating at home and abroad through literature review in the later period, and propose to solve the related equipment according to the problems and ideas needed by the heating pilot system of Northeast Power Grid as the basis for the solution. And will further explore better technical and economic solutions. Wind power abandonment is a common problem of wind power generation in the world. In this paper, the variation law of wind power output in Northeast China Power Grid is analyzed, and it is found that the serious period of wind abandonment coincides with the heating period in urban winter. On the basis of this, the paper further analyzes the heat supply capacity which can be provided by the current abandoned wind power supply for central heating system, and the complexity of reforming the existing system, which proves the feasibility of implementing wind power heating in Northeast China. Combined with the existing central heating equipment and grid-connected wind turbine in Northeast China, the model of hybrid energy storage system is established, and the feasibility of the scheme is proved by Simulink simulation. The corresponding retrofit scheme of wind energy complementary system and the implementation scheme of micro-grid system are put forward to further improve the utilization rate of wind energy and the model of district heating is established. Although it is not feasible to analyze the economic value of wind power heating projects through the model analysis, it is of great practical significance to comprehensively consider environmental factors and pollution control costs, as seen from the policies of the state and some provinces and cities. There will be considerable room for development in the future.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TU832;TM614
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 ;數(shù)字電網(wǎng)[J];國家電網(wǎng);2006年04期
2 ;數(shù)字電網(wǎng)[J];國家電網(wǎng);2006年02期
3 ;數(shù)字電網(wǎng)[J];國家電網(wǎng);2006年03期
4 ;數(shù)字電網(wǎng)[J];國家電網(wǎng);2006年05期
5 ;東北電網(wǎng)部署首個整合支撐系統(tǒng)[J];每周電腦報;2007年25期
6 ;東北電網(wǎng)完善電力市場技術(shù)支持系統(tǒng)[J];東北電力技術(shù);2008年04期
7 ;東北電網(wǎng)首輛應(yīng)急電源車落戶內(nèi)蒙古赤峰[J];東北電力技術(shù);2009年02期
8 ;東北電網(wǎng)“一本三化”為安全生產(chǎn)提供文化支持[J];東北電力技術(shù);2009年04期
9 ;科學(xué)發(fā)展加快東北電網(wǎng)建設(shè) 服務(wù)地區(qū)推進(jìn)遼寧全面振興[J];黨史縱橫;2009年06期
10 ;東北電網(wǎng)應(yīng)急通信系統(tǒng)通過驗(yàn)收[J];電力系統(tǒng)通信;2011年08期
相關(guān)會議論文 前2條
1 ;剖析“窩電”背后 電力余缺調(diào)劑三大矛盾待解[A];《風(fēng)電技術(shù)》2013年08月第4期(總第40期)[C];2013年
2 ;東北風(fēng)電 開辟華北通道[A];《風(fēng)電技術(shù)》2013年02月第1期(總第37期)[C];2013年
相關(guān)重要報紙文章 前10條
1 張真;東北電網(wǎng)制定安全穩(wěn)定運(yùn)行方案[N];中國電力報;2007年
2 記者 王慶華 實(shí)習(xí)生 商慧來;市黨政領(lǐng)導(dǎo)與東北電網(wǎng)有限公司負(fù)責(zé)同志座談[N];赤峰日報;2006年
3 石慶偉;我國將投資1070億改造東北電網(wǎng)[N];中國改革報;2006年
4 劉工;東北電網(wǎng)著手優(yōu)化資源配置[N];中國工業(yè)報;2006年
5 ;譜寫東北電網(wǎng)科學(xué)發(fā)展的新篇章[N];東北電力報;2006年
6 樺巖;凝聚力量 創(chuàng)新發(fā)展[N];東北電力報;2006年
7 張真 本報記者 楊忠厚;東北電網(wǎng)千方百計保障春節(jié)電力供應(yīng)[N];遼寧日報;2007年
8 王韜 本報記者 唐成選;東北電網(wǎng)解除風(fēng)險預(yù)警[N];遼寧日報;2007年
9 石慶偉;“十一五”期間我國將投資1070億元改造東北電網(wǎng)[N];中國有色金屬報;2007年
10 顧曉光 李春山;東北電網(wǎng)前期工作會議在哈爾濱召開[N];東北電力報;2007年
相關(guān)碩士學(xué)位論文 前9條
1 金元;東北電網(wǎng)省區(qū)間聯(lián)絡(luò)線日計劃管理系統(tǒng)研究[D];華北電力大學(xué)(北京);2009年
2 王偉;面向宏觀決策的東北電網(wǎng)電源規(guī)劃評估研究[D];大連理工大學(xué);2011年
3 張寶廷;東北電網(wǎng)電源建設(shè)擴(kuò)展優(yōu)化研究[D];華北電力大學(xué)(北京);2008年
4 徐哲;東北電網(wǎng)安全管理策略研究[D];大連理工大學(xué);2008年
5 李志英;節(jié)能調(diào)度對東北電網(wǎng)經(jīng)濟(jì)性與安全性的影響研究[D];華北電力大學(xué)(北京);2010年
6 吳敬坤;東北電網(wǎng)最小成本電源擴(kuò)展規(guī)劃研究[D];吉林大學(xué);2006年
7 王紅衛(wèi);東北電網(wǎng)有限公司高技能人才隊伍建設(shè)研究[D];華北電力大學(xué)(北京);2009年
8 王曉峰;東北電網(wǎng)消納風(fēng)電能力研究[D];華北電力大學(xué)(北京);2011年
9 閻雍明;東北地區(qū)風(fēng)電供暖分析研究[D];華北電力大學(xué);2014年
本文編號:1790135
本文鏈接:http://sikaile.net/guanlilunwen/chengjian/1790135.html