公路工程項(xiàng)目群風(fēng)險(xiǎn)管理研究

發(fā)布時(shí)間:2018-01-03 14:40

  本文關(guān)鍵詞:公路工程項(xiàng)目群風(fēng)險(xiǎn)管理研究 出處:《南華大學(xué)》2014年碩士論文 論文類型:學(xué)位論文


  更多相關(guān)文章: 公路工程 項(xiàng)目群管理 風(fēng)險(xiǎn)管理 風(fēng)險(xiǎn)內(nèi)化 風(fēng)險(xiǎn)外化


【摘要】:本文主要研究的是公路工程項(xiàng)目群風(fēng)險(xiǎn)管理。項(xiàng)目群風(fēng)險(xiǎn)管理在項(xiàng)目管理中是一個(gè)新興的研究方向,它不僅包含了項(xiàng)目風(fēng)險(xiǎn)管理的問(wèn)題,同時(shí)還包含了項(xiàng)目管理中多個(gè)項(xiàng)目如何管理的問(wèn)題,兩個(gè)問(wèn)題如何統(tǒng)一,即此選題的理論意義,F(xiàn)如今,由于我國(guó)公路交通的迅速發(fā)展,而公路工程的風(fēng)險(xiǎn)引起學(xué)者們極大的關(guān)注。隨著公路工程數(shù)量的增加、規(guī)模的擴(kuò)大以及項(xiàng)目群的產(chǎn)生,使公路工程項(xiàng)目群風(fēng)險(xiǎn)更加隱性和復(fù)雜。如何應(yīng)對(duì)公路工程項(xiàng)目群風(fēng)險(xiǎn),正是這篇論文的實(shí)際意義。本文的研究方法和研究路徑是根據(jù)前人關(guān)于公路工程風(fēng)險(xiǎn)、項(xiàng)目群管理的研究和項(xiàng)目管理中風(fēng)險(xiǎn)管理的知識(shí)領(lǐng)域?yàn)橹饕碚撘罁?jù),借鑒了國(guó)內(nèi)外關(guān)于公路工程項(xiàng)目管理的寶貴經(jīng)驗(yàn),結(jié)合典型案例的分析,總結(jié)得出公路工程項(xiàng)目群風(fēng)險(xiǎn)管理的若干經(jīng)驗(yàn),并提出關(guān)于公路項(xiàng)目群風(fēng)險(xiǎn)管理的政策建議和未來(lái)發(fā)展方向。本文的主要內(nèi)容框架如下:(1)第一部分系統(tǒng)地探討了當(dāng)前公路工程項(xiàng)目風(fēng)險(xiǎn)管理研究現(xiàn)狀,結(jié)合目前國(guó)內(nèi)外公路工程風(fēng)險(xiǎn)管理的現(xiàn)狀和特點(diǎn),提出了公路工程項(xiàng)目群風(fēng)險(xiǎn)管理的一般理論和方法。(2)第二部分通過(guò)對(duì)公路工程風(fēng)險(xiǎn)的定義及風(fēng)險(xiǎn)源的劃分,提出了項(xiàng)目群風(fēng)險(xiǎn)的特點(diǎn)及其內(nèi)容,并構(gòu)建了項(xiàng)目群風(fēng)險(xiǎn)管理的基本框架,其基本框架主要包括項(xiàng)目群風(fēng)險(xiǎn)的風(fēng)險(xiǎn)識(shí)別、風(fēng)險(xiǎn)評(píng)估、風(fēng)險(xiǎn)量化、風(fēng)險(xiǎn)控制對(duì)策和建議。(3)第三部分通過(guò)使用公路項(xiàng)目群風(fēng)險(xiǎn)管理的方法對(duì)實(shí)際案例進(jìn)行分析,提出了公路工程項(xiàng)目群風(fēng)險(xiǎn)的控制建議。(4)第四部分提出了應(yīng)對(duì)公路工程項(xiàng)目群風(fēng)險(xiǎn)的政策建議。本文的主要?jiǎng)?chuàng)新點(diǎn)有以下幾處:(1)拓寬了項(xiàng)目群的概念,使其范圍更加廣泛。項(xiàng)目群管理是一人管理多個(gè)項(xiàng)目,而本文提出項(xiàng)目群管理也可以是多人管理同一個(gè)項(xiàng)目群的不同項(xiàng)目,但這些項(xiàng)目管理的最終目的是在單個(gè)項(xiàng)目成功的基礎(chǔ)上使項(xiàng)目群的效用最大化。(2)提出了單個(gè)項(xiàng)目也可以應(yīng)用項(xiàng)目群管理的思想和方法。單個(gè)項(xiàng)目的“項(xiàng)目群管理”不是為了簡(jiǎn)單問(wèn)題復(fù)雜化,而是為了細(xì)化問(wèn)題,提高項(xiàng)目管理水平。(3)本文根據(jù)風(fēng)險(xiǎn)的特征,借鑒金融工程中金融產(chǎn)品組合理論,創(chuàng)造性的提出了項(xiàng)目群管理風(fēng)險(xiǎn)內(nèi)化和外化的概念,做出了內(nèi)容上的擴(kuò)展,并認(rèn)為風(fēng)險(xiǎn)內(nèi)化和外化是項(xiàng)目群風(fēng)險(xiǎn)管理方法中重要的研究方向之一。(4)對(duì)公路工程項(xiàng)目群管理風(fēng)險(xiǎn)控制提出了一系列建議。主要是在項(xiàng)目群管理過(guò)程中,應(yīng)分清風(fēng)險(xiǎn)主次關(guān)系、建立多方參與的風(fēng)險(xiǎn)管理團(tuán)隊(duì),突出項(xiàng)目群風(fēng)險(xiǎn)管理的優(yōu)勢(shì)、掌握項(xiàng)目群風(fēng)險(xiǎn)管理思想和方法,在單個(gè)項(xiàng)目成功的基礎(chǔ)上,使項(xiàng)目群風(fēng)險(xiǎn)在可控的范圍內(nèi),最大化項(xiàng)目群的整體效用。通過(guò)本文的研究,得出以下結(jié)論:公路工程項(xiàng)目群風(fēng)險(xiǎn)管理應(yīng)結(jié)合項(xiàng)目管理中的集成管理和風(fēng)險(xiǎn)管理,分別以項(xiàng)目總監(jiān)總體管理和單個(gè)項(xiàng)目管理者分別管理為主體,以風(fēng)險(xiǎn)內(nèi)化和風(fēng)險(xiǎn)外化為主要的技術(shù)工具,建立多方參與的、由項(xiàng)目到項(xiàng)目鏈、項(xiàng)目鏈到項(xiàng)目群為管理路徑的風(fēng)險(xiǎn)管理模式。
[Abstract]:This paper mainly studies the risk management of road engineering project risk management group. The group project is a new research direction in project management, which not only includes the project risk management problems, but also include how to manage multiple projects in project management, how to unify the two issues, namely the topics of the theory. Now, due to the rapid development of highway transportation in our country, and the risk of highway engineering has aroused great attention of scholars. With the increasing number of highway projects, the expansion of the scale and project group, the highway engineering project risk is more hidden and complex. How to deal with the highway engineering project risk, it is the practical significance of this thesis. The research method and path is based on the predecessors on the highway project risk, project risk management group management research and project management knowledge in the field of The main theoretical basis, draw valuable lessons about the highway engineering project management at home and abroad, combined with the analysis of typical cases, summed up some experience of risk management of highway engineering project group, and put forward the risk management of highway project group policy suggestions and the future direction of development. The main contents are as follows: (1) the framework of the first part the system of the highway engineering project risk management research status, combined with the present status and characteristics of domestic and foreign risk management of highway engineering, put forward the general theory and method of risk management of highway engineering project group. (2) the second part of the highway engineering risk definition and risk source classification, discusses the characteristics and contents of the project the risk, and constructs the basic framework of the program risk management, risk identification and its basic framework mainly includes project risk, risk assessment, risk quantification Risk control, countermeasures and suggestions. (3) the third part of the analysis of actual cases through the use of highway project group risk management methods, puts forward the suggestions of road engineering project risk. (4) the fourth part of the proposed deal with the highway engineering project risk policy suggestions. The main innovations of this paper are the following: (1) to broaden the concept of the project group, making it more widely. Project management is a management of multiple projects, and proposed project management can also be many different projects with a project management group, but the ultimate objective of project management is to maximize project group the utility based on a single project success. (2) proposed a single project can also apply the ideas and methods of program management. The single project "project management" is not simple to complicate the problem, but in order to improve the fine problem The level of project management. (3) according to the risk characteristics of financial products, from the portfolio theory in financial engineering, put forward the innovative project management concept and risk internalization externalization, made an extension of the content and that the internal and external risk is one of the important research direction of project group risk management method. (4) to the highway engineering project management risk control puts forward a series of suggestions. Mainly in the project management process, we should distinguish between the risk factors, the establishment of participatory risk management team, risk management group highlight the advantages of the project, grasp the project group risk management ideas and methods, based on single project success on the project risk in the controllable range, the overall utility maximization program. Through this research, draw the following conclusions: the group risk management of highway engineering project should be combined with the project management set The management and risk management, with project director of the overall management and project management. As the main body of the management, risk and risk to internalize outside as the main technical tools, the establishment of multi participation, from project to project chain, risk management mode to the project group management path project chain.

【學(xué)位授予單位】:南華大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:F272.3;F426.92

【參考文獻(xiàn)】

相關(guān)碩士學(xué)位論文 前1條

1 牛波;建設(shè)性項(xiàng)目群風(fēng)險(xiǎn)管理方法研究[D];西安建筑科技大學(xué);2006年

,

本文編號(hào):1374351

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/guanlilunwen/chengjian/1374351.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶c7a5f***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com