EPC項(xiàng)目費(fèi)用控制管理中應(yīng)注意的重點(diǎn)
發(fā)布時(shí)間:2018-10-15 19:53
【摘要】:在全球經(jīng)濟(jì)一體化發(fā)展進(jìn)程不斷深入的今天,面對(duì)更廣闊的發(fā)展機(jī)遇與更加嚴(yán)峻的挑戰(zhàn),怎樣使EPC項(xiàng)目順利地進(jìn)行,實(shí)現(xiàn)利潤(rùn)效益的最大化,是企業(yè)亟需解決的一大問(wèn)題。本篇論文中,筆者主要對(duì)EPC項(xiàng)目費(fèi)用控制管理中應(yīng)注意的重點(diǎn)進(jìn)行了分析與探討,以供參考。
[Abstract]:With the deepening of the process of global economic integration, facing the broader development opportunities and more severe challenges, how to make the EPC project proceed smoothly and realize the maximum profit benefit is a big problem that enterprises urgently need to solve. In this paper, the author mainly analyzes and discusses the key points in the EPC project cost control management for reference.
【作者單位】: 中亞管道公司;
【分類號(hào)】:F406.7;F426.92
本文編號(hào):2273667
[Abstract]:With the deepening of the process of global economic integration, facing the broader development opportunities and more severe challenges, how to make the EPC project proceed smoothly and realize the maximum profit benefit is a big problem that enterprises urgently need to solve. In this paper, the author mainly analyzes and discusses the key points in the EPC project cost control management for reference.
【作者單位】: 中亞管道公司;
【分類號(hào)】:F406.7;F426.92
【相似文獻(xiàn)】
相關(guān)期刊論文 前5條
1 豐景春;工程項(xiàng)目費(fèi)用/進(jìn)度績(jī)效灰色整體預(yù)測(cè)模型[J];東南大學(xué)學(xué)報(bào);1999年S1期
2 朱鮮華;;建筑工程其他項(xiàng)目費(fèi)用的編制方法[J];建筑知識(shí);1993年03期
3 楊靜,王消伍;工程項(xiàng)目費(fèi)用索賠的管理[J];建設(shè)監(jiān)理;2003年01期
4 武巖,葛芳;建筑工程項(xiàng)目費(fèi)用的經(jīng)濟(jì)分析[J];建筑經(jīng)濟(jì);1998年12期
5 ;[J];;年期
,本文編號(hào):2273667
本文鏈接:http://sikaile.net/guanlilunwen/caiwuguanlilunwen/2273667.html
最近更新
教材專著