基于TRIBON的船舶管系工費成本測算管理體系研究
本文選題:造船成本 + 管系工藝 ; 參考:《江蘇科技大學(xué)》2017年碩士論文
【摘要】:船舶管系加工是造船工程中極其重要的一個部分,管系工費成本占全船成本約15%,且工費測算的準確性在造船初期就影響著全船的建造成本,管系生產(chǎn)進度也直接決定著全船的建造計劃。因此,想要提高管系工藝生產(chǎn)效率降低造船成本,就要在設(shè)計階段對管系工費進行準確的測算,使管系加工生產(chǎn)任務(wù)能夠精準、高效的下達與使用。TRIBON作為船舶設(shè)計軟件,可通過建立一個實船模型數(shù)據(jù)庫,進行圖紙的繪制以及各種對應(yīng)數(shù)據(jù)的計算,而由于設(shè)計系統(tǒng)的封閉性,導(dǎo)致無法從中直接讀取使用設(shè)計數(shù)據(jù),難以為后續(xù)生產(chǎn)提供工藝成本資料。但通過系統(tǒng)設(shè)計數(shù)據(jù)可以更快速、準確的進行成本測算與數(shù)據(jù)管理,實現(xiàn)設(shè)計與生產(chǎn)的統(tǒng)一。因此,需要通過對系統(tǒng)的二次開發(fā),定義其抽取條件與數(shù)據(jù)轉(zhuǎn)化功能,使系統(tǒng)處理后的信息能夠被直接提取出來用于生產(chǎn)加工的使用,進而降低造船成本。從管系加工實際工作角度來看,我國造船企業(yè)大多遵循事后成本核算為主的傳統(tǒng)核算辦法,往往出現(xiàn)在生產(chǎn)設(shè)計階段管理部門擁有設(shè)計資料,但對管系工費設(shè)計成本卻不得而知,以致并不能滿足成本控制的要求。而且在管系專業(yè),工位復(fù)雜各異,如果按統(tǒng)一噸位標準進行測算,結(jié)果會很不準確,再加上管子加工工序難度大、成本結(jié)構(gòu)復(fù)雜,使得工費的準確測算更是難上加難。如果放棄此費用的準確測算,不僅會導(dǎo)致船舶管系生產(chǎn)無據(jù)可依,出現(xiàn)生產(chǎn)中不必要的資源、時間浪費,更會延長造船周期,影響造船總成本。因此要針對管系工費成本進行測算與管理體系的建立、測算方法的深化研究,這有利于船舶企業(yè)造船成本的有效控制,對于我國造船國際競爭力的提升尤為重要。本文將針對管系工藝的全部工序,建立完整的測算管理結(jié)構(gòu)體系和更精細的測算方法,并從造船實際項目出發(fā),基于TRIBON系統(tǒng)的使用,詳細闡述完整的管系工費測算過程,以便相關(guān)使用者對船舶管系工藝費用測算與管理的研究有所參考。
[Abstract]:Shipbuilding system processing is an extremely important part of shipbuilding engineering. The cost of management system cost accounts for about 15% of the whole ship cost, and the accuracy of the calculation of the work cost affects the construction cost of the whole ship in the early stage of shipbuilding.The production schedule of the management system also directly determines the construction plan of the whole ship.Therefore, in order to improve the production efficiency of pipe system and reduce the cost of shipbuilding, it is necessary to calculate accurately the cost of pipe system in the design stage, so that the task of pipe processing and production can be accurately and efficiently issued and used as ship design software.By setting up a database of ship model, drawing drawings and calculating corresponding data, because of the closure of the design system, it is impossible to read and use the design data directly.It is difficult to provide process cost information for subsequent production.But through the system design data can be more rapid and accurate cost measurement and data management to achieve the unity of design and production.Therefore, it is necessary to define the extraction condition and data transformation function through the secondary development of the system, so that the information processed by the system can be directly extracted for use in production and processing, and then the shipbuilding cost can be reduced.From the point of view of the actual work of management processing, most of the shipbuilding enterprises in our country follow the traditional accounting method of cost accounting after the event, and often appear in the stage of production design that the management department has the design data.However, the design cost of management costs is not known, so it can not meet the requirements of cost control.Moreover, in the management department, the work station is complicated and varied. If the calculation is carried out according to the unified tonnage standard, the result will be very inaccurate. In addition, the pipe processing process is very difficult and the cost structure is complex, which makes the accurate calculation of the work cost even more difficult.If we give up the accurate calculation of the cost, it will not only lead to the ship management system production has no basis, there will be unnecessary resources in production, time waste, but also prolong the shipbuilding cycle, affecting the total cost of shipbuilding.Therefore, it is necessary to establish a management system and a further study on the cost of management and management, which is beneficial to the effective control of shipbuilding costs of shipbuilding enterprises, and is particularly important to enhance the international competitiveness of shipbuilding in China.In this paper, according to the whole working procedure of the pipe system, a complete measuring management structure system and a more precise calculation method will be established. Based on the actual project of shipbuilding and based on the use of TRIBON system, this paper will elaborate in detail the complete calculation process of the work cost of the pipe system.In order to the relevant users of ship piping process cost measurement and management research reference.
【學(xué)位授予單位】:江蘇科技大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:F426.474;F406.7
【相似文獻】
相關(guān)期刊論文 前10條
1 ;船舶管系絕緣新工藝通過技術(shù)鑒定[J];科技信息;1987年12期
2 呂鳳明;掌握船舶管系總況 確保操作安全[J];學(xué)會;1995年09期
3 士;船舶管系加工管理信息系統(tǒng)[J];船舶工業(yè)技術(shù)經(jīng)濟信息;1994年06期
4 ;MPCPSⅡ型船舶管路程序集成系統(tǒng)[J];技術(shù)經(jīng)濟信息;1990年08期
5 許寶余;;基于MDT的船舶管系設(shè)計自動化軟件包[J];價值工程;2011年35期
6 曉三;從兩個縣局的成本測算看通信企業(yè)的經(jīng)濟效果[J];郵電企業(yè)管理;1981年02期
7 李兆玲,杜長梅,彭義利,吉慶明,張愛琴;成本測算表式化方法實證分析[J];經(jīng)濟經(jīng)緯;2001年01期
8 李麗華;陳永法;;國外疾病成本測算方法及應(yīng)用現(xiàn)狀[J];中國藥物經(jīng)濟學(xué);2013年03期
9 焉世國;港口分貨種分操作過程單位成本測算方法探討[J];水運管理;2001年04期
10 汪垂章,顧亞明,鄭偉;浙江省農(nóng)村縣(市)疾病預(yù)防控制成本測算研究[J];衛(wèi)生經(jīng)濟研究;2004年08期
相關(guān)會議論文 前3條
1 劉玉君;李瑞;汪驥;鄧燕萍;;基于約束理論的船舶管系加工進度計劃系統(tǒng)研究[A];2010年MIS/S&A學(xué)術(shù)交流會議論文集(中國造船工程學(xué)會學(xué)術(shù)論文集)[C];2010年
2 宋桃東;;船舶管系原理智能設(shè)計系統(tǒng)[A];2007年CAD/CAM學(xué)術(shù)交流會議論文集[C];2007年
3 李明光;;船舶管子曲形參數(shù)計算[A];廣州市老工程師協(xié)會論文集(第四輯)[C];2008年
相關(guān)重要報紙文章 前7條
1 記者 張銀炎;外高橋船舶管系生產(chǎn)創(chuàng)記錄[N];中國船舶報;2006年
2 記者 劉志良;船舶管系加工應(yīng)走“兩化融合”道路[N];中國船舶報;2011年
3 樓兆成 胡偉民;揚帆集團數(shù)字造船取得突破[N];中國船舶報;2006年
4 周維西;現(xiàn)代造船模式下的船舶管系制造[N];中國船舶報;2006年
5 胡偉民;船舶管系三維設(shè)計系統(tǒng)國內(nèi)首創(chuàng)[N];中國水運報;2007年
6 何志高;醫(yī)院成本測算意義何在?[N];醫(yī)藥經(jīng)濟報;2001年
7 記者 方芳;本市啟動社區(qū)衛(wèi)生成本測算[N];北京日報;2011年
相關(guān)碩士學(xué)位論文 前10條
1 袁友澤;基于TRIBON的船舶管系工費成本測算管理體系研究[D];江蘇科技大學(xué);2017年
2 陳志超;船舶管系工時定額管理系統(tǒng)開發(fā)研究[D];江蘇科技大學(xué);2016年
3 樹健;基于知識庫的船舶管系定額工時測算研究[D];江蘇科技大學(xué);2016年
4 白冰;船舶管系設(shè)計物料清單系統(tǒng)設(shè)計與實現(xiàn)[D];大連理工大學(xué);2004年
5 杜振煌;船舶管系設(shè)計與荷載計算研究[D];大連理工大學(xué);2004年
6 王杰;基于小波變換的船舶管系泄漏檢測定位系統(tǒng)研究[D];重慶交通大學(xué);2012年
7 張杰;超聲波技術(shù)在船舶管系故障檢測中的應(yīng)用[D];重慶交通大學(xué);2013年
8 楊登峰;船舶管系生產(chǎn)施工圖自動生成系統(tǒng)[D];大連理工大學(xué);2006年
9 田秀峰;基于動態(tài)仿真的船舶管系虛擬裝配路徑規(guī)劃方法研究[D];東北大學(xué);2008年
10 李燕;基于人因工程的船舶管系虛擬裝配路徑優(yōu)化技術(shù)研究[D];東北大學(xué);2008年
,本文編號:1754841
本文鏈接:http://sikaile.net/guanlilunwen/caiwuguanlilunwen/1754841.html