EPC模式下配電網(wǎng)客戶工程造價(jià)管理研究
[Abstract]:In order to meet the construction needs of customers and make a good investment decision, it is necessary to determine the project cost more accurately in the initial stage of the project construction. As the investment of electric power facilities in infrastructure construction, the proportion of projects invested by the state or group is very large, and the management and control of the project cost is directly related to the appropriate use of state-owned assets, so there is a direct relationship between the management and control of project costs and the appropriate use of state-owned assets. Rational determination of project cost and effective control are of great significance. EPC project general contracting mode, as a management organization and implementation mode of engineering projects, can determine the total investment and construction cycle as soon as possible. It has been widely used in the field of infrastructure construction in the world, but it has limited application in our country. At present, the vast majority of customer construction projects in distribution network are invested and constructed by customers, and power companies are only used as operation and maintenance units. EPC project general contracting mode is used as a management organization and implementation mode of engineering projects. Because it can determine the total investment and construction cycle as soon as possible, it has been widely used in the field of infrastructure construction in the world, but its application in China is limited. This paper reviews the current research situation and development trend of cost management under EPC management mode and EPC mode at home and abroad, introduces the management theory of EPC general contract mode, and analyzes the main methods and advantages of engineering cost management under EPC mode. Then, the paper analyzes the main process, main links and related problems of cost management under the traditional project management mode. According to the different management links of distribution network customer engineering project construction, this paper compares the EPC management mode with the traditional project cost management mode. This paper mainly analyzes the main factors that affect the project cost management in the different links of the project management of the distribution network customer engineering, and puts forward the effective measures to manage the project cost. Finally, relying on the case of distribution network customer engineering project in area B, through qualitative analysis and quantitative calculation, the different components of customer engineering cost under the EPC management mode and the traditional management mode are analyzed in detail. This paper analyzes how to manage the cost of distribution network customer engineering project in order to meet the requirements of current investors on the project cost management of distribution network customer engineering construction project, and to improve the quality and level of distribution network service as an infrastructure. The research results in this paper are helpful to improve the cost management level of distribution network customer construction projects, reduce the risk of cost management in the process of project implementation, and put forward constructive suggestions on the distribution network projects in which customers invest in construction. It has certain reference significance to carry out the construction cost of power distribution facilities.
【學(xué)位授予單位】:華北電力大學(xué)(北京)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:F426.61;TU723.3
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 伊力亞爾·莫合塔爾;林宏澤;;信息技術(shù)在工程造價(jià)計(jì)算與管理中的應(yīng)用——以BIM技術(shù)為例[J];商;2016年27期
2 李游;;EPC-工程管理新模式[J];中華建設(shè);2016年02期
3 劉運(yùn)思;;全面預(yù)算控制下110kV昌教輸變電工程項(xiàng)目的造價(jià)控制措施分析[J];通訊世界;2016年04期
4 臧侃;;國(guó)際EPC項(xiàng)目合同管理的研究[J];價(jià)值工程;2016年05期
5 鄭大進(jìn);;淺析火電施工EPC項(xiàng)目安全管理[J];企業(yè)技術(shù)開(kāi)發(fā);2016年05期
6 鄭毓;;EPC總承包項(xiàng)目的進(jìn)度管理[J];山東工業(yè)技術(shù);2016年04期
7 呂丹;;設(shè)計(jì)階段造價(jià)咨詢單位的工程造價(jià)控制解析[J];信息化建設(shè);2016年02期
8 王繼源;苗捷;王乾;馬沖;;國(guó)際EPC工程項(xiàng)目投標(biāo)報(bào)價(jià)的思考[J];經(jīng)濟(jì)研究導(dǎo)刊;2016年05期
9 張愛(ài)春;張婉君;;EPC總承包項(xiàng)目的成本控制措施剖析[J];化工管理;2016年05期
10 鐘金昕;;政府投資建設(shè)項(xiàng)目全過(guò)程造價(jià)控制實(shí)例分析[J];經(jīng)營(yíng)管理者;2016年03期
,本文編號(hào):2444307
本文鏈接:http://sikaile.net/gongshangguanlilunwen/2444307.html