SLSP公司預(yù)精焊生產(chǎn)流程優(yōu)化研究
[Abstract]:Production process is an important link in the management of manufacturing enterprises. It refers to the process of continuous processing from raw materials to finished products through certain equipment. Also refers to the production of products from raw materials to finished products in the process of the combination of elements. Production process optimization is an important index for continuous improvement of enterprise production. Through optimization of production process, enterprises can improve production efficiency, reduce waste, reduce inventory, increase production capacity, and then improve the adaptability to market changes. Enhance the core competitiveness of enterprises. According to the actual situation of spiral welded pipe production line of SLSP Co., Ltd., this paper analyzes the current situation of production line process in detail, and finally puts forward the scheme of production process optimization, and seeks for the maximum production capacity after optimization. Based on the theory of production optimization and the theory of simulation, combined with the characteristics and practice of pre-welded spiral welded pipe production line, the main research contents of production process optimization are determined in this paper. When analyzing the production line of pre-finely welded spiral welded pipe, the characteristics of this product line are analyzed first, and the specific technological process of the production line is also analyzed. In addition, the personnel and equipment in the production line are also analyzed. And the main problems in the production process are analyzed. In the production equipment layout and simulation model establishment, according to the characteristics of pre-precision welding production equipment, the main work of each production part is introduced respectively. According to the working characteristics, different simulation modules are selected to build the simulation model of the whole production system based on Dosimis-3 software 1. In the analysis of the bottleneck problem, according to the conclusion of the simulation model and the data analysis, find out the bottleneck position, find out the cause of the bottleneck, and put forward the method to solve the bottleneck. In the process and analysis of simulation optimization, the bottleneck of the system is optimized by changing the flow direction of the steel pipe and improving the skill and the qualified rate of the product, and it is verified by the rerunning of the system. In addition, the work rate of key stations in the system is analyzed by simulation system, and a whole method is proposed to optimize the work rate. Finally, the maximum output of the optimized system is found through the system running again.
【學(xué)位授予單位】:山東大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類(lèi)號(hào)】:F273;F426.4
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 朱繼欣;謝艷峰;;我國(guó)焊管行業(yè)發(fā)展現(xiàn)狀及趨勢(shì)分析[J];冶金管理;2014年05期
2 周武靜;徐學(xué)軍;葉飛;;精益生產(chǎn)組成要素之間的關(guān)系研究[J];管理學(xué)報(bào);2012年08期
3 徐庚保;曾蓮芝;;計(jì)算機(jī)仿真系統(tǒng)述評(píng)[J];計(jì)算機(jī)仿真;2012年04期
4 毛周團(tuán);尹志遠(yuǎn);王少華;劉遲;;螺旋埋弧焊管預(yù)精焊生產(chǎn)工藝[J];焊管;2010年03期
5 楊勇霞;徐克林;;基于價(jià)值流的生產(chǎn)線分析與改善[J];機(jī)床與液壓;2008年12期
6 何楨;岳剛;王麗林;;六西格瑪管理及其實(shí)施[J];數(shù)理統(tǒng)計(jì)與管理;2007年06期
7 李永先;胡祥培;熊英;;物流系統(tǒng)仿真研究綜述[J];系統(tǒng)仿真學(xué)報(bào);2007年07期
8 陶雨;;豐田汽車(chē):精益模式的實(shí)踐[J];中國(guó)投資;2007年01期
9 李鶴林;油氣輸送鋼管的發(fā)展動(dòng)向與展望[J];焊管;2004年06期
10 王新榮,范玉青;基于精益生產(chǎn)的企業(yè)價(jià)值流的研究[J];制造業(yè)自動(dòng)化;2002年08期
相關(guān)碩士學(xué)位論文 前5條
1 李忠民;基于價(jià)值流分析的N公司M生產(chǎn)線優(yōu)化研究[D];山東大學(xué);2014年
2 唐夢(mèng);制造企業(yè)生產(chǎn)流程的Arena仿真與優(yōu)化研究[D];成都理工大學(xué);2012年
3 郭家瑜;基于精益管理的Y企業(yè)生產(chǎn)流程再造研究[D];山東大學(xué);2009年
4 王娜娜;林德中國(guó)公司實(shí)施精益六西格瑪研究[D];廈門(mén)大學(xué);2009年
5 陸柳柳;開(kāi)利風(fēng)冷空調(diào)機(jī)組生產(chǎn)流程優(yōu)化研究[D];上海交通大學(xué);2009年
,本文編號(hào):2191154
本文鏈接:http://sikaile.net/gongshangguanlilunwen/2191154.html