13合同范本下逾期竣工違約金的確定問題研究

發(fā)布時(shí)間:2018-01-03 06:41

  本文關(guān)鍵詞:13合同范本下逾期竣工違約金的確定問題研究 出處:《建筑經(jīng)濟(jì)》2016年12期  論文類型:期刊論文


  更多相關(guān)文章: 合同范本 逾期竣工 違約金約定 違約金調(diào)整


【摘要】:通過文獻(xiàn)分析將逾期竣工違約金的確定問題分解為違約金的約定和約定過高情況下的調(diào)整兩個(gè)方面;分析發(fā)包人在約定逾期竣工違約金時(shí)應(yīng)考慮的因素及約定的兩種方式,具體研究不同方式下違約金金額的確定。最后,通過整理相關(guān)法律文件明確約定過高情況下逾期竣工違約金調(diào)整的兩個(gè)基本原則,并據(jù)此將逾期竣工違約金的調(diào)整分為實(shí)際損失可計(jì)量與不可計(jì)量兩種情況并作具體考慮。
[Abstract]:Based on the analysis of literature , the determination of overdue liquidated damages is decomposed into two aspects : the agreement of the liquidated damages and the adjustment of the agreement . The two basic principles for the adjustment of the liquidated damages in different ways are discussed in detail through the analysis of the factors and the agreements which the Employer should take into account when the overdue liquidated damages are agreed . Finally , the adjustment of overdue liquidated damages is divided into two basic principles of actual loss , measurable and non - measurable .

【作者單位】: 天津理工大學(xué)管理學(xué)院;天津達(dá)勝琦基礎(chǔ)工程有限公司;
【基金】:國家自然科學(xué)基金項(xiàng)目“PPP項(xiàng)目中信任的動(dòng)態(tài)演化機(jī)理研究:基于政府部門視角”(71372110) 教育部人文社會(huì)科學(xué)研究青年基金項(xiàng)目“PPP項(xiàng)目合同柔性影響再談判機(jī)理研究:基于參照點(diǎn)效應(yīng)”(15YJC630082)
【分類號(hào)】:D923.6
【正文快照】: 1引言工程建設(shè)項(xiàng)目一般具有投資大、周期長、易受政策影響以及協(xié)作關(guān)系復(fù)雜等特點(diǎn),因而工期延誤難以避免,而當(dāng)關(guān)鍵路徑出現(xiàn)問題時(shí)便會(huì)造成逾期竣工[1]。為了督促承包人在合同約定的期限內(nèi)完工,發(fā)包人會(huì)在施工合同中約定逾期竣工違約金,一旦承包人造成的逾期竣工事實(shí)發(fā)生,發(fā)包,

本文編號(hào):1372843

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/falvlunwen/minfalunwen/1372843.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶cf2bf***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com