架空通信光纜施工衛(wèi)勤保障特點(diǎn)及做法
發(fā)布時(shí)間:2018-04-29 04:41
本文選題:架空光纜施工 + 衛(wèi)勤保障。 參考:《解放軍預(yù)防醫(yī)學(xué)雜志》2000年02期
【摘要】:目的 :為了提高架空通信光纜施工的衛(wèi)勤保障能力 ,保障施工部隊(duì)官兵的健康。方法 :采用靠前保障 ,跟蹤服務(wù) ,周密計(jì)劃 ,科學(xué)施工 ;宣傳到位 ,落實(shí)制度等手段 ,針對架空通信光纜施工進(jìn)行衛(wèi)生保障。結(jié)果 :部隊(duì)的晝夜發(fā)病率控制在 0 .96‰。未發(fā)生傳染病及食物中毒 ,較好地保障了施工任務(wù)的順利完成。結(jié)論 :架空通信光纜 ,危險(xiǎn)性大 ,技術(shù)性強(qiáng) ,衛(wèi)勤保障難度大 ,應(yīng)緊緊抓住衛(wèi)勤保障特點(diǎn) ,積極主動(dòng) ,科學(xué)周密地搞好衛(wèi)勤保障。
[Abstract]:Objective: to improve the health support ability of aerial communication optical cable construction and ensure the health of officers and soldiers. Methods: by means of advanced guarantee, tracking service, careful planning, scientific construction, propaganda in place and carrying out the system, sanitary guarantee was carried out for the construction of aerial communication optical cable. Results: the incidence rate of day and night was controlled at 0. 96 鈥,