齊賽創(chuàng)意動(dòng)漫產(chǎn)業(yè)園項(xiàng)目成本管理研究
[Abstract]:In recent years, the creative animation industry has developed in full swing in Beijing, Shanghai, Shenzhen, Hangzhou and Qingdao, and a large number of creative animation industry parks have risen rapidly throughout the country. For the rapid development of China's creative animation industry to provide a solid foundation and good conditions. At the same time, in order to promote the economic development of the second-tier cities and inject new vitality into the urban economy, in recent years, a number of new creative animation industry park projects have appeared in the second-and third-tier cities, but compared with the industrial parks in foreign and first-tier cities, The overall level of project management in small and medium-sized industrial parks in second-tier cities is relatively low in the process of development, and one of the most outstanding aspects is focused on cost management. Making many small and medium creative animation industry park enterprises into a lack of sustained development, low efficiency, low profit chaos competition environment. Therefore, how to improve the cost control level of creative animation industry park in small and medium cities has universal significance. This paper takes the animation industry park as the object of study, through the analysis and arrangement of other projects of Qisai Industry and Trade Co., Ltd. in the past, finds that the cost management system of this company mainly lacks the market research and feasibility study of the project. The cost control in the project design phase is ignored, the fairness of the bidding stage is insufficient, the direct cost in the construction stage is too high, and the settlement of the completed project is unreasonable. In view of the problems found, this paper takes the specific situation of the project of Qisai creative animation industry park as the starting point, uses the scientific theory and method of cost management as the project decision-making stage, the project design stage, the project bidding stage, the project construction stage, the project design stage, the project bidding stage, the project construction stage, Cost control in different stages of the project, such as the completion stage of the project, is designed to make scientific decisions by strengthening the risk study of the project, and through the use of quota design, Optimizing the design scheme and carrying out the concrete measures of the design bidding to strengthen the cost management in the design stage, strengthening the cost control in the bidding stage by strictly examining the qualification of the bidding enterprise, formulating reasonable and scientific bidding system and procedure, etc. The method of earned value is used to correct the cost, to establish effective management of full staff cost and to make sure the assessment standard to control the cost of the project, to strengthen the cost control of the project in the construction phase, and to strengthen the cost control of the project in the stage of completion of the project. Check and review the manpower and material resources in the whole development process, and observe the implementation of project cost management through actual data. The conclusion is that the cost control of the creative animation industry park project is a systematic process, and strengthening the cost management of the creative animation industry park project can not be limited to the construction stage of the project. Only by applying scientific and effective cost control measures to the whole project development process can we achieve the expected goal of project interest and cost control, and improve the return on investment of creative animation industry park in small and medium-sized cities. In order to improve the economic interests of enterprises.
【學(xué)位授予單位】:中國海洋大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2011
【分類號】:G124;F275.3
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 朱建平;;談?wù)剟?chuàng)意產(chǎn)業(yè)園項(xiàng)目的預(yù)算管理與成本控制[J];才智;2009年17期
2 劉麗卿;;新形勢下房地產(chǎn)企業(yè)成本控制的探討[J];商業(yè)經(jīng)濟(jì);2009年24期
3 張瑩璞;;房地產(chǎn)開發(fā)過程中的成本控制[J];建筑設(shè)計(jì)管理;2010年03期
4 李乃瑛;;施工期間質(zhì)量及成本的控制[J];科技風(fēng);2009年14期
5 陳長亮;;利用掙值法提高房地產(chǎn)項(xiàng)目成本管理的探討[J];會計(jì)之友(中旬刊);2010年03期
6 黃先鋒;謝英杰;王勝;曹智強(qiáng);;青島地區(qū)房地產(chǎn)開發(fā)項(xiàng)目建設(shè)階段成本控制研究[J];青島理工大學(xué)學(xué)報(bào);2009年06期
7 鄧紅梅;;淺析房地產(chǎn)開發(fā)企業(yè)成本管理方法[J];青?萍;2010年01期
8 王林;;最小施工單元成本管理方法[J];施工技術(shù);2008年12期
9 顧鵬;;房地產(chǎn)建設(shè)項(xiàng)目的成本管理與控制[J];建材技術(shù)與應(yīng)用;2009年05期
10 馮磊;張艷瓊;;房地產(chǎn)開發(fā)項(xiàng)目設(shè)計(jì)與施工階段成本控制[J];中國新技術(shù)新產(chǎn)品;2010年10期
相關(guān)碩士學(xué)位論文 前4條
1 劉曉輝;中國動(dòng)漫產(chǎn)業(yè)國際競爭戰(zhàn)略研究[D];湖南大學(xué);2008年
2 劉作彤;項(xiàng)目施工過程中的成本控制[D];北京郵電大學(xué);2009年
3 張祖宇;房地產(chǎn)開發(fā)項(xiàng)目主要階段成本控制研究與應(yīng)用[D];西南交通大學(xué);2009年
4 王剛;創(chuàng)意產(chǎn)業(yè)發(fā)展中的項(xiàng)目管理[D];上海交通大學(xué);2010年
,本文編號:2290385
本文鏈接:http://sikaile.net/wenyilunwen/dongmansheji/2290385.html