基于太陽風(fēng)參數(shù)的電網(wǎng)GIC事件的預(yù)測(cè)方法研究
[Abstract]:Important progress has been made in the study of geomagnetic induced current (Geomagnetically Induced Current, GIC) induced by geomagnetic storms in China, including revealing the mechanism of geomagnetic storms against GIC derived from power grids, and exploring the serious harm of geomagnetic storms to the future power grid in China. Protection against geomagnetic storm grid disaster has become a problem to be solved. In this paper, a method for predicting GIC events based on solar wind parameters is proposed, which can be used to calculate the solar wind observation data, and to predict the GIC, of power grid to provide decision support for operational dispatching and disaster prevention strategy. The main work and innovations of this paper are as follows: for the Gansu 750kV and 330kV power grid and the newly built 1000kV and 500kV grid, the whole node model of power network GIC and the node admittance matrix algorithm are used to calculate. In this paper, the interaction of GIC in double-voltage grid is analyzed, the characteristics of GIC interaction in double-voltage power grid are explored, and the mechanism of geomagnetic storm induced disaster GIC is revealed, which provides a data basis for the study of disaster prevention. Based on the calculation of solar wind observation data, the demand of power grid GIC is forecasted. The relationship between the characteristic parameters of GIC, spectrum and coronal mass ejection (Coronal Mass ejection, CME) and interplanetary solar wind is analyzed. The contribution of solar wind velocity and other parameters to GIC is found out, and the idea of using solar wind data to predict GIC is put forward. Based on the research results of the relationship between GIC characteristic parameters and solar wind observation parameters, a global MHD model is established to predict the power grid GIC, based on the research of space physics scientists. A preliminary relationship between the GIC event and the CME event and the interplanetary solar wind event is established, and an algorithm for predicting the power grid GIC using the interplanetary solar wind observation data is proposed. The validity of the algorithm is verified by the GIC monitoring data. In this paper, the mechanism of geomagnetic storm derived disastrous GIC is revealed, which provides data for geomagnetic storm disaster to be included in the national key R & D program. A method for predicting GIC events in power grid based on solar wind observation data is proposed. It is of great significance to establish disaster prevention strategy for operation scheduling and maintenance.
【學(xué)位授予單位】:華北電力大學(xué)(北京)
【學(xué)位級(jí)別】:博士
【學(xué)位授予年份】:2016
【分類號(hào)】:P353;TM73
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 任琪;;電網(wǎng)工程進(jìn)度控制[J];科技資訊;2009年04期
2 李東亮;周學(xué)文;韓文軍;;電網(wǎng)工程設(shè)計(jì)三維地理信息系統(tǒng)應(yīng)用探討[J];能源技術(shù)經(jīng)濟(jì);2010年03期
3 賀學(xué)榮;;電網(wǎng)建設(shè)中需要重視的幾個(gè)問題之我見[J];廣東科技;2012年17期
4 莊彥斯;;電網(wǎng)建設(shè)中項(xiàng)目管理的有效控制[J];廣東科技;2009年08期
5 郭躍平;;工程量清單在山西省電網(wǎng)工程招投標(biāo)中的應(yīng)用[J];山西科技;2012年06期
6 袁宗瓊;;論如何從電力調(diào)度平臺(tái)提高電網(wǎng)效益[J];科技致富向?qū)?2013年30期
7 余鶯;;電網(wǎng)項(xiàng)目投資計(jì)劃管理研究[J];科技創(chuàng)新與生產(chǎn)力;2012年08期
8 佟曉東;電網(wǎng)工程建設(shè)監(jiān)理安全工作的現(xiàn)狀及應(yīng)對(duì)[J];大眾科技;2005年09期
9 舒?zhèn)テ?;對(duì)完善電網(wǎng)建設(shè)工程項(xiàng)目管理的思考[J];科技風(fēng);2009年22期
10 史哲;;如何加強(qiáng)電網(wǎng)建設(shè),提高投資時(shí)效[J];科技信息;2012年26期
相關(guān)會(huì)議論文 前10條
1 江水生;;電網(wǎng)建設(shè)外部環(huán)境問題分析及對(duì)策[A];2009年電力設(shè)施保護(hù)工作交流大會(huì)論文集[C];2009年
2 公茂獎(jiǎng);王俊增;孫玉欣;;電網(wǎng)工程施工企業(yè)在高原地區(qū)電網(wǎng)工程建設(shè)階段的成本控制11點(diǎn)措施[A];2014年2月建筑科技與管理學(xué)術(shù)交流會(huì)論文集[C];2014年
3 楊靜;;對(duì)縣城電網(wǎng)改造的技術(shù)的建議和措施[A];廣西電機(jī)工程學(xué)會(huì)第九屆青年學(xué)術(shù)論壇論文集[C];2006年
4 凌征仲;;云南電網(wǎng)電力社會(huì)普遍服務(wù)的目標(biāo)與途徑[A];2007云南電力技術(shù)論壇論文集[C];2007年
5 黃蓉;;西部電網(wǎng)配置滯后 新能源發(fā)展遇困局[A];中國(guó)風(fēng)電(2013年09月)[C];2013年
6 楊宗屏;;論述降低電網(wǎng)工程造價(jià)[A];浙江電力科學(xué)發(fā)展[C];2005年
7 鄭燕;崔萬福;;電網(wǎng)工程技術(shù)經(jīng)濟(jì)仿真關(guān)鍵技術(shù)[A];電網(wǎng)工程造價(jià)管理優(yōu)秀論文[C];2011年
8 張勇;;電網(wǎng)企業(yè)資產(chǎn)管理外部環(huán)境影響因素分析[A];第十二屆中國(guó)管理科學(xué)學(xué)術(shù)年會(huì)論文集[C];2010年
9 ;新建電源接入電網(wǎng)監(jiān)管暫行辦法[A];中國(guó)農(nóng)機(jī)工業(yè)協(xié)會(huì)風(fēng)能設(shè)備分會(huì)《風(fēng)能產(chǎn)業(yè)》(2014年第3期)[C];2014年
10 喬淑芳;荀志遠(yuǎn);索亮;;QFD方法在電網(wǎng)工程設(shè)計(jì)中的應(yīng)用[A];第十一屆中國(guó)管理科學(xué)學(xué)術(shù)年會(huì)論文集[C];2009年
相關(guān)重要報(bào)紙文章 前10條
1 王震邋班永威;我市縣城電網(wǎng)建設(shè)與改造工程順利通過省級(jí)驗(yàn)收[N];駐馬店日?qǐng)?bào);2007年
2 國(guó)家電力公司華中公司 桂衡;政府監(jiān)管下電網(wǎng)建設(shè)投融資態(tài)勢(shì)[N];中國(guó)電力報(bào);2003年
3 本報(bào)記者 王拉田;十大電網(wǎng)工程進(jìn)展順利[N];寶雞日?qǐng)?bào);2006年
4 記者 劉輝;電監(jiān)會(huì)通報(bào)電網(wǎng)安全檢查情況[N];中國(guó)電力報(bào);2006年
5 董玉平;電網(wǎng)崛起 光耀戈壁[N];國(guó)家電網(wǎng)報(bào);2007年
6 林光華;電網(wǎng)與電源協(xié)調(diào)發(fā)展[N];華東電力報(bào);2007年
7 記者 何迪 通訊員 李旭東;我市縣城電網(wǎng)工程通過省發(fā)改委驗(yàn)收[N];孝感日?qǐng)?bào);2007年
8 記者 孔慧邋見習(xí)記者 羅非;今年全市電網(wǎng)建設(shè)將投資10億元[N];商丘日?qǐng)?bào);2008年
9 李志浩邋張小,
本文編號(hào):2259269
本文鏈接:http://sikaile.net/shoufeilunwen/jckxbs/2259269.html