新聞出版業(yè)重大工程項目中標(biāo)準(zhǔn)的制定與管理
發(fā)布時間:2018-05-25 01:26
本文選題:重大工程 + 數(shù)字出版 ; 參考:《出版發(fā)行研究》2016年05期
【摘要】:工程標(biāo)準(zhǔn)的制定不能"標(biāo)準(zhǔn)先行",也不能滯后,既要與工程同時啟動,又要提前于工程其他技術(shù)方完成。為了預(yù)防"兩張皮"的情況出現(xiàn),工程標(biāo)準(zhǔn)既來源于工程又要服務(wù)于工程,所以工程標(biāo)準(zhǔn)的編制就是一個"邊寫邊用,邊用邊改"的過程。
[Abstract]:The development of engineering standard cannot be " standard first " and can not be delayed . It is not only to be started at the same time as the project , but also to be completed in advance in other technical aspects of the project . In order to prevent the occurrence of " two skins " , the engineering standard is derived from both the engineering and the engineering . Therefore , the preparation of the engineering standard is a process of " edge writing and edge modification " .
【作者單位】: 中國新聞出版研究院數(shù)字出版標(biāo)準(zhǔn)符合性測試北京市重點(diǎn)實驗室;
【分類號】:G239.2
,
本文編號:1931466
本文鏈接:http://sikaile.net/shekelunwen/chubanfaxing/1931466.html