朔黃鐵路新建LTE寬帶移動(dòng)通信工程施工風(fēng)險(xiǎn)管理研究
[Abstract]:Railway construction is in the period of extremely rapid development in China. The rapid development of high-speed railway and freight heavy haul railway has laid a solid foundation for the future economic development of our country. Therefore, the construction of railway communication project is also concerned by the construction of railway engineering. As the railway safety, the railway mobile communication, which is the key of dispatching and control, has more and more responsibilities. Railway mobile communication project is characterized by high construction technology, difficult coordination, high engineering quality, complex internal organization and extensive external connection. There are a lot of uncertain risks in the construction process. In order to ensure that the project can be completed on schedule and realize the maximum social, economic and environmental benefits, it is of great practical significance to strengthen the risk management in the construction process and to avoid the risk in the construction process. The main research object of this paper is the new LTE broadband mobile communication project of Shuohuang Railway, which is the first domestic project in which LTE broadband mobile communication is applied to railway communication. There is no precedent for the construction of the project, and the research on the construction safety management of the railway LTE broadband mobile communication project is even less. Therefore, this paper studies the risk management of the new LTE broadband mobile communication project of Shuohuang Railway combined with the practical problems encountered in the process of construction and the experience of the safety management in the construction of the railway communication project in the past. After consulting a large number of documents of construction risk management, the paper analyzes the risks encountered in the construction of Shuohuang Railway LTE broadband mobile communication project by using the theory of risk management. This paper discusses the general steps of risk management: risk identification, risk evaluation and risk response. In the process of risk identification, the flow chart method and expert investigation method are used to identify the risk factors, and then the risk evaluation index system is constructed according to the identified risk. In the process of risk evaluation, considering the uncertainty and fuzziness of project risk, a risk evaluation model combining AHP and fuzzy comprehensive evaluation is put forward. Until the final stage of risk response, the result of risk identification and evaluation, combined with the characteristics of Shuohuang railway construction project, according to the established risk evaluation index system, the paper put forward the corresponding risk management countermeasures. The main contribution of this paper is that taking the actual engineering case as the research object and combining the theory of risk management, the risk evaluation index system, the risk evaluation results and the risk response countermeasures of Shuohuang Railway are obtained. The paper has certain guidance and reference significance for the future construction of railway LTE broadband mobile communication project.
【學(xué)位授予單位】:石家莊鐵道大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TN929.5
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 崔鋼;吳鳳平;李明孝;王瑋;;基于模糊層次分析法的公路橋梁施工安全風(fēng)險(xiǎn)評(píng)價(jià)研究[J];中國市場;2016年41期
2 裴本資;;鐵路通信信號(hào)系統(tǒng)集成項(xiàng)目管理研究[J];山東工業(yè)技術(shù);2016年06期
3 吳化賢;;淺談鐵路營業(yè)線通信、信號(hào)工程施工安全風(fēng)險(xiǎn)與管理對(duì)策[J];建材與裝飾;2016年09期
4 楊桂林;;關(guān)于鐵路電氣化改造工程施工安全風(fēng)險(xiǎn)管理分析[J];建筑安全;2015年09期
5 汪大偉;;鐵路工程項(xiàng)目施工風(fēng)險(xiǎn)管理及措施分析[J];科技風(fēng);2015年10期
6 梁寅生;;探究鐵路工程項(xiàng)目施工風(fēng)險(xiǎn)管理及對(duì)策[J];科技資訊;2015年12期
7 周德紅;高黎穎;張飛;王倩;;基于模糊層次分析法的地鐵施工風(fēng)險(xiǎn)評(píng)估[J];價(jià)值工程;2015年01期
8 應(yīng)國柱;汪鵬程;朱大勇;張永亮;秦榛;;模糊層次分析法的改進(jìn)及其在地鐵施工風(fēng)險(xiǎn)評(píng)估中的應(yīng)用[J];合肥工業(yè)大學(xué)學(xué)報(bào)(自然科學(xué)版);2014年10期
9 陳珍懿;;鐵路工程項(xiàng)目施工風(fēng)險(xiǎn)管理及對(duì)策研究[J];價(jià)值工程;2014年07期
10 陳自海;陳建軍;楊建輝;;基于模糊層次分析法的盾構(gòu)隧道施工風(fēng)險(xiǎn)分析[J];地下空間與工程學(xué)報(bào);2013年06期
相關(guān)碩士學(xué)位論文 前4條
1 段輝;京滬高速鐵路通信工程項(xiàng)目風(fēng)險(xiǎn)管理研究[D];西南交通大學(xué);2015年
2 楊惠文;鐵路建設(shè)工程施工安全風(fēng)險(xiǎn)網(wǎng)格化管理及應(yīng)用研究[D];北京交通大學(xué);2015年
3 楊娜;基于模糊影響圖的鐵路電氣化改造施工安全風(fēng)險(xiǎn)評(píng)價(jià)[D];西南交通大學(xué);2014年
4 冉龍華;鐵路工程項(xiàng)目施工風(fēng)險(xiǎn)管理及對(duì)策研究[D];西南交通大學(xué);2007年
,本文編號(hào):2407110
本文鏈接:http://sikaile.net/kejilunwen/xinxigongchenglunwen/2407110.html