GYTX設(shè)備安裝工程項(xiàng)目進(jìn)度管理研究
[Abstract]:In order to support the development of market business and ensure the network advantage of China Mobile, Guangyuan Mobile decided to carry out the GYTX equipment installation project. The goal of the current project is to do a good job of ensuring the Spring Festival, to solve the problem of network quality survey, and to give priority to resolving the hot spot coverage of data above 600m in villages and towns and the coverage of important highways combined with the Spring Festival return home. According to the current network traffic and traffic growth forecast, select high traffic, competitive area for network expansion, at the same time turn on the carrier convergence function; The project task is heavy, time is tight, and project schedule management is of great significance to the successful completion of the project. Based on the theory and method of project schedule management and the characteristics of mobile base station project, the research of GYTX equipment installation project schedule management is carried out in this paper. First of all, the general situation of GYTX equipment installation project is analyzed systematically, and the business requirement of GYTX equipment installation project is put forward. According to the present situation of Guangyuan mobile base station and the project construction resource condition, the project construction scale and main project quantity are put forward. And project organization and schedule. Secondly, the scope and flow of the main equipment installation project in wireless network are analyzed. According to the related materials, the time limit of each sub-activity in the project is estimated by using the method of "three-point estimation", and the logical relationship of the project is determined. The network plan is drawn, the key path of the project is determined, and the reasonable operation of the project is ensured. Then, the project schedule control scheme of GYTX equipment installation project is put forward. According to the actual situation of the project, the Gantt chart is used to compare the planned progress with the actual progress, and then the deviation analysis is carried out. These factors that affect the progress of the project mainly come from the construction unit, the equipment unit and the construction unit. In order to prevent the delay of progress, some measures are taken to correct the deviation of project schedule, which to a certain extent ensure the successful implementation of the project. Finally, the guarantee measures of project schedule control are put forward, including personnel quality guarantee, construction organization and material support, internal and external environment guarantee and so on. With the rapid development of mobile communication, 4G network plays an important role in people's life, and mobile communication is entering the 5G era. Project schedule management and control requirements are more stringent. The achievements of this paper are scientific planning, effective supervision and reasonable control of the project schedule management of communication enterprises, so as to improve the level of enterprise project management, and have important theoretical practical value and practical significance for the development of communication enterprises.
【學(xué)位授予單位】:電子科技大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TN929.5
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 王榮;;4G無線網(wǎng)絡(luò)建設(shè)項(xiàng)目的進(jìn)度管理淺析[J];中國新通信;2016年15期
2 許洪濤;;基于項(xiàng)目進(jìn)度管理的移動通信工程項(xiàng)目研究[J];通訊世界;2015年15期
3 易兵;田北平;鐘華;;基于BIM-4D技術(shù)的項(xiàng)目進(jìn)度管理研究[J];價值工程;2015年21期
4 馬東岐;;建筑工程項(xiàng)目進(jìn)度管理及控制技術(shù)[J];中國建材科技;2014年S2期
5 吳宏偉;;4G移動通信無線網(wǎng)絡(luò)建設(shè)項(xiàng)目的質(zhì)量管理研究[J];中國新通信;2014年16期
6 王艷;;淺談建筑工程項(xiàng)目進(jìn)度管理[J];中小企業(yè)管理與科技(下旬刊);2013年11期
7 農(nóng)光東;;建筑工程項(xiàng)目進(jìn)度管理研究[J];東方企業(yè)文化;2012年10期
8 張建明;劉俊勇;;電力系統(tǒng)建設(shè)項(xiàng)目進(jìn)度3D可視化關(guān)鍵技術(shù)[J];電力自動化設(shè)備;2010年06期
9 周國華;韓姣杰;;“小業(yè)主大咨詢”模式下建設(shè)項(xiàng)目業(yè)主駐勤人員激勵監(jiān)督機(jī)制研究——以京滬高速鐵路建設(shè)項(xiàng)目為背景[J];管理評論;2009年12期
10 佘立中;溫冉;;大型集群工程進(jìn)度管理的復(fù)雜性分析與對策研究[J];施工技術(shù);2009年05期
相關(guān)碩士學(xué)位論文 前10條
1 郭海兵;SK移動4G無線網(wǎng)工程項(xiàng)目計劃與風(fēng)險管理[D];南京郵電大學(xué);2016年
2 許波;四川移動巴中4G基站配套工程項(xiàng)目進(jìn)度管理研究[D];電子科技大學(xué);2016年
3 陽軍;攀枝花移動4G基站建設(shè)項(xiàng)目進(jìn)度和風(fēng)險管理研究[D];電子科技大學(xué);2016年
4 孟泓羽;項(xiàng)目管理信息系統(tǒng)在移動4G網(wǎng)絡(luò)建設(shè)中的應(yīng)用[D];吉林大學(xué);2016年
5 韓芝勇;廣元移動4G終端促銷項(xiàng)目管理研究[D];電子科技大學(xué);2016年
6 傅林發(fā);市場營銷活動項(xiàng)目化管理在三明移動4G市場拓展應(yīng)用研究[D];南京郵電大學(xué);2015年
7 田丹;黑龍江移動4G網(wǎng)絡(luò)一期工程項(xiàng)目進(jìn)度管理研究[D];吉林大學(xué);2015年
8 袁乾龍;考慮不確定性的項(xiàng)目進(jìn)度控制研究[D];華東理工大學(xué);2013年
9 陳斐;基于關(guān)鍵鏈技術(shù)的多項(xiàng)目管理研究[D];上海交通大學(xué);2012年
10 艾鑫;多項(xiàng)目管理中資源沖突及優(yōu)化配置研究[D];重慶大學(xué);2011年
,本文編號:2380843
本文鏈接:http://sikaile.net/kejilunwen/xinxigongchenglunwen/2380843.html