移動(dòng)基站建設(shè)工程項(xiàng)目風(fēng)險(xiǎn)管理研究
[Abstract]:The realization of mobile communication needs the equipment of the radio station, and the radio station is the mobile base station. In the area with radio, the main and important facility to support the mobile phone call and other data service function is the mobile base station. The construction of mobile base station will be a high risk and high investment project. The success of the project is affected by many factors, from the base station construction planning to the implementation of the whole process of various uncertain factors. If we can clearly understand and manage many uncertain risk factors in the construction and implementation of mobile base station, to some extent, we can improve the comprehensive benefit of the base station construction project, and improve the progress, quality and reliability of the base station construction project. In order to reduce the corresponding management pressure and avoid the interference of risk factors, the expected goal of mobile base station construction is fully guaranteed. In view of this, the author analyzes the application of risk management in the construction project of Chengdu Mobile Base Station under the background of the actual situation of the current work in the Mobile Company, taking the new phase of Chengdu Mobile Base Station Construction Project as the background, and analyzes the application of risk management in the construction of the base station project. Research on risk control strategy of mobile base station construction project is put forward. At the same time, I hope to apply the theories, methods and tools of project management and project risk management to the base station construction project of Chengdu Mobile Company, and contribute to the goal of introducing project risk control into the base station construction of Chengdu Mobile. It is beneficial to realize the fine management goal advocated by Chengdu Mobile Company's communication equipment access project, and to improve the quality of Chengdu Mobile Communication Construction Project. In order to improve the return on investment of related projects and mobile communication industry high-speed, healthy development contribution. Based on the above background, the thesis is divided into six parts. In this paper, the background, purpose and significance of the research are expounded, and the contents, methods and technical route of the research are pointed out. Then summarizes and arranges the related theories of project management and risk management, at the same time summarizes the domestic and foreign research status of construction project risk management; Then according to the project risk identification methods and standards, the mobile base station construction project risk identification analysis, collate the project risk factors; Then according to the project risk evaluation criteria and occurrence probability, the qualitative analysis and quantitative evaluation of the project risk are carried out. In addition, according to the characteristics and difficulties of project risk management, the paper puts forward the strategy of project risk control, response and dynamic monitoring, and puts forward the proposal of project emergency management. Finally, the conclusion of the paper is drawn. In this paper, the typical characteristics of mobile base station construction project risk management practice as the entry point, on its specific problems and countermeasures to carry out research, The methods and measures of risk management play a certain role in the actual promotion of Chengdu Mobile Extranet project, and also provide a valuable reference for the risk management of similar information management system projects.
【學(xué)位授予單位】:電子科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TN929.5
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李永海;;考慮風(fēng)險(xiǎn)關(guān)聯(lián)的項(xiàng)目風(fēng)險(xiǎn)應(yīng)對(duì)的案例決策分析方法[J];系統(tǒng)工程;2016年06期
2 許曉翠;;信息系統(tǒng)項(xiàng)目建設(shè)風(fēng)險(xiǎn)管理的思考[J];電子制作;2015年12期
3 呂文學(xué);李洪梅;;工程項(xiàng)目管理的國際化[J];國際經(jīng)濟(jì)合作;2015年01期
4 覃寧;;淺議電網(wǎng)企業(yè)信息系統(tǒng)開發(fā)建設(shè)項(xiàng)目風(fēng)險(xiǎn)管理[J];中國新技術(shù)新產(chǎn)品;2012年24期
5 徐立;;淺談信息系統(tǒng)項(xiàng)目的風(fēng)險(xiǎn)管理[J];計(jì)算機(jī)光盤軟件與應(yīng)用;2012年01期
6 劉鳴;高艷;;工程建設(shè)項(xiàng)目應(yīng)急管理系統(tǒng)研究[J];項(xiàng)目管理技術(shù);2011年03期
7 強(qiáng)茂山;林正航;陽波;;項(xiàng)目管理的多維度集成創(chuàng)新模式研究[J];科技進(jìn)步與對(duì)策;2010年19期
8 湯玉江;;水利工程施工階段的質(zhì)量控制及質(zhì)量保證措施[J];科技創(chuàng)新導(dǎo)報(bào);2009年06期
9 李強(qiáng);張靜;張耀坦;;蒙特卡洛仿真技術(shù)在工程進(jìn)度計(jì)劃中的應(yīng)用[J];長(zhǎng)江大學(xué)學(xué)報(bào)(自科版)理工卷;2007年02期
10 魏波周;;淺談施工項(xiàng)目和進(jìn)度的管理[J];科技咨詢導(dǎo)報(bào);2007年10期
相關(guān)博士學(xué)位論文 前1條
1 趙華;風(fēng)險(xiǎn)分擔(dān)對(duì)工程項(xiàng)目管理績(jī)效的作用機(jī)理研究[D];天津大學(xué);2012年
相關(guān)碩士學(xué)位論文 前5條
1 彭琨;基于WEB的成都移動(dòng)基站管理系統(tǒng)設(shè)計(jì)與實(shí)現(xiàn)[D];大連理工大學(xué);2016年
2 王小楓;項(xiàng)目管理在移動(dòng)應(yīng)急通信保障中的應(yīng)用[D];南京郵電大學(xué);2012年
3 籍晨香;電信運(yùn)營(yíng)商3G工程項(xiàng)目風(fēng)險(xiǎn)管理研究[D];太原理工大學(xué);2010年
4 鄭經(jīng)威;TD-SCDMA基站建設(shè)項(xiàng)目風(fēng)險(xiǎn)管理研究[D];復(fù)旦大學(xué);2008年
5 張東;供應(yīng)商物料管理評(píng)價(jià)方法在客車行業(yè)的應(yīng)用[D];上海交通大學(xué);2007年
,本文編號(hào):2320118
本文鏈接:http://sikaile.net/kejilunwen/xinxigongchenglunwen/2320118.html