四川移動動力環(huán)境監(jiān)控項目質(zhì)量管理與控制
[Abstract]:With the rapid development of mobile communication service in recent years and the continuous expansion of the scale of mobile wireless communication network, the need for power supporting equipment is also increasing, and the difficulty and cost of network operation and maintenance are also rising rapidly, which restricts the further development of mobile communication. In order to further reduce the workload of human maintenance to achieve intelligent work, it is urgent to enter the network operation of a new generation of power environment monitoring system. Since 2001, Sichuan Mobile has gradually introduced power and environmental monitoring system. With the continuous updating of power environmental equipment, different power monitoring equipment is required for different types of base stations and power equipment. The project is faced with such problems as strong professionalism, high technical requirements, complex construction process, fine construction technology requirements and so on, which is a great challenge to project schedule management, quality management and risk management. However, the network scale in Chengdu area is huge and there are many kinds of moving ring equipment, which makes it difficult to guarantee the engineering quality of power environment monitoring system engineering during the construction period. This paper studies and analyzes the theory, method and means of project quality management and construction quality control, combined with the characteristics of Chengdu power environment monitoring system construction project to carry on the system quality control. So as to ensure the quality of power supporting equipment in the construction process of mobile network. In the aspect of project quality management, by using the method of quality management in project management, the organizational structure and task division of Sichuan Mobile Power Environment Phase 8 project are built, the operation quality objectives and test quality objectives of the Power Environment Phase 8 project are formulated, the quality management plan is drawn up, the construction quality management standard is formulated, as well as the quality assurance measures and accident prevention measures. In the construction quality control of the project, the corresponding quality specifications are carried out by identifying the installation quality control points and process control points of the project in the eighth phase of the moving ring project, and the construction quality of the project is comprehensively and systematically supervised, inspected, guided and corrected through three aspects: engineering process inspection, power environment system performance inspection and power environment data configuration inspection. Through the application of project quality management and project construction control in this project, the quality of Sichuan Mobile moving Ring 8 project has been greatly improved. at the same time, the results of this study have a strong reference function for the follow-up Sichuan Mobile base station construction project, moving ring construction project and core network construction project, which provides a detailed and comprehensive scientific basis for the quality management of future projects.
【學(xué)位授予單位】:電子科技大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TN913
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 叢亮;倪蘭;;最需要的就是最好的——訪四川移動黨組書記、總經(jīng)理李華[J];通信世界;2006年32期
2 ;四川移動全省推開“總經(jīng)理服務(wù)日”[J];通信與信息技術(shù);2007年02期
3 李文學(xué);;四川移動“顧問式服務(wù)”見成效[J];通信與信息技術(shù);2008年02期
4 李文學(xué);孫磊;;“安全生產(chǎn)先進(jìn)單位”八連冠 四川移動受到省政府表彰[J];通信與信息技術(shù);2009年02期
5 李文學(xué);;四川移動多項舉措確保汛期通信暢通[J];通信與信息技術(shù);2009年05期
6 田艷燕;;四川移動當(dāng)選四川省青年創(chuàng)業(yè)就業(yè)基金會理事單位[J];通信與信息技術(shù);2010年01期
7 田艷燕;;四川移動啟動“暖冬”大行動[J];通信與信息技術(shù);2010年01期
8 田艷燕;;四川移動獲評“安全生產(chǎn)工作先進(jìn)單位”[J];通信與信息技術(shù);2010年02期
9 李文學(xué);康伊;;四川移動多種舉措應(yīng)對西南大旱[J];通信與信息技術(shù);2010年02期
10 田艷燕;;團(tuán)省委高度贊揚(yáng)四川移動玉樹抗震救災(zāi)工作[J];通信與信息技術(shù);2010年04期
相關(guān)會議論文 前2條
1 吳曉東;;四川移動成本精細(xì)化管理探索[A];四川省通信學(xué)會2009年學(xué)術(shù)年會論文集[C];2009年
2 ;四川移動農(nóng)村信息化工作[A];四川省通信學(xué)會2007年學(xué)術(shù)年會論文集[C];2007年
相關(guān)重要報紙文章 前10條
1 姚曉敏;四川移動:執(zhí)行文化助力做強(qiáng)[N];人民郵電;2004年
2 彭薇;四川移動節(jié)前加強(qiáng)安全工作[N];人民郵電;2005年
3 賴衛(wèi)東;四川移動獲省“十佳慈善企業(yè)”稱號[N];人民郵電;2006年
4 盧向前邋李文學(xué) 孫磊;四川移動農(nóng)信機(jī)抗洪減災(zāi)顯身手[N];人民郵電;2007年
5 盧向前邋李文學(xué) 孫磊;四川移動榮膺“四好”領(lǐng)導(dǎo)班子先進(jìn)集體稱號[N];人民郵電;2007年
6 劉 通;四川移動 網(wǎng)絡(luò)傳情[N];中國質(zhì)量報;2004年
7 記者 唐華;四川移動開辦“聽信息賺話費”業(yè)務(wù)[N];人民郵電;2001年
8 川新;四川移動加強(qiáng)聯(lián)盟商戶管理[N];人民郵電;2004年
9 姚曉敏;四川移動與合作伙伴攜手開發(fā)電力應(yīng)用[N];人民郵電;2004年
10 賴衛(wèi)東;深化改革 讓員工與企業(yè)同成長[N];人民郵電;2004年
相關(guān)碩士學(xué)位論文 前10條
1 李巍;創(chuàng)新文化為導(dǎo)向的四川移動內(nèi)部要素協(xié)同研究[D];電子科技大學(xué);2013年
2 周弦;四川移動公司電子渠道網(wǎng)上充值業(yè)務(wù)推廣研究[D];西南交通大學(xué);2015年
3 鄭水華;四川移動DSMP項目質(zhì)量管理研究[D];電子科技大學(xué);2015年
4 王睿凱;四川移動流量經(jīng)營自增長生態(tài)系統(tǒng)的設(shè)計與實現(xiàn)[D];電子科技大學(xué);2015年
5 唐泉龍;基于收益管理的四川移動基站分類系統(tǒng)設(shè)計與實現(xiàn)[D];電子科技大學(xué);2014年
6 馬力;四川移動動力環(huán)境監(jiān)控項目質(zhì)量管理與控制[D];電子科技大學(xué);2014年
7 陳宇;四川移動互聯(lián)網(wǎng)電視內(nèi)容管理基礎(chǔ)平臺設(shè)計與實現(xiàn)[D];電子科技大學(xué);2014年
8 李瀟;四川移動阿壩城域網(wǎng)擴(kuò)容工程范圍管理與進(jìn)度管理研究[D];電子科技大學(xué);2014年
9 張超;四川移動新產(chǎn)品開發(fā)管理優(yōu)化研究[D];電子科技大學(xué);2014年
10 張勤;四川移動市場競爭態(tài)勢與發(fā)展戰(zhàn)略選擇[D];電子科技大學(xué);2008年
,本文編號:2498399
本文鏈接:http://sikaile.net/kejilunwen/wltx/2498399.html