烏東德水電站左岸地下廠房出線豎井開挖支護(hù)施工技術(shù)

發(fā)布時(shí)間:2019-06-21 18:47
【摘要】:正1工程概況烏東德水電站左岸地下廠房垂直埋深較大,通過(guò)設(shè)置一條出線豎井將主變室與地面出線場(chǎng)進(jìn)行連接。出線豎井由兩個(gè)垂直段和一個(gè)平洞段組成,下垂直段高程823.20~988.00 m,底部與主變室GIS層連接,上部通過(guò)高程988.00 m出線平洞與上垂直段相接,上垂直段高程988.00~1 144.70 m,上部出口位于地面出線場(chǎng)內(nèi),高程988.00 m出線平洞經(jīng)其交通洞與
[Abstract]:General situation of Zheng1 Project the vertical buried depth of the underground powerhouse on the left bank of Wudongde Hydropower Station is large. The main transformer chamber is connected with the ground outlet field by setting up an exit shaft. The vertical section is composed of two vertical sections and a flat tunnel section. The elevation of the vertical section is 823.20 鈮,