基于3DEC的洞室開挖支護(hù)中錯動帶作用機制研究
[Abstract]:Columnar joint basalt is developed in the upper section of flood discharge tunnel of a hydropower station in southwest China and cut by faults, staggered zones and other unfavorable structural planes, which has the characteristics of large section, high ground stress and complex geological conditions. In particular, the influence of dislocation zone represented by slow dip angle on underground caverns can not be ignored. Combined with the physical mechanics and support parameters of the rock mass of the flood discharge tunnel on the left bank, the stress field, displacement field and plastic zone of the tunnel during excavation and support in the staggered zone are simulated by using 3DEC three-dimensional discrete element software. The variation characteristics of stress and strain in the process of excavation and support are analyzed. The simulation results show that the support scheme can effectively control the deformation of surrounding rock.
【作者單位】: 中國地質(zhì)大學(xué)工程學(xué)院;中國電建集團華東勘測設(shè)計研究院有限公司;菏澤瀚麟建筑設(shè)計院有限公司;
【分類號】:TV223
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李平,李華,李東;軟土深基開挖支護(hù)分析[J];建筑;1998年11期
2 王俠;;水利水電施工工程中邊坡開挖支護(hù)技術(shù)分析[J];黑龍江科技信息;2014年08期
3 岳杰;;水利水電施工工程中開挖支護(hù)技術(shù)分析[J];中國科技信息;2014年02期
4 向邦發(fā);葉宏;;江蘇宜興抽水蓄能電站創(chuàng)一年4臺機組投產(chǎn)發(fā)電紀(jì)錄[J];水力發(fā)電;2009年02期
5 林石洪;;小灣泄洪洞無壓段開挖支護(hù)施工技術(shù)分析[J];中國水運(下半月刊);2010年12期
6 王巍;李越;;瀘定水電站大型地下洞室開挖支護(hù)技術(shù)探討[J];四川水利;2008年03期
7 王麗影;牛貝貝;郭玲燕;;溪洛渡大斷面水工隧洞開挖支護(hù)方案與數(shù)值模擬分析[J];陜西水利;2011年06期
8 佘鴻翔;姚珊;陳小波;;黃金坪水電站尾水岔洞開挖支護(hù)動態(tài)設(shè)計及實施[J];云南水力發(fā)電;2013年02期
9 劉墅輝;何澤山;;左岸抗力體不良地質(zhì)帶置換平洞開挖支護(hù)施工[J];人民長江;2009年18期
10 程光磊;孫營;;水利水電施工工程中邊坡開挖支護(hù)技術(shù)分析[J];黑龍江科技信息;2013年27期
相關(guān)碩士學(xué)位論文 前2條
1 陳博;沉陷區(qū)鐵路線下開挖支護(hù)體系穩(wěn)定性研究[D];中國礦業(yè)大學(xué);2015年
2 周榮坤;含采空區(qū)的人工高邊坡穩(wěn)定性與開挖支護(hù)過程分析[D];重慶大學(xué);2005年
,本文編號:2481049
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2481049.html