一種新型管樁組合結構用于港口工程的概念設計
[Abstract]:Aiming at the shortage of gravity caisson engineering application, a kind of hollow pipe pile composite structure is studied and designed. Through theoretical analysis, numerical calculation and engineering case design, the advantages of the key parameters of the new structure are expounded: the extreme state wave force of the structure is only 13. 5 kPa; of the traditional cylinder caisson, and the maximum stress of the base is not more than 300 kPa;. The hoisting tonnage of the structure can be controlled at about 1000 tons; the engineering material is 10% and 25% of the traditional caisson material quality; the main force member is the factory prefabricated part.
【作者單位】: 中交第二航務工程勘察設計院有限公司;
【分類號】:U655.551
【相似文獻】
相關期刊論文 前10條
1 李平,叢玉勝;分叉式組合結構箱梁橋設計[J];公路;1996年11期
2 張鳳鳴,熊健民,周金枝,余天慶;板桁組合結構分析的超級有限元法[J];湖北工學院學報;2000年01期
3 湯國棟,湯羽,馮廣占;纖維增強塑料/復合材料橋梁研究與實踐[J];四川建筑;1997年03期
4 呂建根;趙躍宇;王榮輝;;索拱組合結構的動力建模及其內共振分析[J];中南大學學報(自然科學版);2010年01期
5 白全安;;連續(xù)剛構加勁拱組合結構的設計[J];鐵道建筑技術;2009年04期
6 周印霄;;關于鋼混組合結構中設計及施工若干問題的思考[J];交通世界(建養(yǎng).機械);2013年07期
7 栗勃;;新型進海路主體結構——橋涵式樁板組合結構[J];內蒙古石油化工;2012年08期
8 齊林;;合蚌高鐵(76+160+76)m連續(xù)梁拱組合結構設計研究[J];山西建筑;2014年11期
9 孟憲達;GRADE/SAP 原理選講——第四講 GRADE/SAP在組合結構計算中的應用(上)[J];水運工程;1989年08期
10 陳開利;法國Boulonnais高架橋簡介[J];國外橋梁;1999年01期
相關重要報紙文章 前1條
1 北京市市政專業(yè)設計院有限責任公司 胡達和 謝志紅;鋼及其組合結構在人行天橋與城市立交橋中的應用[N];中國冶金報;2004年
相關碩士學位論文 前6條
1 龍亮;高鐵大跨度單T剛構加勁鋼桁組合梁研究[D];西南交通大學;2015年
2 張雅杰;鋼格—混凝土組合橋面板的橫向體外預應力效應研究[D];華中科技大學;2015年
3 麻偉;新型梁拱組合結構加固混凝土梁的方法研究[D];廣西大學;2016年
4 曹晨瑞;梁拱組合結構吊桿索力研究及抗震分析[D];蘭州交通大學;2014年
5 劉拯宏;一種新型鋼桁組合結構橋的動力特性及其在鐵路中的適應性研究[D];北京交通大學;2015年
6 陳升高;梁拱組合結構箱梁橫向受力及橫隔板優(yōu)化布置研究[D];中南大學;2014年
,本文編號:2402310
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2402310.html