水電工程施工安全隱患評(píng)價(jià)方法及應(yīng)用研究
[Abstract]:With the rapid development of economy, the hydropower industry in our country has been vigorously developed, and the frequent safety accidents have caused huge property losses and casualties. Due to the complex construction of hydropower projects, involving a wide range of unsafe factors, easily lead to accidents. Therefore, in order to make the construction safety of hydropower project, it is an effective method to evaluate the hidden dangers of construction safety. The present situation of hidden dangers in construction process can be reasonably analyzed through safety evaluation, and the corresponding hidden dangers can be checked and rectified to ensure the safety of construction. By studying the present situation of safety evaluation methods at home and abroad, according to the relevant laws and regulations of our country and the characteristics of hydropower project construction, and combining with expert opinion, this paper constructs a set of evaluation index system of safety hidden danger in hydropower project construction. At present, fuzzy comprehensive evaluation and artificial neural network are used to study the hidden dangers of engineering safety. Artificial neural network has strong fault tolerance and association ability, which can well reflect the essential characteristics of external input information, but it does not have the ability to deal with fuzzy information, and can not effectively use expert experience knowledge. There are many uncertainties and strong fuzziness in the construction of hydropower engineering, which leads to the limitation of artificial neural network. Fuzzy comprehensive evaluation method can deal with fuzzy information well and make use of expert knowledge experience, but its operation speed is slow and its precision is low. Therefore, the two evaluation methods can give full play to their advantages. This paper takes the hidden trouble of hydropower construction as the research object, and adopts the method of combining fuzzy comprehensive evaluation with BP neural network. A fuzzy neural network evaluation model based on fuzzy comprehensive evaluation and BP neural network is established based on MATLAB neural network toolbox. The fuzzy neural network model is used to evaluate the hidden dangers of practical projects, the fuzzy comprehensive evaluation method is used to verify the results, and the results are compared with the actual hidden dangers. The practical significance of the method is proved. The fuzzy neural network model proposed in this paper is a new method to evaluate the hidden dangers of construction of hydropower projects, which has a certain reference significance for the investigation of hidden dangers in the construction process of hydropower projects.
【學(xué)位授予單位】:西華大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TV513
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 寧寶權(quán);陜振沛;;農(nóng)業(yè)節(jié)水灌溉項(xiàng)目?jī)?yōu)選——基于改進(jìn)模糊物元分析模型[J];農(nóng)機(jī)化研究;2016年04期
2 郭元偉;;關(guān)于模糊數(shù)學(xué)的原理和應(yīng)用分析[J];西部素質(zhì)教育;2015年18期
3 王醒;吳向男;馬斌;解偉峰;;基于BP神經(jīng)網(wǎng)絡(luò)隧洞施工安全評(píng)價(jià)模型[J];黑龍江交通科技;2015年09期
4 何晶晶;;探究水利水電工程施工安全隱患分析及對(duì)策[J];中國(guó)水運(yùn)(下半月);2015年02期
5 李勇;;水利工程施工安全隱患分析及預(yù)防管理[J];江西建材;2014年20期
6 張秋文;章永志;鐘鳴;;基于云模型的水庫(kù)誘發(fā)地震風(fēng)險(xiǎn)多級(jí)模糊綜合評(píng)價(jià)[J];水利學(xué)報(bào);2014年01期
7 陸春剛;;水利施工安全隱患預(yù)防及措施[J];黑龍江水利科技;2013年04期
8 沈進(jìn)昌;杜樹(shù)新;羅yN;羅季陽(yáng);楊倩;陳志鋒;;基于云模型的模糊綜合評(píng)價(jià)方法及應(yīng)用[J];模糊系統(tǒng)與數(shù)學(xué);2012年06期
9 尹志華;;水利工程施工安全隱患及影響因素的分析[J];商;2012年23期
10 王德明;王莉;張廣明;;基于遺傳BP神經(jīng)網(wǎng)絡(luò)的短期風(fēng)速預(yù)測(cè)模型[J];浙江大學(xué)學(xué)報(bào)(工學(xué)版);2012年05期
相關(guān)博士學(xué)位論文 前1條
1 項(xiàng)冬冬;關(guān)于動(dòng)態(tài)隱患識(shí)別系統(tǒng)的研究[D];華東師范大學(xué);2013年
相關(guān)碩士學(xué)位論文 前7條
1 余海莉;基于人為因素的工程施工安全風(fēng)險(xiǎn)分析與評(píng)價(jià)[D];華中科技大學(xué);2012年
2 夏卜敬;基于模糊綜合評(píng)價(jià)和神經(jīng)網(wǎng)絡(luò)對(duì)邊坡穩(wěn)定性的分析研究[D];武漢科技大學(xué);2008年
3 邱利祥;模糊理論在高層建筑施工安全評(píng)價(jià)中的應(yīng)用研究[D];江西理工大學(xué);2008年
4 施振海;基于模糊綜合評(píng)價(jià)和人工神經(jīng)網(wǎng)絡(luò)的投標(biāo)決策模型研究[D];浙江大學(xué);2007年
5 吳麗萍;模糊綜合評(píng)價(jià)方法及其應(yīng)用研究[D];太原理工大學(xué);2006年
6 張中昱;基于BP神經(jīng)網(wǎng)絡(luò)和模糊綜合評(píng)價(jià)的環(huán)境分析評(píng)價(jià)系統(tǒng)[D];天津大學(xué);2006年
7 楊蔚華;基于模糊法和神經(jīng)網(wǎng)絡(luò)的登機(jī)橋結(jié)構(gòu)方案優(yōu)選研究與應(yīng)用[D];武漢理工大學(xué);2005年
,本文編號(hào):2389051
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2389051.html