水利工程建設(shè)進(jìn)度管理與風(fēng)險(xiǎn)分析

發(fā)布時(shí)間:2018-12-17 11:10
【摘要】:水利工程施工進(jìn)度控制是水利工程建設(shè)管理的一項(xiàng)非常重要的工作。它包括在水利工程施工組織階段、施工進(jìn)度計(jì)劃編制過(guò)程中的進(jìn)度控制,和工程實(shí)施過(guò)程中施工進(jìn)度控制,本文對(duì)施工組織設(shè)計(jì)階段的進(jìn)度控制進(jìn)行研究,分析影響施工進(jìn)度的風(fēng)險(xiǎn)因素,提出降低進(jìn)度計(jì)劃實(shí)施出現(xiàn)風(fēng)險(xiǎn)的措施。施工進(jìn)度計(jì)劃的編制時(shí)風(fēng)險(xiǎn)控制的研究,主要分析研究施工條件,包括水文、氣象、地質(zhì)條件,施工環(huán)境,場(chǎng)地位置等風(fēng)險(xiǎn)因素產(chǎn)生的影響,并且針對(duì)這些風(fēng)險(xiǎn),在人、材、機(jī)資源配置,施工方法,施工總布置方面做詳盡、周密的安排。工程在實(shí)施過(guò)程中風(fēng)險(xiǎn)控制研究,施工條件的多變性,施工企業(yè)水平的限制,監(jiān)理工作的協(xié)調(diào)性,業(yè)主工作的充分性都對(duì)水利工程施工進(jìn)度控制產(chǎn)生一定的影響。因而在工期規(guī)定的條件下,施工進(jìn)度具有較大的風(fēng)險(xiǎn)性。科學(xué)的分析施工條件,指定相應(yīng)的風(fēng)險(xiǎn)對(duì)策,對(duì)于控制施工進(jìn)度具有十分重要的意義。本文主要研究?jī)?nèi)容和成果如下:(1)分析水利工程施工進(jìn)度與水利工程施工組織設(shè)計(jì)的關(guān)系,從施工組織設(shè)計(jì)的視角,分析影響工程施工進(jìn)度控制的因素。(2)根據(jù)進(jìn)度控制的特點(diǎn)定義其風(fēng)險(xiǎn);分析了施工進(jìn)度控制中各個(gè)因素的關(guān)系。(3)以萬(wàn)寶船閘工程為例進(jìn)行了工程建設(shè)進(jìn)度風(fēng)險(xiǎn)分析,說(shuō)明了進(jìn)度控制引入風(fēng)險(xiǎn)分析的作用和意義,保證了進(jìn)度控制的有效性。
[Abstract]:Water conservancy project construction schedule control is a very important work of water conservancy project construction management. It includes the progress control in the construction organization stage of water conservancy project, the progress control in the process of drawing up the construction schedule plan, and the construction progress control in the process of the project implementation. This paper studies the progress control of the construction organization design stage. The risk factors affecting construction schedule are analyzed, and the measures to reduce the risk in the implementation of schedule plan are put forward. The study of risk control in the preparation of construction schedule, mainly analyzes and studies the impact of construction conditions, including hydrology, meteorology, geological conditions, construction environment, site location and other risk factors, and in view of these risks, in people and materials, Machine resources allocation, construction methods, construction layout to do detailed, thorough arrangements. The study of risk control in the process of implementation, the variability of construction conditions, the restriction of construction enterprise level, the coordination of supervision work and the adequacy of owner's work all have certain influence on the construction schedule control of water conservancy project. Therefore, under the condition of time limit, construction schedule has greater risk. Scientific analysis of construction conditions and designation of corresponding risk countermeasures are of great significance for controlling construction progress. The main contents and achievements of this paper are as follows: (1) analyzing the relationship between the construction schedule of water conservancy project and the construction organization design of water conservancy project, from the angle of view of construction organization design, The factors influencing the construction schedule control are analyzed. (2) the risk is defined according to the characteristics of the schedule control; The relationship between various factors in construction schedule control is analyzed. (3) taking Wanbao Shiplock Project as an example, the risk analysis of construction schedule is carried out, and the function and significance of introducing risk analysis into schedule control are explained, and the effectiveness of schedule control is ensured.
【學(xué)位授予單位】:黑龍江大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TV511

【參考文獻(xiàn)】

相關(guān)碩士學(xué)位論文 前1條

1 盧俊文;進(jìn)度計(jì)劃編制和進(jìn)度控制方法在水電工程項(xiàng)目的應(yīng)用研究[D];國(guó)防科學(xué)技術(shù)大學(xué);2011年

,

本文編號(hào):2384114

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2384114.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶35d3a***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com