高拱壩施工仿真多目標(biāo)優(yōu)化與多屬性決策研究

發(fā)布時間:2018-12-16 21:27
【摘要】:混凝土高拱壩所在區(qū)域往往河谷深切、地形陡峻、地質(zhì)條件復(fù)雜,空間資源有限,不利于施工場地的總體布置及交通運(yùn)輸。根據(jù)混凝土高拱壩的地形地質(zhì)特點(diǎn)、施工規(guī)模及施工強(qiáng)度等的不同,可能有多種施工方案可供選擇,而不同的施工方案在保證施工進(jìn)度、施工質(zhì)量和施工組織難度等方面差異較大。對于同一種施工方案,由于壩體通常被劃分成許多壩塊進(jìn)行澆筑,壩塊跳倉排序規(guī)則會影響和制約工程整體的施工進(jìn)度以及施工的均衡性。因此如何綜合考慮影響高拱壩施工的各項(xiàng)因素,對大壩倉面排序規(guī)則進(jìn)行優(yōu)化,并對多個高拱壩施工方案進(jìn)行優(yōu)化和比選,獲得多目標(biāo)綜合最優(yōu)的施工方案和倉面排序規(guī)則是高拱壩設(shè)計及施工階段面臨的重要問題。目前的倉面排序方法大都是根據(jù)已有的經(jīng)驗(yàn)或基于對壩塊屬性值的數(shù)學(xué)分析來制定跳倉排序規(guī)則,無法有效地解決倉面排序的多目標(biāo)優(yōu)化問題。此外,現(xiàn)有的施工方案比選研究中,所采用的評價方法無法全面反映各方案與理想方案的貼近關(guān)系,各方案的評價參數(shù)只有一個且不一定是各方案所能獲得的最優(yōu)施工參數(shù),影響評價結(jié)果的準(zhǔn)確性。本文針對高拱壩施工仿真多目標(biāo)優(yōu)化與多屬性決策進(jìn)行了相關(guān)研究。通過詳細(xì)分析高拱壩澆筑塊選擇原理,綜合考慮影響混凝土澆筑的各項(xiàng)因素,建立了高拱壩施工倉面排序多目標(biāo)優(yōu)化模型,該模型以高拱壩跳倉排序規(guī)則為變量,以優(yōu)化施工工期、月澆筑強(qiáng)度為目標(biāo),應(yīng)用粒子群算法對該多目標(biāo)優(yōu)化問題進(jìn)行求解,獲得多目標(biāo)綜合優(yōu)化的倉面排序方案。對于多方案多屬性決策問題,鑒于逼近理想解法及灰色關(guān)聯(lián)分析方法在解決多屬性決策問題中各自的優(yōu)缺點(diǎn),對二者進(jìn)行有效集成,構(gòu)建了基于改進(jìn)逼近理想解法的高拱壩多方案多屬性決策方法。采用上述倉面排序多目標(biāo)優(yōu)化方法為每個方案獲得多個跳倉排序規(guī)則,并對各排序規(guī)則進(jìn)行仿真計算獲得各自的工期、施工強(qiáng)度、機(jī)械利用率等施工參數(shù),而后采用改進(jìn)逼近理想解法對多個方案的多個跳倉排序規(guī)則進(jìn)行多屬性決策,獲得決策解,提高了決策結(jié)果的全面性和準(zhǔn)確性。通過工程實(shí)例計算,結(jié)果表明:采用粒子群算法實(shí)現(xiàn)了對倉面排序方案的優(yōu)化調(diào)整,計算得到的Pareto解集能夠?yàn)闆Q策者提供多個方案的多個跳倉排序規(guī)則以便更好地決策,利用改進(jìn)逼近理想解法優(yōu)選的方案能夠獲得更短的工期和更均衡的澆筑過程,對于指導(dǎo)現(xiàn)場施工具有重要意義。
[Abstract]:The area where the high arch dam is located often has deep valley steep topography complicated geological conditions and limited space resources which is not conducive to the overall layout of the construction site and transportation. According to the topographic and geological characteristics, construction scale and construction intensity of high arch dam, there may be a variety of construction schemes to be selected, and different construction schemes can ensure the construction progress. The construction quality and the construction organization difficulty and so on aspect difference is big. For the same construction scheme, because the dam body is usually divided into many dam blocks for pouring, the sorting rules of dam block jump silo will affect and restrict the construction schedule and the balance of construction as a whole. Therefore, how to comprehensively consider the factors that affect the construction of high arch dam, optimize the sorting rules of dam silo surface, and optimize and compare many construction schemes of high arch dam. It is an important problem in the design and construction stage of high arch dam to obtain the comprehensive optimal construction scheme of multi-objective and the sorting rules of silo surface. Most of the current sorting methods are based on the existing experience or based on the mathematical analysis of the dam block property value to make the jump sorting rules, which can not effectively solve the multi-objective optimization problem of silo surface scheduling. In addition, the evaluation methods used in the existing research on the comparison and selection of construction schemes can not fully reflect the close relationship between each scheme and the ideal scheme. The evaluation parameters of each scheme are only one and not necessarily the optimal construction parameters that can be obtained by each scheme. Accuracy of impact evaluation results. This paper studies the multi-objective optimization and multi-attribute decision-making of high arch dam construction simulation. Based on the detailed analysis of the selection principle of high arch dam construction blocks and the comprehensive consideration of various factors affecting concrete pouring, a multi-objective optimization model of warehouse surface sequencing for high arch dam construction is established. The model takes the order rule of high arch dam jump silo as a variable. In order to optimize the construction period and the monthly pouring strength, the particle swarm optimization algorithm is applied to solve the multi-objective optimization problem. In view of the advantages and disadvantages of the approximate ideal method and the grey relational analysis method in solving the multi-attribute decision making problem, the two methods are effectively integrated. A multi-scheme and multi-attribute decision-making method for high arch dam based on the improved approximation ideal method is proposed. The multi-objective optimization method is used to obtain multiple hopping sorting rules for each scheme, and the construction parameters, such as duration, construction intensity and mechanical utilization ratio, are obtained by simulation calculation of each sorting rule. Then, the improved approximation ideal method is used to make multi-attribute decision making for multiple hopping sorting rules of multiple schemes, and the decision solution is obtained, which improves the comprehensiveness and accuracy of the decision results. The results of engineering examples show that the particle swarm optimization algorithm is used to optimize and adjust the sorting scheme of warehouse surface, and the calculated Pareto solution set can provide multiple hopping sorting rules for decision makers for better decision making. The improved approximate ideal solution can obtain shorter construction period and more balanced pouring process, which is of great significance for guiding the field construction.
【學(xué)位授予單位】:天津大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TV642.4

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 陳在鐵;任青文;;高拱壩安全分析中的不確定性因素研究[J];南京理工大學(xué)學(xué)報(自然科學(xué)版);2006年06期

2 陳在鐵;;高拱壩安全評價方法比較[J];水利水電科技進(jìn)展;2007年03期

3 唐純喜;陳進(jìn);黃薇;程衛(wèi)帥;;高拱壩結(jié)構(gòu)安全的風(fēng)險源集及主要失效路徑研究[J];水力發(fā)電;2010年11期

4 楊忠興;;高拱壩關(guān)鍵施工技術(shù)[J];四川水力發(fā)電;2012年02期

5 黃濤;高拱壩學(xué)術(shù)討論會在成都召開[J];水力發(fā)電;1981年02期

6 吳本陵;邢振賢;;大摻量粉煤灰在薄壁高拱壩中的應(yīng)用研究[J];粉煤灰綜合利用;1991年04期

7 魏文凱;高拱壩技術(shù)的新進(jìn)展[J];云南水力發(fā)電;2000年04期

8 安剛,楊令強(qiáng);高拱壩泄洪振動水彈性模擬的研究[J];水利水電技術(shù);2001年09期

9 鄒麗春,侯順載,楊宜文;高拱壩地震應(yīng)力控制標(biāo)準(zhǔn)和抗震工程措施研究[J];水力發(fā)電;2001年08期

10 柴軍瑞,劉浩吾;高拱壩研究新進(jìn)展[J];水利水電科技進(jìn)展;2001年06期

相關(guān)會議論文 前10條

1 蔣昱州;徐衛(wèi)亞;王如賓;石崇;楊圣奇;;高拱壩動力時程分析及安全評價[A];現(xiàn)代水利水電工程抗震防災(zāi)研究與進(jìn)展[C];2009年

2 李毅佳;馬斌;;高拱壩地震響應(yīng)的行波效應(yīng)分析[A];水力學(xué)與水利信息學(xué)進(jìn)展 2009[C];2009年

3 龍渝川;許紹乾;高雪超;;高拱壩梁向配筋抗震措施效果研究[A];第19屆全國結(jié)構(gòu)工程學(xué)術(shù)會議論文集(第Ⅱ冊)[C];2010年

4 陳在鐵;;基于風(fēng)險的混凝土高拱壩失效模型研究[A];蘇州市自然科學(xué)優(yōu)秀學(xué)術(shù)論文匯編(2008-2009)[C];2010年

5 余嶺;吳杰芳;;高拱壩泄洪誘發(fā)壩體振動試驗(yàn)研究[A];第五屆全國結(jié)構(gòu)工程學(xué)術(shù)會議論文集(第三卷)[C];1996年

6 鄭璀瑩;張國新;;自重施加和蓄水方式對高拱壩應(yīng)力計算的影響[A];北京力學(xué)會第11屆學(xué)術(shù)年會論文摘要集[C];2005年

7 陳在鐵;;高拱壩抗震研究急待解決的問題探討[A];中國力學(xué)學(xué)會學(xué)術(shù)大會'2005論文摘要集(下)[C];2005年

8 陳厚群;馬懷發(fā);吳勝興;丁衛(wèi)華;;高拱壩混凝土地震抗力機(jī)理探索[A];2005全國結(jié)構(gòu)動力學(xué)學(xué)術(shù)研討會學(xué)術(shù)論文集[C];2005年

9 李同春;王仁坤;游啟升;周秋景;;高拱壩安全度評價方法研究[A];2007重大水利水電科技前沿院士論壇暨首屆中國水利博士論壇論文集[C];2007年

10 王仁坤;;溪洛渡等特高拱壩的關(guān)鍵技術(shù)研究與實(shí)踐(一)[A];現(xiàn)代水利水電工程抗震防災(zāi)研究與進(jìn)展(2011年)[C];2011年

相關(guān)重要報紙文章 前10條

1 毛紹清;練博士“煉”出真功夫[N];西南電力報;2007年

2 本報記者 胡學(xué)萃;世界第一高拱壩的崛起[N];中國能源報;2013年

3 丁雅文;世界第一高拱壩左岸混凝土澆筑沖刺壩頂[N];中國建材報;2013年

4 本報記者 胡敏;世界第一高拱壩是這樣建設(shè)的[N];四川日報;2009年

5 記者 范建;大壩抗震安全設(shè)計獲新突破[N];科技日報;2008年

6 賈克香邋彭濤;武清璽:一位視講臺如生命的學(xué)者[N];中國教育報;2007年

7 通訊員 嚴(yán)鎮(zhèn)威;水電十四局4項(xiàng)科技成果通過鑒定[N];云南日報;2010年

8 彭程;“十一五”我國壩工和水電機(jī)組技術(shù)發(fā)展展望[N];中國水利報;2007年

9 中國水利學(xué)會水工結(jié)構(gòu)專業(yè)委員會;結(jié)構(gòu)工程技術(shù)成果豐碩 (下)[N];中國水利報;2003年

10 本報記者 李友明 楊艷;305米:世界第一高拱壩開始澆筑[N];涼山日報(漢);2009年

相關(guān)博士學(xué)位論文 前10條

1 潘元煒;蓄水期和運(yùn)行期庫盆變形機(jī)制及對高拱壩安全的影響[D];清華大學(xué);2015年

2 常強(qiáng);高拱壩關(guān)鍵區(qū)域局部破損分析[D];清華大學(xué);2015年

3 任炳昱;高拱壩施工實(shí)時控制理論與關(guān)鍵技術(shù)研究[D];天津大學(xué);2010年

4 姚霄雯;基于性能的高拱壩地震易損性分析與抗震安全評估[D];浙江大學(xué);2013年

5 蘇超;基于有限單元法的高拱壩優(yōu)化設(shè)計方法體系的研究與應(yīng)用[D];河海大學(xué);2005年

6 鐘紅;高拱壩地震損傷開裂的大型數(shù)值模擬[D];大連理工大學(xué);2008年

7 王仁坤;特高拱壩建基面嵌深優(yōu)化設(shè)計分析與評價[D];清華大學(xué);2007年

8 王春濤;高拱壩及其附屬結(jié)構(gòu)體系靜動力分析與模擬[D];天津大學(xué);2004年

9 陳英儒;變形加固理論及其在高拱壩工程中的應(yīng)用[D];清華大學(xué);2008年

10 劉毅;高拱壩真實(shí)工作性態(tài)影響因素研究[D];中國水利水電科學(xué)研究院;2007年

相關(guān)碩士學(xué)位論文 前10條

1 彭琪;基于模型修正技術(shù)的高拱壩結(jié)構(gòu)損傷識別研究[D];南昌大學(xué);2015年

2 趙青;高拱壩異型差動坎與寬尾墩結(jié)合消能特性研究[D];大連理工大學(xué);2015年

3 朱昆;高拱壩動力模型破壞試驗(yàn)的數(shù)值補(bǔ)充分析[D];大連理工大學(xué);2015年

4 孫寶成;基于ABAQUS的混凝土高拱壩三維有限元靜動力分析[D];鄭州大學(xué);2016年

5 馮誠誠;基于纜機(jī)時空沖突模擬的高拱壩混凝土澆筑機(jī)械優(yōu)化調(diào)度[D];三峽大學(xué);2016年

6 程普;高拱壩施工仿真多目標(biāo)優(yōu)化與多屬性決策研究[D];天津大學(xué);2014年

7 田文娟;震后高拱壩結(jié)構(gòu)損傷識別研究[D];南昌大學(xué);2016年

8 王晨旭;高拱壩澆筑仿真中大風(fēng)影響與機(jī)械干擾問題研究[D];天津大學(xué);2014年

9 宋健;考慮溫度荷載的高拱壩靜動力分析與影響因素[D];大連理工大學(xué);2016年

10 魏國利;結(jié)構(gòu)縫對高拱壩動力破壞性態(tài)的影響研究[D];大連理工大學(xué);2016年

,

本文編號:2383069

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2383069.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶36697***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com