錨桿支護條件下應(yīng)變型巖爆過程研究
[Abstract]:Rock burst is a dynamic phenomenon of releasing elastic strain energy under the action of some factors, which occurs frequently in the construction process of underground engineering. It not only threatens the safety of personnel, but also the safety of machinery. It also restricts economic development and social construction, and has become one of the most prominent geological disasters in deep underground engineering. At present, bolt support is widely used to prevent rockburst, but the effect of prevention and control is not ideal. Many tunnels which have been supported by bolting system still have strong rockburst. Therefore, it is urgent to carry out relevant research to reveal the occurrence process and mechanism of strain type rockburst under bolt support. In this paper, the process of strain type rockburst under bolt support is revealed from physical rock burst test and numerical simulation test. The former uses a new rigid true triaxial rockburst tester and takes the white granite sample as the test object. The indoor physical rockburst test is carried out by changing the number and position of the anchor rod on the rock sample. The rock burst occurred when the rock mass is supported by bolt under high ground stress level is reproduced. With the help of high speed camera system, digital image motion analysis software and other test equipment, the whole process of rock burst ejection damage is recorded in multiple dimensions. In the latter case, the rock burst process of granite specimen under bolt support is simulated by using UDEC two-dimensional discrete element software, and the background is a case of rock burst encountered in the construction process of Jinping II Hydropower Station. The rock burst process of tunnel under different density of bolt support is simulated. The results show that: 1, the rock burst process under bolting condition is similar to that under the condition of no support, including four stages: pellet ejection, split plate forming, shearing block, plate folding ejection, but different in meso. The failure of rock burst begins in the area between anchor rod and anchor rod, and the phenomenon of particle ejection occurs, in which the micro-crack develops into the deep rock mass and gradually runs through, which causes block ejection, thus breaking the integrity of the bolt support system and resulting in rock mass loosening. The normal stress of the bolt decreases sharply, the reinforcement of the bolt weakens, and the rock mass in the anchoring area is destroyed. 2. The rock mass between the anchor rod and the anchor rod becomes the weak zone of the rock burst under the condition of anchor support, and once the rock burst occurs, The damage is more serious than the condition without anchor, but the anchor does not play a full role. 3. Under the high ground stress level, the rock burst can not be stopped by infilling the anchor. However, the characteristics of rock burst under different density bolt support conditions are different: under the condition of high density bolt support, the rock burst results in the failure of rock mass and bolt association because the weak zone is not obvious; Under the low density bolt support, the rock burst failure begins with the rock mass between the anchor rod and causes the ejection of the rock mass in this area because of the existence of the weak zone, and the range of the rock burst failure decreases with the increase of the bolt density.
【學(xué)位授予單位】:廣西大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TV554
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 徐世勇;;制約煤礦錨桿支護發(fā)展的主要因素及發(fā)展建議[J];中國新技術(shù)新產(chǎn)品;2008年15期
2 張召千;錨桿支護動態(tài)設(shè)計方法——信息法[J];太原理工大學(xué)學(xué)報;2003年01期
3 張茂岐;淺談高強度錨桿支護[J];山西建筑;2005年10期
4 武均;;錨桿支護的現(xiàn)狀與發(fā)展趨勢[J];山西建筑;2009年12期
5 王志杰;陳梅芳;;錨桿支護原理的另類解釋[J];隧道建設(shè);2011年S1期
6 蔣劍蓬;;隧道錨桿支護機理及關(guān)鍵問題探討[J];中國新技術(shù)新產(chǎn)品;2012年09期
7 黃薇;;錨桿支護在重慶市某公園邊坡治理工程中的應(yīng)用[J];山西建筑;2013年12期
8 ;永久性錨桿支護的試驗設(shè)計和施工[J];鐵路標(biāo)準(zhǔn)設(shè)計通訊;1966年04期
9 李錫潤,林韻梅,鄭雨天;錨桿支護機理的探討[J];東北工學(xué)院學(xué)報;1981年04期
10 朱浮聲,李錫潤,王泳嘉;錨桿支護的數(shù)值模擬方法[J];東北工學(xué)院學(xué)報;1989年01期
相關(guān)會議論文 前10條
1 蔣樹屏;;隧道圍巖中系統(tǒng)錨桿支護效果的研究[A];巖石力學(xué)在工程中的應(yīng)用——第二次全國巖石力學(xué)與工程學(xué)術(shù)會議論文集[C];1989年
2 胡林;;綜掘錨桿支護裝備的現(xiàn)狀與發(fā)展趨勢[A];煤礦安全、高效、潔凈開采——機電一體化新技術(shù)學(xué)術(shù)會議論文集[C];2009年
3 桂祥友;馬云東;郁鐘銘;;錨桿支護可靠性動態(tài)設(shè)計計算機系統(tǒng)與應(yīng)用研究[A];貴州省巖石力學(xué)與工程學(xué)會2010年學(xué)術(shù)年會論文集[C];2010年
4 司林坡;;對錨桿支護中一些問題的探討[A];采礦工程學(xué)新論——北京開采所研究生論文集[C];2005年
5 王聯(lián)合;侯俊鋒;;黃陵一號煤礦錨桿支護施工監(jiān)測方案設(shè)計[A];西部礦山建設(shè)工程理論與實踐[C];2009年
6 張玉君;段升金;張振海;;錨桿支護失效原因分析及防范措施[A];第六屆全國煤炭工業(yè)生產(chǎn)一線青年技術(shù)創(chuàng)新文集[C];2011年
7 王萬冬;;大力推廣錨桿支護 促進煤礦安全生產(chǎn)[A];2003年中國科學(xué)技術(shù)協(xié)會學(xué)術(shù)年會、“安全健康:全面建設(shè)小康社會”專題交流會、全國第三次安全科學(xué)技術(shù)學(xué)術(shù)交流大會論文集[C];2003年
8 顧金才;沈俊;;錨桿支護洞室受力反應(yīng)與破壞形態(tài)比例模型試驗研究[A];水電與礦業(yè)工程中的巖石力學(xué)問題——中國北方巖石力學(xué)與工程應(yīng)用學(xué)術(shù)會議文集[C];1991年
9 林健;康紅普;;煤礦錨桿支護構(gòu)件精細(xì)化研究方向和趨勢[A];中國軟巖工程與深部災(zāi)害控制研究進展——第四屆深部巖體力學(xué)與工程災(zāi)害控制學(xué)術(shù)研討會暨中國礦業(yè)大學(xué)(北京)百年校慶學(xué)術(shù)會議論文集[C];2009年
10 劉永祿;高明濤;;千米深井煤巷桁架與錨桿支護效果的數(shù)值模擬研究[A];2010全國采礦科學(xué)技術(shù)高峰論壇論文集[C];2010年
相關(guān)重要報紙文章 前8條
1 張永亮;淮北礦業(yè)集團海孜礦錨桿支護節(jié)支二千余萬[N];中國礦業(yè)報;2003年
2 崔大漢邋薛建宏;煤科院專家解讀“錨桿支護”[N];經(jīng)理日報;2007年
3 張瑛;秦斌青:生命的升華[N];山西科技報;2000年
4 李宛玲 郭雪飛;王莊礦一項技術(shù)節(jié)支2.45億元[N];山西經(jīng)濟日報;2004年
5 梁勇;祁東礦錨桿支護達(dá)100% 徹底取消架棚支護[N];經(jīng)理日報;2007年
6 梁勇;祁東礦:推廣錨桿支護 取替架棚支護[N];經(jīng)理日報;2007年
7 劉循;采礦工程學(xué)科領(lǐng)域獲新突破[N];科技日報;2005年
8 劉俊恒 本報記者 張富江;太行脊梁[N];中國煤炭報;2006年
相關(guān)博士學(xué)位論文 前3條
1 黃靖龍;新型機械式可回收端錨桿支護機理及應(yīng)用研究[D];中國礦業(yè)大學(xué);2009年
2 周紀(jì)軍;爆炸動載對近區(qū)錨桿支護結(jié)構(gòu)影響的試驗研究[D];中國礦業(yè)大學(xué)(北京);2011年
3 馬春馳;深埋隧道圍巖脆性破裂的微震監(jiān)測及巖爆解譯與預(yù)警研究[D];成都理工大學(xué);2017年
相關(guān)碩士學(xué)位論文 前10條
1 陳康;錨桿支護條件下應(yīng)變型巖爆過程研究[D];廣西大學(xué);2017年
2 李國平;下溝礦二次動壓巷道高預(yù)應(yīng)力支護技術(shù)研究[D];西安科技大學(xué);2015年
3 肖旺;考慮峰后特性的隧道圍巖錨桿支護力學(xué)機制[D];湖南大學(xué);2016年
4 王偉;巷道圍巖穩(wěn)定性分析及錨桿支護效果評價研究[D];西安科技大學(xué);2016年
5 潘春艷;高峰礦玻璃鋼錨桿支護系統(tǒng)可靠性評價研究[D];武漢科技大學(xué);2016年
6 周俊;錨桿支護“平衡力系”原理分析及應(yīng)用研究[D];安徽理工大學(xué);2017年
7 仲奇;隧道支護結(jié)構(gòu)特性與協(xié)同作用研究[D];山東大學(xué);2017年
8 王波;錨桿支護邊坡工程的穩(wěn)定性分析[D];華中科技大學(xué);2016年
9 劉東才;鐵法局錨桿支護力學(xué)研究與實踐[D];遼寧工程技術(shù)大學(xué);2001年
10 陸雪峰;錨桿支護作業(yè)平臺的設(shè)計與仿真研究[D];山東科技大學(xué);2011年
,本文編號:2369199
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2369199.html