裂隙較發(fā)育巖體的地應(yīng)力測(cè)量與研究
[Abstract]:In order to solve the problem of high difficulty and low success rate in conventional in-situ stress measurement, the applicability of various in-situ stress measurement methods in fractured relatively developed rock mass is analyzed and studied. The results show that the method of borehole bottom strain release can be used to measure the in-situ stress of the jointed rock mass, and can be applied to the columnar jointed rock mass of the dam foundation of a hydropower station. The plane stress state of the columnar jointed rock mass of the dam foundation of a hydropower station is successfully obtained by using this method, and the three dimensional stress state is obtained by testing three different directions of boreholes. The results of the stress transformation from the coordinate system to the coordinate system of each borehole are close to the results of the single hole bottom stress test, and the results of the different methods are verified by each other. Therefore, the method of borehole bottom strain relief can be used to measure and study the in-situ stress of fractured rock mass, such as columnar joints, which can be used as a reference for similar projects.
【作者單位】: 長(zhǎng)江科學(xué)院水利部巖土力學(xué)與工程重點(diǎn)實(shí)驗(yàn)室;中國(guó)電建集團(tuán)華東勘測(cè)設(shè)計(jì)研究院有限公司;
【基金】:國(guó)家自然科學(xué)基金項(xiàng)目(51579016) 國(guó)家重點(diǎn)研發(fā)計(jì)劃項(xiàng)目(2016YFC0401801,2016YFC0401803) 中央級(jí)公益性科研院所基本科研業(yè)務(wù)費(fèi)項(xiàng)目(CKSF2016041/YT,CKSF2017037/YT)
【分類號(hào)】:TV223
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 景鋒;梁合成;邊智華;劉元坤;;地應(yīng)力測(cè)量方法研究綜述[J];華北水利水電學(xué)院學(xué)報(bào);2008年02期
2 ;CW-250型率定機(jī)鑒定會(huì)[J];水文地質(zhì)工程地質(zhì);1979年01期
3 鐘作武,陳云長(zhǎng),劉允芳,周密;深部巖體三維地應(yīng)力測(cè)量技術(shù)[J];礦山壓力與頂板管理;2005年03期
4 陳群策,李方全;水力階撐法用于原地應(yīng)力測(cè)量的工作原理及其工程實(shí)踐[J];巖石力學(xué)與工程學(xué)報(bào);1998年03期
5 郭U_良;;重大工程建設(shè)中的地應(yīng)力測(cè)量及其在設(shè)計(jì)中的應(yīng)用[J];震災(zāi)防御技術(shù);2006年02期
6 劉允芳,尹健民,劉元坤;新疆下坂地水利樞紐地應(yīng)力測(cè)量與研究[J];巖石力學(xué)與工程學(xué)報(bào);2004年02期
7 賈龍;王成虎;;三維地應(yīng)力測(cè)量過程中應(yīng)力釋放規(guī)律分析[J];人民長(zhǎng)江;2012年05期
8 丁立豐,安其美,王海忠,趙仕廣;金沙江溪洛渡水電站地應(yīng)力測(cè)量[J];水文地質(zhì)工程地質(zhì);2004年06期
9 趙仕廣;安其美;;天生橋二級(jí)水電站廠房高邊坡地應(yīng)力測(cè)量與分析[J];地殼構(gòu)造與地殼應(yīng)力文集;1994年00期
10 吳滿路,廖椿庭;黑龍江荒溝蓄能電站樞紐區(qū)地應(yīng)力測(cè)量與研究[J];地質(zhì)力學(xué)學(xué)報(bào);2001年01期
相關(guān)會(huì)議論文 前6條
1 羅超文;鐘作武;劉允芳;龔壁新;;三峽工程的地應(yīng)力測(cè)量和研究[A];面向國(guó)民經(jīng)濟(jì)可持續(xù)發(fā)展戰(zhàn)略的巖石力學(xué)與巖石工程——中國(guó)巖石力學(xué)與工程學(xué)會(huì)第五次學(xué)術(shù)大會(huì)論文集[C];1998年
2 孫民偉;王寶成;;寶泉抽水蓄能電站地應(yīng)力測(cè)量與分析探討[A];巖土力學(xué)研究與工程實(shí)踐[C];1998年
3 彭華;;水壓致裂法三維地應(yīng)力測(cè)量[A];地應(yīng)立場(chǎng)測(cè)試及其應(yīng)用論文集[C];1991年
4 劉允芳;;水壓致裂法地應(yīng)力測(cè)量的測(cè)試原理及其與套孔解除法測(cè)量成果的比較[A];全國(guó)巖石邊坡、地下工程、地基基礎(chǔ)監(jiān)測(cè)及處理技術(shù)學(xué)術(shù)會(huì)議論文選集[C];1993年
5 辜建川;陳政加;和再良;孫成明;尹森菁;;小灣水電站地應(yīng)力測(cè)量及分析[A];地應(yīng)立場(chǎng)測(cè)試及其應(yīng)用論文集[C];1991年
6 李方全;張伯崇;;三峽工程壩址附近原地應(yīng)力測(cè)量及水庫蓄水誘發(fā)地震可能性探討[A];第五屆全國(guó)構(gòu)造物理、第三屆全國(guó)高溫高壓學(xué)術(shù)討論會(huì)論文摘要[C];1992年
,本文編號(hào):2368207
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2368207.html