TBM滾刀破巖機(jī)理與影響因素?cái)?shù)值模擬研究
[Abstract]:In order to study the rock breaking mechanism of (TBM) hob and the influencing factors of rock breaking effect, the rock breaking model of hob is established by particle flow program (PFC), and the parameters of PFC program are calibrated by uniaxial compression and Brazilian splitting test results. The rock breaking process of hob is simulated and the influence of rock strength and confining pressure on rock breaking effect is studied and analyzed. The results show that the combined rock breaking model of rock breaking with hob rock is compacted in the early stage, squeezed in the middle stage, and broken by tension in the later stage. The phenomenon of repeated loading and unloading alternately and leaping to break the rock appears in the whole process of rock breaking. If the strength of rock is too high it is difficult to produce radial crack. The lateral crack propagation is not obvious and the rock breaking effect is not good. The TBM hob is only suitable for rock in the range of medium strength. The confining pressure affects the formation and propagation of cracks, and when higher, the radial crack development will be restrained, and the overall effect of rock breaking will be reduced. The research results can provide some reference for TBM selection and hob design.
【作者單位】: 中國水利水電科學(xué)研究院流域水循環(huán)模擬與調(diào)控國家重點(diǎn)實(shí)驗(yàn)室;北京城建設(shè)計(jì)發(fā)展集團(tuán)股份有限公司;
【基金】:國家自然科學(xué)基金項(xiàng)目(51609266) 國家重點(diǎn)研發(fā)計(jì)劃課題(2016YFC0401804) 國家重點(diǎn)基礎(chǔ)研究發(fā)展計(jì)劃項(xiàng)目(2013CB035401) 中國水利水電科學(xué)研究院基本科研業(yè)務(wù)費(fèi)專項(xiàng)項(xiàng)目(GE0145B452016,GE0145B822017)
【分類號(hào)】:TV53;TV554
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 汪嫻;;TBM綜合管理信息系統(tǒng)在水利工程中的應(yīng)用[J];內(nèi)蒙古水利;2011年06期
2 葉定海;李仕森;賈寒飛;;南水北調(diào)西線工程的TBM選型探討[J];水利水電技術(shù);2009年07期
3 張利民;;引洮單護(hù)盾TBM掘進(jìn)通過不良地質(zhì)洞段施工技術(shù)[J];甘肅農(nóng)業(yè);2012年09期
4 姚志國;杜士斌;杜業(yè)彥;;隧洞掘進(jìn)機(jī)(TBM)的洞外組裝[J];安徽農(nóng)業(yè)科學(xué);2007年18期
5 姚志國;杜士斌;杜業(yè)彥;;隧洞掘進(jìn)機(jī)(TBM)的洞外組裝[J];東北水利水電;2007年06期
6 王平;劉凱;;TBM在不良地質(zhì)條件下的施工技術(shù)[J];廣西水利水電;2008年05期
7 任軍;;新疆大坂隧洞工程TBM綜合管理信息系統(tǒng)建設(shè)探討[J];水利建設(shè)與管理;2008年01期
8 ;全斷面巖石掘進(jìn)機(jī)(TBM)技術(shù)研究與開發(fā)[J];中國水利;2006年24期
9 干志惠;;水電站的TBM選型與施工關(guān)鍵技術(shù)分析[J];現(xiàn)代商貿(mào)工業(yè);2011年13期
10 毛擁政;張民仙;宋永軍;;引紅濟(jì)石工程長隧洞TBM選型探討[J];水利與建筑工程學(xué)報(bào);2009年01期
相關(guān)會(huì)議論文 前2條
1 祁海燕;;TBM鋼筋排架安裝系統(tǒng)應(yīng)用[A];水與水技術(shù)(第4輯)[C];2014年
2 ;弗吉尼亞州羅賓斯雙護(hù)盾TBM破非正式記錄[A];第十三屆海峽兩岸隧道與地下工程學(xué)術(shù)及技術(shù)研討會(huì)論文集[C];2014年
相關(guān)碩士學(xué)位論文 前1條
1 朱宇琦;安徽省萬元GDP用水量影響因素及其區(qū)域差異性研究[D];揚(yáng)州大學(xué);2015年
,本文編號(hào):2358944
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2358944.html