高海拔陡深斜井自密實混凝土及襯砌快速施工技術(shù)的研究
[Abstract]:Inclined shaft refers to the shaft from the ground to the underground roadway [1]. The inclined well with less than 30 擄inclination is generally called the slowly inclined well, and the inclined well with 45 擄dip angle or equal to 45 擄angle is called the steep dip inclined well [1]. In this paper, the steep and deep inclined well at high altitude refers to 2635.017mt, 3223.000m, the inclination is 60 擄, the total length is 1266.743m, the total height difference is 587.983 m, the slope angle is 60 擄, the total length is 1266.743m, the total height difference is 587.983m. Located in Aktao County, Kashi area, Xinjiang, the high pressure diversion pipeline section of the diversion tunnel of Brunkow-Gongge Hydropower Station. The engineering site studied in this paper is the upper inclined well section which uses self-compacting concrete as lining material. The height of the center line of the upper inclined well is 2951.500 mg ~ (3223.000 m), the length is 327.598 m, and the height difference is 271.500 m. The lining of the high pressure pipeline section of the steep and deep inclined well of the water diversion tunnel of Boulenkou Gongge Hydropower Station adopts the inner diameter of 3 m, the pressure steel pipe of thick 16mm~48mm is used as the inner lining of the high pressure water diversion pipeline, and the plain concrete is poured between the outside of the pipe and the wall of the surrounding rock after excavation [2]. The primary design of plain concrete was designed with secondary high performance concrete with physical performance index of C20F300W6. However, after the pouring work of the section of Shangping Cave is finished, considering the difficulties and problems encountered in the previous pouring work, considering the length of the upper inclined shaft is longer, The problems of pouring construction will be more difficult, the quality of construction will be more difficult to guarantee and the construction speed will be slower. Finally, it is decided to replace the secondary high performance concrete with the first grade self-compacting concrete to finish the lining of the upper inclined shaft. The long inclined shaft is transported by pipe without any buffering facilities, and the length of section is increased to 40m ~ 112m or even 160m by breaking through the normal rule in the steep inclination angle of Brunkou-Gongger Hydropower Station. By reasonably arranging concrete pump cars and pipes, it is possible to make continuous pouring possible, so that the pouring capacity of inclined wells reaches 300 m3 / d, 400m3 / d, which speeds up the construction speed, simplifies the construction process, and reduces the difficulty of construction. The construction efficiency is improved. By qualitatively and quantitatively analyzing and comparing the construction speed of self-compacting concrete lining and conventional concrete lining in steep and deep inclined wells, the material cost unit price, labor cost unit price and comprehensive unit price are calculated. The superiority of self-compacting concrete is highlighted, and the application of self-compacting concrete in steep and deep inclined shaft lining engineering is proved to be of great significance.
【學(xué)位授予單位】:新疆農(nóng)業(yè)大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TV431;TV554.14
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 劉小潔;余志武;;自密實混凝土的研究與應(yīng)用綜述[J];鐵道科學(xué)與工程學(xué)報;2006年02期
2 王懷義;楊桂權(quán);賀傳卿;;二級配自密實混凝土在洞襯工程中的試驗及應(yīng)用[J];粉煤灰;2010年01期
3 崔龍;張紅忠;侍克斌;董文明;白現(xiàn)軍;鄧英銘;;布侖口—公格爾水電站深斜豎井的導(dǎo)洞軸線施工控制[J];水利與建筑工程學(xué)報;2012年02期
4 張允楠;陳家軍;;自密實混凝土在光照水電站工程中的應(yīng)用[J];貴州水力發(fā)電;2008年05期
5 許爾明;;自密實混凝土在九甸峽水利樞紐高壓管道中的應(yīng)用[J];甘肅水利水電技術(shù);2011年01期
6 黃炳周;;自密實混凝土在詔安龍?zhí)峨娬局械膽?yīng)用[J];廣西水利水電;2010年05期
7 溫曉英;程子悅;李琛;王志國;劉天生;;西江引水工程盾構(gòu)輸水隧洞襯砌形式的選擇與設(shè)計[J];中國給水排水;2012年10期
8 孫麗曼;;南水北調(diào)工程西甘池隧洞工程施工方案的調(diào)整[J];北京水務(wù);2011年01期
9 張曙光;;淺談自密實混凝土的研究及應(yīng)用現(xiàn)狀[J];山西建筑;2009年34期
10 董振鋒;房小波;劉雪霞;張紅升;;自密實混凝土在窄口水庫泄洪洞加固中的應(yīng)用[J];人民長江;2012年03期
本文編號:2342119
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2342119.html