大型高樁碼頭整體拆除工藝應(yīng)用
[Abstract]:In view of the difficulties such as the difficulty of transnational deployment of the whole dismantling of the high pile wharf in the third phase and the second stage of the (CCT) project of the container terminal of Cologne Port, Panama, the short construction period of the project, the low efficiency and high risk of the traditional underwater pile cutting process, etc. Through the comparative study of various demolition techniques and the improvement of the traditional rope saw guide frame and the successful application of the new hydraulic shearing pile, a complete set of technology suitable for the removal of the high pile wharf on land has been formed. It provides a new idea and new technology for the reconstruction and extension of high pile wharf, especially for the removal of pile foundation, and provides a reference for similar projects.
【作者單位】: 中交一航局第二工程有限公司;
【分類號】:U657
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 張建國,孫建澎;高樁碼頭維護(hù)檢測有關(guān)問題的探討[J];水道港口;2001年01期
2 陳強(qiáng),馮濤,趙立鵬,孫紅梅,程文欽,由振功;受損高樁碼頭結(jié)構(gòu)承載能力“論證方法”探討[J];中國港灣建設(shè);2003年05期
3 謝殿武,劉建國;高樁碼頭接岸結(jié)構(gòu)中一種比較合理的處理形式[J];水道港口;2004年04期
4 陳平;袁孟全;;高樁碼頭位移原因分析及其預(yù)防措施[J];中國港灣建設(shè);2006年06期
5 蔡銳華;;試論高樁碼頭設(shè)計使用年限100年[J];中國港灣建設(shè);2009年02期
6 寧澤賓;;淺談如何通過檢測結(jié)果對高樁碼頭進(jìn)行評估[J];珠江水運(yùn);2010年05期
7 楊帆;;高樁碼頭面層裂縫的施工控制[J];港口科技;2011年08期
8 文鵬;陳志永;;高樁碼頭施工技術(shù)的應(yīng)用分析[J];中國水運(yùn)(下半月);2011年12期
9 周斌;;高樁碼頭結(jié)構(gòu)的病害分析及施工的質(zhì)量控制[J];中國水運(yùn)(下半月);2012年01期
10 張淑華;李攀;江君;;船舶與高樁碼頭碰撞過程的數(shù)值模擬[J];水運(yùn)工程;2012年06期
相關(guān)會議論文 前10條
1 黃長虹;韋灼彬;張琦彬;;高樁碼頭銹蝕監(jiān)測研究[A];第17屆全國結(jié)構(gòu)工程學(xué)術(shù)會議論文集(第Ⅱ冊)[C];2008年
2 王濱;李穎;朱彬彬;鄭鵬翔;周永;;平面形狀不規(guī)則高樁碼頭的地震扭轉(zhuǎn)效應(yīng)[A];現(xiàn)代水利水電工程抗震防災(zāi)研究與進(jìn)展(2013年)[C];2013年
3 方t,
本文編號:2323898
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2323898.html