水力插板透水式丁壩群減緩流速效果試驗(yàn)研究
[Abstract]:Hydraulic plug plate permeable spur dike is a new type of dike. The dynamic bed model tests were carried out with hydraulic plug plate permeable spur dike group, well column pile permeable spur dike group and solid spur dike group as research objects. The velocity of measured points in front of each spur dam and 5 cm after dam was measured, then the average velocity of velocity was calculated by using the velocity of each measuring point, and the difference of deceleration velocity of each group of spur dikes was judged by comparing the average velocity of cross section. The mechanism of slowing the difference of velocity is analyzed and explained in detail. The results show that the velocity reduction rate and decrease amount of hydraulic plug plate permeable spur dike group and well pillar pile permeable spur dike group are increased by 3423% and 107%, respectively, compared with that of solid dike group. The local scour and siltation behind the spur dike will be affected by the slow flow velocity. The topography near each spur group is measured and the topographic map near the spur dike group is plotted by surfer8.0. The results show that the local scour of solid groin group is the most serious, and the area of sedimentation behind dam is the smallest, the local scour of hydraulic plug plate permeable spur dike group is the least serious, and the area of sedimentation behind dam is the largest. The local scour of well pile permeable spur dam group and the sedimentation range behind the dam are between them.
【作者單位】: 新疆農(nóng)業(yè)大學(xué)水利與土木工程學(xué)院;
【基金】:國(guó)家自然科學(xué)基金項(xiàng)目(51469032) 新疆高?蒲杏(jì)劃項(xiàng)目(XJEDU2013I12) 新疆水利水電工程重點(diǎn)學(xué)科基金資助項(xiàng)目(xjzdxk-2010-02-12)
【分類號(hào)】:TV863
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 顧立軍;劉小川;何富榮;;水力插板技術(shù)在工程建設(shè)中的應(yīng)用[J];水科學(xué)與工程技術(shù);2010年05期
2 任玉香;;水利插板技術(shù)的特點(diǎn)及在堤壩施工中的應(yīng)用[J];科技創(chuàng)新與應(yīng)用;2014年07期
3 馮全宏,陳富強(qiáng),張志建;塑料排水帶深水施工技術(shù)與設(shè)備[J];中國(guó)水利;2000年10期
4 黃秋鴻,石艷;插板截滲墻在惠州大堤加固工程中的應(yīng)用[J];水利水電科技進(jìn)展;2001年05期
5 毛昶熙;閘壩泄流局部沖刷問(wèn)題(一)——閘壩工程的水力破壞[J];人民黃河;1988年03期
6 韋雁機(jī);葉銀燦;;床面上短圓柱體局部沖刷三維數(shù)值模擬[J];水動(dòng)力學(xué)研究與進(jìn)展A輯;2008年06期
7 李東風(fēng);張紅武;謝華偉;歐劍;陶愛(ài)強(qiáng);張繼原;;名山橋局部沖刷二維數(shù)值計(jì)算分析和防護(hù)研究[J];浙江水利水電專科學(xué)校學(xué)報(bào);2012年04期
8 李保如;關(guān)于閘工建筑物運(yùn)用管理中兩個(gè)問(wèn)題的商榷——渠系淤積和閘下局部沖刷問(wèn)題[J];水利水電技術(shù);1963年10期
9 姜萌;李玉成;韓麗華;張日向;;近海孤立圓柱基底的局部沖刷試驗(yàn)研究[J];中國(guó)海洋平臺(tái);2009年03期
10 陳兵;邵學(xué);韓麗華;姜萌;;海洋立管的局部沖刷實(shí)驗(yàn)[J];沈陽(yáng)工業(yè)大學(xué)學(xué)報(bào);2009年06期
相關(guān)會(huì)議論文 前3條
1 Donald W KNIGHT;;復(fù)式斷面灘地部分植被條件下水流橫向流速分布(英文)[A];Collection of 2009 International Forum on Water Resources and Sustainable Development[C];2009年
2 劉春晶;王興奎;曹文洪;徐永年;;明渠均勻流流速分布的指數(shù)、對(duì)數(shù)公式對(duì)比[A];中國(guó)水利學(xué)會(huì)第二屆青年科技論壇論文集[C];2005年
3 陳志樂(lè);賈曉荷;劉樺;;近海直立圓柱局部沖刷數(shù)學(xué)模型研究進(jìn)展[A];第二十屆全國(guó)水動(dòng)力學(xué)研討會(huì)文集[C];2007年
相關(guān)博士學(xué)位論文 前2條
1 Q醚,
本文編號(hào):2310481
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2310481.html