白鶴灘水電站全面開工
[Abstract]:On the morning of Aug. 3, 2017, the largest hydropower project under construction in the world, the Paihetan Hydropower Station on the Jinsha River, held a construction mobilization conference, marking the full start of the project. Baihetan Hydropower Station, located in Ningnan County, Sichuan Province and Qiaojia County, Yunnan Province, is the second cascade of four hydropower stations in the lower reaches of the Jinsha River. The main task of its development is to generate electricity, take into account flood control, and have comprehensive utilization benefits such as developing shipping in the reservoir area and improving the conditions of navigation downstream, which is one of the key power supply points for the power supply from the west to the east.
【分類號(hào)】:TV752
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 黃麗;;水電站樞紐工程區(qū)集鎮(zhèn)的變遷——來自白鶴灘水電站的調(diào)查報(bào)告[J];三峽論壇(三峽文學(xué).理論版);2012年04期
2 張成穩(wěn);曾廳余;宗德孝;居志剛;;白鶴灘水電站建設(shè)期氣象保障服務(wù)思考[J];云南大學(xué)學(xué)報(bào)(自然科學(xué)版);2012年S2期
3 ;金沙江白鶴灘水電站開工[J];云南水力發(fā)電;2011年06期
4 ;白鶴灘水電站施工總布置規(guī)劃復(fù)核報(bào)告通過審查[J];水利水電施工;2010年04期
5 金珍宏;;白鶴灘水電站運(yùn)行期能耗指標(biāo)計(jì)算分析[J];水利規(guī)劃與設(shè)計(jì);2013年04期
6 劉振中;黎細(xì)波;張婷;;半預(yù)制式界樁在白鶴灘水電站建設(shè)征地界樁測(cè)設(shè)中的應(yīng)用[J];大壩與安全;2012年04期
7 于雷;;白鶴灘水電站明挖工程爆破降塵試驗(yàn)方案研究[J];科技與企業(yè);2013年22期
8 金珍宏;;白鶴灘水電站施工期能耗量分析方法[J];水利水電技術(shù);2012年11期
9 向欣;趙強(qiáng);;白鶴灘水電站邊坡穩(wěn)定控制因素與破壞模式研究[J];水利水電技術(shù);2013年11期
10 李新宇;陳煒e,
本文編號(hào):2309458
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2309458.html