溫度效應(yīng)對(duì)全直樁現(xiàn)澆梁板高樁碼頭結(jié)構(gòu)的影響
[Abstract]:In view of the effect of temperature effect on cast-in-place beam-slab high pile wharf, the influence of temperature effect on internal force is compared and discussed after adding temperature effect to four different length structural sections such as 75150200300m. By using the international general finite element software to calculate the three-dimensional space, it is concluded that the appropriate length of the structure section can reduce the bending moment, shear force and axial force of pile foundation, longitudinal and transverse beam to a certain extent under the domestic environment.
【作者單位】: 中交第四航務(wù)工程勘察設(shè)計(jì)院有限公司;
【分類(lèi)號(hào)】:U656.113
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 陳強(qiáng),馮濤,趙立鵬,孫紅梅,程文欽,由振功;受損高樁碼頭結(jié)構(gòu)承載能力“論證方法”探討[J];中國(guó)港灣建設(shè);2003年05期
2 謝殿武,劉建國(guó);高樁碼頭接岸結(jié)構(gòu)中一種比較合理的處理形式[J];水道港口;2004年04期
3 陳平;袁孟全;;高樁碼頭位移原因分析及其預(yù)防措施[J];中國(guó)港灣建設(shè);2006年06期
4 蔡銳華;;試論高樁碼頭設(shè)計(jì)使用年限100年[J];中國(guó)港灣建設(shè);2009年02期
5 寧澤賓;;淺談如何通過(guò)檢測(cè)結(jié)果對(duì)高樁碼頭進(jìn)行評(píng)估[J];珠江水運(yùn);2010年05期
6 楊帆;;高樁碼頭面層裂縫的施工控制[J];港口科技;2011年08期
7 文鵬;陳志永;;高樁碼頭施工技術(shù)的應(yīng)用分析[J];中國(guó)水運(yùn)(下半月);2011年12期
8 周斌;;高樁碼頭結(jié)構(gòu)的病害分析及施工的質(zhì)量控制[J];中國(guó)水運(yùn)(下半月);2012年01期
9 張淑華;李攀;江君;;船舶與高樁碼頭碰撞過(guò)程的數(shù)值模擬[J];水運(yùn)工程;2012年06期
10 翟劍峰;吉同元;秦網(wǎng)根;高鵬;;在役高樁碼頭結(jié)構(gòu)穩(wěn)定性的綜合分析[J];中國(guó)水運(yùn);2013年02期
相關(guān)會(huì)議論文 前10條
1 黃長(zhǎng)虹;韋灼彬;張琦彬;;高樁碼頭銹蝕監(jiān)測(cè)研究[A];第17屆全國(guó)結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集(第Ⅱ冊(cè))[C];2008年
2 王濱;李穎;朱彬彬;鄭鵬翔;周永;;平面形狀不規(guī)則高樁碼頭的地震扭轉(zhuǎn)效應(yīng)[A];現(xiàn)代水利水電工程抗震防災(zāi)研究與進(jìn)展(2013年)[C];2013年
3 方t,
本文編號(hào):2269252
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2269252.html