天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁(yè) > 科技論文 > 水利工程論文 >

水電站地下廠房洞室群施工期圍巖變形特征與穩(wěn)定性

發(fā)布時(shí)間:2018-09-09 18:22
【摘要】:根據(jù)施工過(guò)程巖層揭露情況,結(jié)合圍巖變形監(jiān)測(cè)數(shù)據(jù),分析圍巖變形狀況。根據(jù)施工期巖層探測(cè)結(jié)果,建立地下廠房洞室群大型有限元模型,利用變形監(jiān)測(cè)數(shù)據(jù),對(duì)地下廠房洞室群的圍巖力學(xué)參數(shù)進(jìn)行反演分析;結(jié)合數(shù)值仿真結(jié)果,分析圍巖變形規(guī)律。研究結(jié)果表明:主廠房第一層開(kāi)挖穿越Ⅲ_1,Ⅲ_2和Ⅳ類(lèi)圍巖,圍巖變形受巖層性質(zhì)影響較明顯,在Ⅳ類(lèi)圍巖穿越的副廠房位置,圍巖變形較大;廠橫0+153.81斷面的變形明顯比其他斷面的大,在后續(xù)開(kāi)挖過(guò)程中應(yīng)加強(qiáng)對(duì)Ⅳ類(lèi)圍巖變形的監(jiān)控量測(cè)。
[Abstract]:According to the exposure of rock strata during construction and the monitoring data of surrounding rock deformation, the deformation status of surrounding rock is analyzed. A large finite element model of underground powerhouse cavern group was established according to the results of rock stratum detection during construction period. The mechanical parameters of surrounding rock of underground powerhouse cavern group were inversely analyzed by using deformation monitoring data, and the numerical simulation results were combined. The deformation law of surrounding rock is analyzed. The results show that the first floor excavation of the main powerhouse passes through the surrounding rock of type 鈪,

本文編號(hào):2233202

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2233202.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶14598***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com