天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁(yè) > 科技論文 > 水利工程論文 >

深埋隧洞開(kāi)挖卸荷巖爆孕育過(guò)程及微震預(yù)警分析

發(fā)布時(shí)間:2018-08-13 14:55
【摘要】:深埋巖石隧洞工程普遍遭遇突發(fā)性和破壞性極大的巖爆災(zāi)害,據(jù)不完全統(tǒng)計(jì),僅錦屏二級(jí)水電站隧洞群已開(kāi)挖工程就發(fā)生不同程度巖爆上千次。面對(duì)大量的微震監(jiān)測(cè)數(shù)據(jù),由于難以找到微震數(shù)據(jù)與巖爆孕育過(guò)程的內(nèi)在聯(lián)系和演化規(guī)律,至今在我國(guó)還沒(méi)有非常成功的巖爆監(jiān)測(cè)預(yù)報(bào)案例,因此,開(kāi)展深埋隧洞在高應(yīng)力條件下硬巖的巖爆孕育過(guò)程和微震預(yù)警問(wèn)題研究十分必要。論文以巖石損傷力學(xué)理論為基礎(chǔ),以數(shù)值模擬分析和微震監(jiān)測(cè)為手段,揭示開(kāi)挖卸荷巖爆孕育過(guò)程,基于微震監(jiān)測(cè)數(shù)據(jù)分析探索巖爆的前兆規(guī)律,為巖爆的預(yù)警與防控奠定理論與技術(shù)基礎(chǔ)。建立多種卸荷應(yīng)力路徑和巖體介質(zhì)條件下的數(shù)值模型,進(jìn)行開(kāi)挖卸荷引起巖爆孕育過(guò)程數(shù)值模擬研究。主要內(nèi)容包括:(1)以試樣單軸壓縮破裂過(guò)程模擬相鄰隧洞巖體或者同一條隧洞相向開(kāi)挖而產(chǎn)生的巖柱型巖爆,揭示微震特性為“前震-主震一余震型”模式;(2)以試樣側(cè)壓卸荷破裂過(guò)程模擬現(xiàn)場(chǎng)高應(yīng)力下由于開(kāi)挖引起突然卸荷而產(chǎn)生的巖爆,揭示開(kāi)挖卸荷誘致巖爆的機(jī)理;(3)通過(guò)對(duì)巖體隧洞單步(一次)開(kāi)挖和分步(多次)開(kāi)挖發(fā)生巖爆進(jìn)行數(shù)值模擬,揭示微震事件釋放能量及頻次與施工方式聯(lián)系緊密,揭示微震事件由無(wú)序分布向有序集中發(fā)展呈現(xiàn)自組織的基本規(guī)律。在力學(xué)機(jī)理上,認(rèn)為巖石的非均勻性是巖爆存在前兆的根源,變形的局部化是形成巖爆的內(nèi)因,而巖石與其周?chē)h(huán)境的相互作用是巖爆的外因;谶@方面的認(rèn)識(shí),根據(jù)錦屏二級(jí)水電站現(xiàn)場(chǎng)不同地質(zhì)與開(kāi)挖條件,提出傳感器的布置形式、采集數(shù)據(jù)工作方式。根據(jù)排水洞現(xiàn)場(chǎng)微震監(jiān)測(cè)數(shù)據(jù)分析,通過(guò)對(duì)微震事件數(shù)目、事件位置、事件能量、能量釋放速率、事件聚集密度云圖等多因素進(jìn)行量化,并結(jié)合開(kāi)挖過(guò)程的數(shù)值模擬,進(jìn)行巖爆孕育過(guò)程的預(yù)警分析,揭示極強(qiáng)巖爆和強(qiáng)巖爆的預(yù)警機(jī)制。對(duì)巖爆災(zāi)害的預(yù)警和防控奠定理論基礎(chǔ),為指導(dǎo)安全施工提供技術(shù)保障。根據(jù)1#引水隧洞微震監(jiān)測(cè)分析,揭示采用先導(dǎo)洞后TBM落地掘進(jìn)施工方案,可以降低或者控制發(fā)生巖爆。3#和4#引水洞相鄰多個(gè)工作面同時(shí)掘進(jìn),通過(guò)三維數(shù)值模擬和微震監(jiān)測(cè)數(shù)據(jù)分析,揭示巖爆發(fā)生部位受相鄰隧洞嚴(yán)重的影響。
[Abstract]:The deep buried rock tunnel engineering is generally met with sudden and destructive rock burst disasters. According to incomplete statistics, only the tunnel group of Jinping II hydropower station has been excavated for thousands of times in varying degrees. In the face of a large number of microseismic monitoring data, because it is difficult to find the inherent relation and evolution law between microseismic data and the process of rockburst inoculation, so far there are not very successful cases of rockburst monitoring and prediction in China, so, It is necessary to study the preparation process of rock burst and the early warning of microearthquakes in deep buried tunnel under high stress conditions. Based on rock damage mechanics theory, numerical simulation analysis and microseismic monitoring are used to reveal the incubation process of excavation unloading rockburst, and the precursor law of rockburst is explored based on microseismic monitoring data. It lays a theoretical and technical foundation for early warning and prevention and control of rock burst. The numerical models of various unloading stress paths and rock mass media are established to simulate the incubation process of rock burst caused by excavation unloading. The main contents are as follows: (1) the rock column rockburst caused by the rock mass of adjacent tunnel or the same tunnel is simulated by the uniaxial compression fracture process of the specimen, which reveals that the microseismic characteristic is the model of "foreshock-main-aftershock type"; (2) simulating the rockburst caused by excavation under high stress, and revealing the mechanism of rockburst induced by excavation unloading; (3) through numerical simulation of rock burst in single step excavation and step by step excavation of rock mass tunnel, it is revealed that the release energy and frequency of microseismic events are closely related to the construction mode. It is revealed that the development of microseismic events from disordered distribution to orderly concentration presents the basic law of self-organization. On the mechanical mechanism, it is considered that the heterogeneity of rock is the root of the precursor of rock burst, the localization of deformation is the internal cause of rock burst, and the interaction between rock and its surrounding environment is the external cause of rock burst. Based on the understanding of this aspect, according to the different geological and excavation conditions of the second stage hydropower station in Jinping, the layout of sensors and the working mode of collecting data are put forward. Based on the analysis of microseismic monitoring data in drainage tunnel field, the number of microseismic events, event location, event energy, energy release rate, event aggregation density cloud map and so on are quantified, and the numerical simulation of excavation process is combined. The early warning mechanism of extremely strong rock burst and strong rock burst is revealed by early warning analysis of the inoculation process of rock burst. It lays a theoretical foundation for early warning and prevention and control of rock burst disaster and provides technical guarantee for guiding safe construction. According to the microseismic monitoring and analysis of 1# diversion tunnel, it is revealed that the construction scheme of TBM landing tunneling after pilot tunnel can reduce or control the occurrence of rockburst. The excavation of several faces adjacent to the diversion tunnel can be reduced or controlled at the same time. Through 3D numerical simulation and data analysis of microseismic monitoring, it is revealed that the location of rock burst is seriously affected by adjacent tunnels.
【學(xué)位授予單位】:東北大學(xué)
【學(xué)位級(jí)別】:博士
【學(xué)位授予年份】:2015
【分類(lèi)號(hào)】:TV554

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 魏利娜;薛世鵬;周春艷;丁慧哲;李靜;;微震信號(hào)現(xiàn)場(chǎng)監(jiān)測(cè)試驗(yàn)及特征研究[J];河北工程大學(xué)學(xué)報(bào)(自然科學(xué)版);2014年02期

2 許曉陽(yáng);王恩元;許福樂(lè);李忠輝;;煤巖單軸壓縮條件下微震頻譜特征研究[J];應(yīng)用聲學(xué);2010年02期

3 陳炳瑞;馮夏庭;李庶林;袁節(jié)平;徐速超;;基于粒子群算法的巖體微震源分層定位方法[J];巖石力學(xué)與工程學(xué)報(bào);2009年04期

4 唐禮忠;張君;李夕兵;汪令輝;周建雄;劉濤;;基于定量地震學(xué)的礦山微震活動(dòng)對(duì)開(kāi)采速率的響應(yīng)特性研究[J];巖石力學(xué)與工程學(xué)報(bào);2012年07期

5 ;第六屆礦山中的巖爆與微震國(guó)際會(huì)議(RaSiM6)征文通知[J];巖石力學(xué)與工程學(xué)報(bào);2004年11期

6 呂進(jìn)國(guó);姜耀東;趙毅鑫;祝捷;王欣;陶磊;;基于穩(wěn)健模擬退火-單純形混合算法的微震定位研究[J];巖土力學(xué);2013年08期

7 王煥義;巖體微震事件的精確定位研究[J];工程爆破;2001年03期

8 王春來(lái);吳愛(ài)祥;劉曉輝;李瑞;吉學(xué)文;;深井開(kāi)采微震活動(dòng)容量維D_f變化特征[J];北京科技大學(xué)學(xué)報(bào);2010年11期

9 朱權(quán)潔;姜福興;于正興;尹永明;呂壘;;爆破震動(dòng)與巖石破裂微震信號(hào)能量分布特征研究[J];巖石力學(xué)與工程學(xué)報(bào);2012年04期

10 吳愛(ài)祥;武力聰;劉曉輝;王春來(lái);黃武勝;朱權(quán)潔;;礦山微地震活動(dòng)時(shí)空分布[J];北京科技大學(xué)學(xué)報(bào);2012年06期

相關(guān)會(huì)議論文 前7條

1 李國(guó)營(yíng);劉虎;;唐口礦井受采動(dòng)影響下微震活動(dòng)規(guī)律研究[A];綜采放頂煤技術(shù)理論與實(shí)踐的創(chuàng)新發(fā)展——綜放開(kāi)采30周年科技論文集[C];2012年

2 王永仁;歐陽(yáng)振華;孔令海;趙善坤;李曉璐;;不同地質(zhì)條件下微震信號(hào)衰減規(guī)律研究[A];第3屆全國(guó)工程安全與防護(hù)學(xué)術(shù)會(huì)議論文集[C];2012年

3 高峰;呂進(jìn)國(guó);;基于HHT方法的微震信號(hào)時(shí)頻分析[A];北京力學(xué)會(huì)第18屆學(xué)術(shù)年會(huì)論文集[C];2012年

4 王鵬;常旭;王一博;王璐琛;;水力壓裂誘發(fā)微震事件的頻譜特征統(tǒng)計(jì)分析[A];中國(guó)地球物理2013——第二十三專(zhuān)題論文集[C];2013年

5 張傳玖;毛學(xué)健;;強(qiáng)沖擊煤層綜采工作面微震活動(dòng)分析研究[A];煤炭開(kāi)采新理論與新技術(shù)——中國(guó)煤炭學(xué)會(huì)開(kāi)采專(zhuān)業(yè)委員會(huì)2012年學(xué)術(shù)年會(huì)論文集[C];2012年

6 周勝健;劉超;;采動(dòng)下新莊孜礦62113工作面地質(zhì)預(yù)警微震實(shí)踐[A];2010年度淮南礦業(yè)集團(tuán)煤炭學(xué)會(huì)學(xué)術(shù)交流會(huì)論文匯編(一)·地質(zhì)專(zhuān)業(yè)[C];2010年

7 李學(xué)政;唐云凱;;微震工程檢測(cè)與應(yīng)用技術(shù)[A];國(guó)家安全地球物理叢書(shū)(七)——地球物理與核探測(cè)[C];2011年

相關(guān)重要報(bào)紙文章 前1條

1 本報(bào)記者 張靜;三峽微震[N];21世紀(jì)經(jīng)濟(jì)報(bào)道;2003年

相關(guān)博士學(xué)位論文 前6條

1 黃志平;深埋隧洞開(kāi)挖卸荷巖爆孕育過(guò)程及微震預(yù)警分析[D];東北大學(xué);2015年

2 楊威;煤巖變形破裂電磁和微震信號(hào)關(guān)聯(lián)響應(yīng)機(jī)理及特征研究[D];中國(guó)礦業(yè)大學(xué)(北京);2014年

3 劉建坡;深井礦山地壓活動(dòng)與微震時(shí)空演化關(guān)系研究[D];東北大學(xué);2011年

4 胡永泉;地面微震資料去噪方法研究[D];西南石油大學(xué);2013年

5 劉超;采動(dòng)煤巖瓦斯動(dòng)力災(zāi)害致災(zāi)機(jī)理及微震預(yù)警方法研究[D];大連理工大學(xué);2011年

6 葉慶東;大別蘇魯?shù)貐^(qū)背景噪聲成像與汶川地震科學(xué)鉆探井孔附近微震定位[D];中國(guó)地震局地球物理研究所;2014年

相關(guān)碩士學(xué)位論文 前10條

1 周莉;基于礦山巖石破裂的微震信號(hào)的檢測(cè)與研究[D];昆明理工大學(xué);2015年

2 商鵬;爆破掘進(jìn)煤巖破裂微震信號(hào)特征研究[D];河南理工大學(xué);2014年

3 朱超;微震實(shí)時(shí)在線監(jiān)測(cè)系統(tǒng)的研究與實(shí)現(xiàn)[D];武漢科技大學(xué);2012年

4 景林波;煤礦微震信號(hào)特征及傳播規(guī)律研究[D];中國(guó)礦業(yè)大學(xué);2014年

5 劉佳;地下礦山實(shí)時(shí)信號(hào)的微震震源分析[D];武漢科技大學(xué);2013年

6 閆憲磊;東灘煤礦深井綜放工作面微震發(fā)生規(guī)律研究[D];遼寧工程技術(shù)大學(xué);2012年

7 吳以群;煤系地層微震定位算法的研究[D];安徽理工大學(xué);2014年

8 陶慧暢;地下礦山實(shí)時(shí)在線安全監(jiān)測(cè)系統(tǒng)研究[D];武漢科技大學(xué);2013年

9 張東;厚煤層無(wú)區(qū)段煤柱錯(cuò)層位開(kāi)采微震與地音特征研究[D];安徽理工大學(xué);2013年

10 安鳳平;微震信號(hào)識(shí)別、定位及其在礦山安全管理中的應(yīng)用[D];河北工程大學(xué);2011年

,

本文編號(hào):2181319

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2181319.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶(hù)56fb7***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com
国产精品一区二区不卡中文| 2019年国产最新视频| 老司机精品视频在线免费看| 色婷婷人妻av毛片一区二区三区| 欧美日韩人妻中文一区二区 | 黑色丝袜脚足国产一区二区| 欧美一区二区黑人在线| 91精品国自产拍老熟女露脸| 日韩女优视频国产一区| 福利视频一区二区三区| 男人的天堂的视频东京热| 少妇激情在线免费观看| 我要看日本黄色小视频| 欧美美女视频在线免费看| 高清不卡视频在线观看| 丰满少妇高潮一区二区| 偷拍偷窥女厕一区二区视频| 婷婷一区二区三区四区| 久久本道综合色狠狠五月| 在线免费视频你懂的观看 | 国产日韩精品欧美综合区| 久久少妇诱惑免费视频| 小黄片大全欧美一区二区| 欧美三级不卡在线观线看| 日韩中文字幕人妻精品| 沐浴偷拍一区二区视频| 亚洲一区二区三区精选| 99久久精品免费看国产高清| 国产精品人妻熟女毛片av久久| 欧美一级片日韩一级片 | 国产日本欧美特黄在线观看| 精品人妻av区波多野结依| 欧美日韩亚洲综合国产人| 亚洲国产av精品一区二区| 夫妻性生活真人动作视频| 亚洲欧美日韩另类第一页| 国产精品视频一区二区秋霞| 99久久精品午夜一区二| 国产一区二区不卡在线视频| 麻豆国产精品一区二区三区| 偷拍偷窥女厕一区二区视频|