網(wǎng)絡(luò)進(jìn)度計(jì)劃管理在水電前期工作中的應(yīng)用
發(fā)布時(shí)間:2018-06-24 05:22
本文選題:水電項(xiàng)目 + 前期工作; 參考:《水力發(fā)電》2016年01期
【摘要】:水電項(xiàng)目前期工作內(nèi)容多、歷時(shí)長(zhǎng),是一項(xiàng)復(fù)雜的系統(tǒng)工程。將網(wǎng)絡(luò)進(jìn)度計(jì)劃應(yīng)用于水電前期工作中,對(duì)開展前期工作進(jìn)行分析和安排,提高了水電項(xiàng)目前期工作管理的計(jì)劃性、統(tǒng)籌性。介紹了水電項(xiàng)目前期工作和網(wǎng)絡(luò)進(jìn)度計(jì)劃管理的特點(diǎn);在理清水電項(xiàng)目前期工作主要邏輯關(guān)系的基礎(chǔ)上,對(duì)前期網(wǎng)絡(luò)進(jìn)度計(jì)劃圖的編制和應(yīng)用進(jìn)行了分析。
[Abstract]:Hydropower project is a complicated system engineering with many contents and long time. The network schedule is applied to the preliminary work of hydropower, and the analysis and arrangement of the preliminary work are carried out, which improves the planning and overall planning of the pre-work management of hydropower projects. This paper introduces the characteristics of the preliminary work of hydropower project and the management of the network schedule, and analyzes the compilation and application of the network schedule map in advance on the basis of clarifying the main logical relations of the preliminary work of the hydropower project.
【作者單位】: 中國(guó)華電集團(tuán)公司;
【分類號(hào)】:TV511
【相似文獻(xiàn)】
相關(guān)期刊論文 前3條
1 何偉;吳維興;邱志鵬;姜東波;;資源約束網(wǎng)絡(luò)進(jìn)度計(jì)劃模型研究[J];大壩與安全;2013年06期
2 王仁超;荊瓏;王晨旭;韓家琪;;基于CBR的水利水電工程網(wǎng)絡(luò)進(jìn)度計(jì)劃輔助生成系統(tǒng)研究[J];水利與建筑工程學(xué)報(bào);2013年06期
3 ;[J];;年期
相關(guān)博士學(xué)位論文 前1條
1 潘菲菲;水利水電工程網(wǎng)絡(luò)進(jìn)度計(jì)劃輔助生成理論與方法研究[D];天津大學(xué);2013年
相關(guān)碩士學(xué)位論文 前3條
1 荊瓏;基于多知識(shí)源網(wǎng)絡(luò)進(jìn)度計(jì)劃輔助生成技術(shù)與方法研究[D];天津大學(xué);2014年
2 潘菲菲;基于水電工程預(yù)算定額的網(wǎng)絡(luò)進(jìn)度計(jì)劃標(biāo)準(zhǔn)化研究[D];天津大學(xué);2010年
3 鐘笑萍;模糊網(wǎng)絡(luò)計(jì)劃技術(shù)研究與應(yīng)用[D];西安理工大學(xué);2006年
,本文編號(hào):2060212
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2060212.html
最近更新
教材專著