南水北調(diào)中線干線渠道工程工期延誤分析方法研究
本文選題:南水北調(diào) + 渠道工程。 參考:《水電能源科學》2017年02期
【摘要】:在對南水北調(diào)中線干線渠道工程進行工期索賠分析計算時,采用合理的延誤分析方法是順利協(xié)調(diào)處理索賠的關鍵。在分析現(xiàn)行主要延誤分析方法的局限性和適用性的基礎上,提出了一種新的工期延誤分析方法,即沙盤推演計劃比較法,給出了該方法的基本原則、分析流程,然后結(jié)合進度管理軟件P6,以南水北調(diào)中線某標段工程為例進行了計算分析,驗證了該方法的可行性和有效性。
[Abstract]:In the analysis and calculation of the time claim for the channel project of the middle route of South-to-North Water transfer Project, the key to coordinate the processing of the claim is to adopt a reasonable method of delay analysis. On the basis of analyzing the limitation and applicability of the current main delay analysis methods, a new method of time delay analysis, namely the sand table deduction plan comparison method, is put forward, and the basic principle and analysis flow of this method are given. Based on the progress management software P6, the feasibility and effectiveness of this method are verified by taking a project of the middle route of South-to-North Water transfer Project as an example.
【作者單位】: 華北水利水電大學水利學院;
【基金】:華北水利水電大學高層次人才科研啟動項目(08015)
【分類號】:TV68;TV511
【相似文獻】
相關期刊論文 前10條
1 鄧珠根,曾愛梅;談新干縣渠道工程的維修養(yǎng)護管理經(jīng)驗[J];江西水利科技;2001年03期
2 祝江裕;;噴射鋼纖維混凝土在渠道工程的應用研究[J];水利水電技術(shù);2010年07期
3 李銘杰;范晏崗;全永威;;淺談沙漠渠道工程的施工技術(shù)和方法[J];陜西水利;2011年01期
4 劉潔;;談水利渠道工程的防滲規(guī)劃與設計[J];中國新技術(shù)新產(chǎn)品;2011年22期
5 丁生云;;水利渠道工程的防滲與設計[J];硅谷;2013年02期
6 邊曉娜;;芻議水利渠道工程的施工[J];黑龍江科技信息;2013年16期
7 袁雪松;李洪波;;水利渠道工程的防滲施工與設計[J];科技創(chuàng)業(yè)家;2013年09期
8 劉伍寧;;山區(qū)渠道工程線路布置方式及建議[J];陜西水利;2013年05期
9 魯永潮;;水利渠道工程防滲施工方法探究[J];科技創(chuàng)業(yè)家;2013年18期
10 王英文,高春文;增強渠道工程自身防洪抗災能力的思考[J];河北水利;1997年06期
相關會議論文 前2條
1 王永;;渠道工程渠坡砂濾層機械化平砂、振壓施工工法[A];第二屆全國灌區(qū)及水工建筑物防滲抗凍脹技術(shù)與生態(tài)建設?痆C];2010年
2 左燕霞;;灌區(qū)渠道工程施工監(jiān)理措施淺析[A];2014年5月建筑科技與管理學術(shù)交流會論文集[C];2014年
相關重要報紙文章 前1條
1 張祺;江西聯(lián)通實施“五項工程”加快發(fā)展[N];人民郵電;2008年
,本文編號:2044536
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2044536.html