豐滿水電站重建工程高水頭地下洞室群封堵設(shè)計(jì)
發(fā)布時(shí)間:2018-06-12 05:14
本文選題:高水頭 + 人工洞室群; 參考:《水利水電技術(shù)》2016年06期
【摘要】:正1工程概況豐滿水電站全面治理(重建)工程是按恢復(fù)電站原任務(wù)和功能,在原豐滿大壩下游120 m處新建一座大壩,并利用原豐滿三期工程。工程以發(fā)電為主,兼有防洪、灌溉、城市及工業(yè)供水、養(yǎng)殖和旅游等綜合利用。電站樞紐建筑物主要由碾壓混凝土重力壩、壩身泄洪系統(tǒng)、左岸泄洪兼導(dǎo)流洞、壩后式引水發(fā)電系統(tǒng)、過魚設(shè)施及利用的原三期電站組成。左岸泄洪兼導(dǎo)流洞前期作為導(dǎo)流泄水建筑物使用,工程施
[Abstract]:General situation of Zheng-1 Project Fengman Hydropower Station Comprehensive Control (Reconstruction) Project is to build a new dam at 120m downstream of the original Fengman Dam according to the original tasks and functions of the power station and utilize the original Fengman Phase III project. The main project is power generation, with comprehensive utilization of flood control, irrigation, urban and industrial water supply, aquaculture and tourism. The main building of the power station is composed of roller compacted concrete gravity dam, dam body flood discharge system, left bank flood discharge and diversion tunnel, back dam type water diversion power generation system, fish crossing facilities and the original third stage power station. The left bank flood discharge and diversion tunnel is used as the diversion and discharge structure in the early stage of the tunnel.
【作者單位】: 中水東北勘測(cè)設(shè)計(jì)研究有限責(zé)任公司;豐滿大壩重建工程建設(shè)局;
【分類號(hào)】:TV738
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 ;我國(guó)第二高水頭電站元江依薩河電站建成投產(chǎn)[J];云南水力發(fā)電;1994年01期
2 張恩博;王千;常洪軍;;豐滿電廠3號(hào)機(jī)組高水頭下穩(wěn)定性試驗(yàn)研究[J];東北電力技術(shù);2007年09期
3 江樹R,
本文編號(hào):2008510
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2008510.html
最近更新
教材專著