移動(dòng)式防洪墻力學(xué)性能試驗(yàn)及施工工藝研究
本文選題:移動(dòng)式防洪墻 + 材料性能 ; 參考:《華北水利水電大學(xué)》2017年碩士論文
【摘要】:移動(dòng)式防洪墻作為一種安裝便捷、美觀的防洪方式在國(guó)外較多應(yīng)用,但在國(guó)內(nèi)為首次應(yīng)用,其工作性能、施工工藝在國(guó)內(nèi)研究甚少,因此急需對(duì)此開展研究,旨在為實(shí)際工程提供理論支撐,為工程施工提供參考。本文通過解析進(jìn)口移動(dòng)式防洪墻的產(chǎn)品性能,提煉出相應(yīng)的性能指標(biāo),同時(shí)專門設(shè)計(jì)、建造了移動(dòng)式防洪墻試驗(yàn)基地,開展移動(dòng)式防洪墻系統(tǒng)的力學(xué)性能試驗(yàn)分析研究和施工工藝研究。具體包括以下內(nèi)容:1.根據(jù)德國(guó)、歐洲標(biāo)準(zhǔn),進(jìn)口移動(dòng)式防洪墻的說明書、檢測(cè)報(bào)告,對(duì)進(jìn)口移動(dòng)式防洪墻各部件的材料性能展開研究,解析進(jìn)口移動(dòng)式防洪墻的產(chǎn)品性能,提煉出相應(yīng)的性能指標(biāo)屈服強(qiáng)度及抗拉強(qiáng)度。2.在移動(dòng)式防洪墻安裝完成后,分步蓄水至設(shè)計(jì)標(biāo)高,測(cè)定不同蓄水高度下各部位受力狀態(tài)。實(shí)驗(yàn)結(jié)果表明,在蓄水正常后,混凝土基礎(chǔ)埋設(shè)鋼筋計(jì)受力均不大,在正常蓄水位1.8m時(shí),最大拉應(yīng)力為0.87MPa,遠(yuǎn)小于鋼筋抗拉強(qiáng)度,混凝土基礎(chǔ)未出現(xiàn)裂縫,結(jié)構(gòu)安全可靠。3.通過立柱錨固試驗(yàn)區(qū),對(duì)單獨(dú)立柱進(jìn)行靜力試驗(yàn),逐級(jí)加載至設(shè)計(jì)荷載,試驗(yàn)結(jié)果表明,立柱及基礎(chǔ)的變位及應(yīng)變正常,立柱及基礎(chǔ)外觀無裂縫產(chǎn)生,加載過程中立柱應(yīng)變隨荷載變化,均呈現(xiàn)直線分布,處于彈性階段,可以保證防洪墻正常運(yùn)行。有限元仿真結(jié)果表明,6種工況組合中流速+撞擊+溢流三種荷載組合螺栓承受的總剪力最大,擋板跨中撓度最大,為最危險(xiǎn)工況,可根據(jù)此工況基礎(chǔ)受力進(jìn)行配筋。4.通過不銹鋼預(yù)埋件、鋁合金相關(guān)規(guī)范引讀,結(jié)合工程施工現(xiàn)場(chǎng)情況,提出預(yù)埋件安裝的兩種方法:1)預(yù)留槽孔安裝法,2)直接安裝法。在試驗(yàn)基地對(duì)兩種安裝方法進(jìn)行試驗(yàn),結(jié)果表明:第一種方法能夠在預(yù)埋件不能按期進(jìn)場(chǎng)的情況下,滿足形象進(jìn)度及工期要求,第二種方法適用于預(yù)埋件按時(shí)進(jìn)場(chǎng),與基礎(chǔ)鋼筋混凝土通過鋼筋提前固定,整體澆筑效果好。在試驗(yàn)基地建成后,對(duì)移動(dòng)式防洪墻系統(tǒng)的立柱擋板進(jìn)行實(shí)地的安裝測(cè)試,結(jié)果表明這種型式的防洪墻安裝方便,效率高。
[Abstract]:As a convenient and beautiful flood control method, mobile flood control wall is widely used in foreign countries, but it is the first application in China. The research on its working performance and construction technology is very few in China, so it is urgent to carry out research on it. The aim is to provide theoretical support for practical engineering and provide reference for engineering construction. In this paper, by analyzing the product performance of imported movable flood control wall, the corresponding performance indexes are refined, and the test base of mobile flood control wall is designed and built. The mechanical performance test and construction technology of mobile flood control wall system are studied. This includes the following: 1. According to the German and European standards, the specifications and testing reports of imported mobile flood control walls, the material properties of various components of imported mobile flood control walls are studied, and the product performance of imported mobile flood control walls is analyzed. The yield strength and tensile strength. 2. After the installation of the movable flood control wall, the loading state of each part under different storage height was measured by step to the design elevation. The experimental results show that after the water storage is normal, the stress of the reinforced gauge embedded in the concrete foundation is not large, and the maximum tensile stress is 0.87 MPa when the normal storage water level is 1.8 m, which is far less than the tensile strength of the steel bar, and there is no crack in the concrete foundation, and the structure is safe and reliable. The static test of single column is carried out in the anchor test area, and the load is loaded to the design load step by step. The test results show that the displacement and strain of the column and foundation are normal, and there are no cracks in the appearance of the column and foundation. In the loading process, the strain of the columns varies with the load, and all of them are linear distribution, and they are in the elastic stage, which can ensure the normal operation of the flood control wall. The finite element simulation results show that the combined bolt bearing the maximum total shear force and the maximum midspan deflection of the baffle is the most dangerous condition, and the reinforcement. 4 can be carried out according to the stress on the basis of the working condition. Through the introduction of relevant codes for stainless steel embedded parts and aluminum alloys, and combined with the construction site, two methods of installation of the embedded parts are put forward: one is the reserved slot installation method and the other is the direct installation method. The results show that the first method can meet the requirements of image schedule and time limit when the embedded parts can not come into the field on time. The second method is suitable for the embedded parts to enter the field on time. With the foundation reinforced concrete fixed in advance through the reinforcement, the overall pouring effect is good. After the construction of the test base, the installation test of the vertical column baffle of the mobile flood control wall system is carried out. The results show that this type of flood control wall is easy to install and high efficiency.
【學(xué)位授予單位】:華北水利水電大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TV32;TV52
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 ;國(guó)產(chǎn)“抗洪神器”——拼裝式防洪墻在武漢投入使用[J];市政技術(shù);2016年06期
2 姜仁貴;韓浩;解建倉(cāng);朱記偉;李斌;;變化環(huán)境下城市暴雨洪澇研究進(jìn)展[J];水資源與水工程學(xué)報(bào);2016年03期
3 郭小農(nóng);梁水平;蔣首超;;鋁合金構(gòu)件不銹鋼螺栓連接高溫性能研究綜述[J];建筑鋼結(jié)構(gòu)進(jìn)展;2015年05期
4 向國(guó)宇;;淺析混凝土澆筑過程中的技術(shù)要求[J];科學(xué)咨詢(科技·管理);2015年08期
5 孟祥光;武永新;劉云;;新型懸掛式防洪堤開發(fā)研究[J];水電能源科學(xué);2015年05期
6 胡書鋒;莫小飛;;建筑工程預(yù)埋件施工質(zhì)量控制分析[J];門窗;2014年06期
7 王永軍;;插板式防洪墻在大清河下游西河右堤加固工程中的應(yīng)用[J];海河水利;2013年05期
8 賈貰翔;;預(yù)埋地腳螺栓及預(yù)埋件施工工藝[J];黑龍江科技信息;2013年14期
9 張書強(qiáng);;土建工程施工中預(yù)埋件施工的質(zhì)量控制以及技術(shù)要點(diǎn)[J];經(jīng)營(yíng)管理者;2012年17期
10 辛鈺林;;土建工程施工中預(yù)埋件施工的質(zhì)量控制與技術(shù)要點(diǎn)[J];科技創(chuàng)新導(dǎo)報(bào);2012年10期
相關(guān)會(huì)議論文 前1條
1 邱永展;;淺談工業(yè)建筑中預(yù)埋件施工方法的改進(jìn)措施[A];河南省建筑業(yè)行業(yè)優(yōu)秀論文集(2010)[C];2010年
相關(guān)碩士學(xué)位論文 前2條
1 劉云;新型翻轉(zhuǎn)式鋼結(jié)構(gòu)子堤技術(shù)研究[D];天津大學(xué);2014年
2 皮曉宇;城市防洪系統(tǒng)綜合評(píng)價(jià)研究[D];河海大學(xué);2006年
,本文編號(hào):1965988
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/1965988.html