帷幕灌漿在西藏阿渦奪水庫(kù)大壩基礎(chǔ)防滲處理中的應(yīng)用

發(fā)布時(shí)間:2018-04-11 05:41

  本文選題:粘土心墻 + 堆石壩。 參考:《吉林大學(xué)》2014年碩士論文


【摘要】:阿渦奪水庫(kù)位于西藏自治區(qū)隆子縣境內(nèi),隆子河左岸支流。大壩壩基存在及其復(fù)雜特殊的地質(zhì)條件,其壩基巖層順河向、傾角陡、有著極為發(fā)育的張開性節(jié)理裂隙,產(chǎn)狀多變,且風(fēng)化破碎帶埋深較大[1];谝陨峡陀^因素,為滿足下游灌溉需要,結(jié)合實(shí)際滲水情況,先后兩次對(duì)大壩進(jìn)行帷幕灌漿。由于其復(fù)雜地質(zhì)條件2003年的第一期帷幕灌漿并未取得良好的防滲效果。本文將重點(diǎn)解析后期的補(bǔ)強(qiáng)帷幕灌漿階段。經(jīng)過多次試驗(yàn)研究與實(shí)地考察,最終確定了“以堵為主,堵灌結(jié)合”的可控補(bǔ)灌基本施工方案及其對(duì)該類型地質(zhì)條件的作用效果。根據(jù)實(shí)地情況,參照現(xiàn)行的水利水電相關(guān)規(guī)范,在施工方案中采用了在國(guó)際上較為先進(jìn)灌漿理念和GIN灌漿法。2007年5月在大壩左壩肩進(jìn)行了試現(xiàn)場(chǎng)補(bǔ)強(qiáng)灌漿試驗(yàn),取得了不錯(cuò)的效果。之后又先后進(jìn)行了主河床段、左岸山體、右岸平硐的帷幕補(bǔ)強(qiáng)灌漿和副帷幕補(bǔ)強(qiáng)灌漿,并對(duì)右壩肩采用高壓旋噴灌漿和針對(duì)輸水洞的“密封圈”帷幕灌漿等主要工作。經(jīng)過了歷時(shí)三年的努力整個(gè)大壩基礎(chǔ)防滲補(bǔ)強(qiáng)工程基本結(jié)束。最終檢查孔取芯率90%以上,RQD值為15~50%,巖體節(jié)理裂隙發(fā)育,節(jié)理多數(shù)張開,表面見鐵錳質(zhì)浸染,水泥結(jié)石充填于節(jié)理裂隙中,孔壁穩(wěn)固。主河床段及右岸平洞部位檢查孔壓水透水率97%以上孔段小于10Lu,,為合格檢查孔。個(gè)別孔段出現(xiàn)的稍大于10Lu的情況,在其兩側(cè)補(bǔ)充檢查,補(bǔ)充孔檢查結(jié)果為,透水率小于10Lu,說明該部位透水率稍高為極個(gè)別孤立現(xiàn)象,并不存在集中滲漏通道。[2]最終制定的補(bǔ)強(qiáng)帷幕灌漿設(shè)計(jì)方案在阿渦奪水庫(kù)大壩壩基防滲處理施工中起到了很好的效果。 本次補(bǔ)強(qiáng)帷幕灌漿在阿渦奪水庫(kù)防滲工作中的成功應(yīng)用滿足了水庫(kù)下游藏民灌溉取水需要,也為本地區(qū)或類似地質(zhì)條件的水利工程基礎(chǔ)防滲處理提供了參考依據(jù)。
[Abstract]:Avoudou Reservoir is located in Longzi County, Tibet Autonomous region, the left bank of the Longzi River tributaries.The dam foundation exists and its complex special geological conditions. The rock layer of the dam foundation is along the river direction, steep dip, has extremely developed open joint fissure, the occurrence is changeable, and the weathering broken zone buries the depth is big [1].Based on the above objective factors, in order to meet the demand of downstream irrigation, combined with the actual seepage situation, the curtain grouting of the dam was carried out twice in succession.Because of its complicated geological conditions, the first stage of curtain grouting in 2003 did not achieve good seepage control effect.This paper will focus on the later stage of reinforcement curtain grouting stage.After many experiments and field investigations, the basic construction scheme of controlled supplementary irrigation and its effect on this type of geological conditions have been determined, which is based on plugging and combining plugging and irrigation.According to the actual situation and referring to the relevant codes of water conservancy and hydropower, the advanced grouting concept and GIN grouting method are adopted in the construction scheme. In May 2007, the site reinforcement grouting test was carried out on the left abutment of the dam.Good results have been achieved.After that, the curtain reinforcement grouting and the auxiliary curtain reinforcement grouting of the main river bed section, the left bank mountain body, the right bank adit and the right dam abutment were carried out successively, and the main work such as the high pressure rotary grouting and the "sealing ring" curtain grouting for the water conveyance tunnel were carried out.After three years of efforts, the whole dam foundation seepage reinforcement project is basically over.At last, the RQD value of 90% or more holes is 15 ~ 50, the joints of rock mass are developed, the majority of joints are open, the surface is stained with iron and manganese, the cement stone is filled in the joint fissure, and the wall of the hole is firm.The hole pressure and water permeability of the main river bed section and the right bank of the flat hole are less than 10 Lu. it is qualified to check the hole.In the case of a little larger than 10Lu in some pore segments, the supplementary inspection on both sides of the hole shows that the water permeability is less than 10 Lu. which indicates that the high permeability of this part is a very isolated phenomenon.There is no centralized seepage channel. [2] the final design scheme of reinforcement curtain grouting has played a very good role in the seepage control construction of the dam foundation of the Awangzhao reservoir.The successful application of the reinforcement curtain grouting in the impervious work of the Awangdou Reservoir meets the needs of the reservoir downstream Tibetans for irrigation and water intake, and also provides a reference basis for the basic seepage prevention treatment of water conservancy projects in this area or similar geological conditions.
【學(xué)位授予單位】:吉林大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TV543.5

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 姚明輝,李焰;三峽大壩帷幕灌漿特殊情況處理[J];紅水河;2003年04期

2 李英杰;;帷幕灌漿頻率及其累計(jì)曲線圖繪制實(shí)例[J];工程地質(zhì)計(jì)算機(jī)應(yīng)用;2003年03期

3 王貴生,董桂華;巖體裂隙對(duì)帷幕灌漿的影響[J];東北水利水電;2004年05期

4 周彩貴,曹必正;天生橋水庫(kù)山體防滲底層帷幕灌漿設(shè)計(jì)優(yōu)化[J];西部探礦工程;2004年07期

5 宋玉國(guó);何小松;強(qiáng)萬毅;;溶巖地區(qū)大范圍串通段高壓帷幕灌漿的施工探討[J];地質(zhì)裝備;2005年04期

6 侯錦;陳雁鴻;李磊;;紫坪鋪水利樞紐工程深孔帷幕灌漿及特殊情況處理[J];探礦工程(巖土鉆掘工程);2005年S1期

7 蔣玉水,趙慶貴;帷幕灌漿技術(shù)在天平湖改建工程中的應(yīng)用[J];山東水利;2005年03期

8 鄭國(guó)萍,黃少梅;特殊地質(zhì)條件下的帷幕灌漿施工[J];西部探礦工程;2005年06期

9 姚惠麗;;大壩基巖帷幕灌漿技術(shù)的應(yīng)用[J];中國(guó)西部科技;2006年01期

10 徐慶偉;;紫坪鋪水利樞紐工程帷幕灌漿施工[J];四川水力發(fā)電;2006年01期

相關(guān)會(huì)議論文 前10條

1 張正武;;居甫渡水電站帷幕灌漿施工方案改進(jìn)及技術(shù)應(yīng)用[A];貴州省巖石力學(xué)與工程學(xué)會(huì)2010年學(xué)術(shù)年會(huì)論文集[C];2010年

2 童勝利;周勝成;;樂灘水電站Ⅰ標(biāo)工程的帷幕灌漿施工[A];第三屆廣西青年學(xué)術(shù)年會(huì)論文集(自然科學(xué)篇)[C];2004年

3 李占華;張德順;高占魁;;淺談帷幕灌漿的施工方法[A];山東水利學(xué)會(huì)第十屆優(yōu)秀學(xué)術(shù)論文集[C];2005年

4 侯錦;陳雁鴻;李磊;;紫坪鋪水利樞紐工程深孔帷幕灌漿及特殊情況處理[A];第十三屆全國(guó)探礦工程(巖土鉆掘工程)學(xué)術(shù)研討會(huì)論文專輯[C];2005年

5 宋玉國(guó);何小松;;溶巖地區(qū)大范圍串通段高壓帷幕灌漿的施工探討[A];第八次水利水電地基與基礎(chǔ)工程學(xué)術(shù)會(huì)議論文集[C];2006年

6 趙小毛;傅題善;閆德強(qiáng);;長(zhǎng)江三峽二期工程帷幕灌漿施工特殊情況原因分析及處理措施[A];山東水利科技論壇2006[C];2006年

7 馬善才;;長(zhǎng)江三峽水利樞紐二期廠壩工程帷幕灌漿設(shè)計(jì)與施工概要[A];2002年水利水電地基與基礎(chǔ)工程學(xué)術(shù)會(huì)議論文集[C];2002年

8 代云;;隔河巖工程高壓帷幕灌漿施工及質(zhì)量控制[A];'98水利水電地基與基礎(chǔ)工程學(xué)術(shù)交流會(huì)論文集[C];1998年

9 馮輝;鄭文華;;托口紅層巖溶地基常規(guī)帷幕灌漿施工技術(shù)研究[A];2013水利水電地基與基礎(chǔ)工程技術(shù)——中國(guó)水利學(xué)會(huì)地基與基礎(chǔ)工程專業(yè)委員會(huì)第12次全國(guó)學(xué)術(shù)會(huì)議論文集[C];2013年

10 仇道健;;小浪底4號(hào)灌漿洞帷幕灌漿施工質(zhì)量控制措施[A];巖土鉆掘技術(shù)在資源、環(huán)境和工程建設(shè)中的應(yīng)用與發(fā)展學(xué)術(shù)論文集[C];2001年

相關(guān)重要報(bào)紙文章 前2條

1 本報(bào)通訊員;溪洛渡水電站開始帷幕灌漿[N];涼山日?qǐng)?bào)(漢);2010年

2 曹興山 (作者系甘肅省地礦局水勘院高工);壩基防滲處理中的帷幕灌漿法[N];地質(zhì)勘查導(dǎo)報(bào);2007年

相關(guān)博士學(xué)位論文 前1條

1 ABDULHAKIM GHALEB HASSAN AL-KHULAIDI(哈桑);土石壩帷幕灌漿技術(shù)及數(shù)值模擬[D];吉林大學(xué);2013年

相關(guān)碩士學(xué)位論文 前7條

1 韓二品;新工藝帷幕灌漿的施工管理與綜合評(píng)價(jià)研究[D];長(zhǎng)沙理工大學(xué);2013年

2 唐平;深孔帷幕灌漿技術(shù)參數(shù)研究[D];中國(guó)地質(zhì)大學(xué);2010年

3 劉三虎;巖溶地區(qū)帷幕灌漿研究[D];吉林大學(xué);2004年

4 李鵬;大壩心墻基礎(chǔ)先帷幕灌漿再爆破開挖施工方法的研究[D];西安理工大學(xué);2007年

5 高祖純;巖溶地區(qū)高壓帷幕灌漿試驗(yàn)研究[D];四川大學(xué);2003年

6 姜楠;帷幕灌漿在西藏阿渦奪水庫(kù)大壩基礎(chǔ)防滲處理中的應(yīng)用[D];吉林大學(xué);2014年

7 楊紹平;紫坪鋪水庫(kù)廢棄煤洞防滲灌漿施工技術(shù)研究[D];重慶大學(xué);2008年



本文編號(hào):1734691

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/1734691.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶a1d4b***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com