納米比亞LNG項目高樁墩臺結構實體單元與殼單元建模分析
發(fā)布時間:2018-03-30 23:37
本文選題:高樁墩臺 切入點:實體單元 出處:《施工技術》2017年S1期
【摘要】:實際工程中,對于墩臺與樁基組成的復合結構,有限元分析方法是采用三維實體模擬墩臺結構,采用框架單元模擬樁基結構。這兩種結構單元的節(jié)點自由度不同,因此在兩種單元交接節(jié)點處需要做特殊處理,以便達到變形協(xié)調的效果。殼單元與框架單元具有相同的節(jié)點自由度。采用SAP2000軟件,結合納米比亞LNG項目,綜合分析比較厚殼單元與實體單元在墩臺模型中的計算結果,顯示采用厚殼單元能在滿足工程精度范圍內代替實體建模,同時能有效提高工程技術人員的建模效率。
[Abstract]:In the practical engineering, the finite element analysis method is used to simulate the pier and abutment structure and the frame element to simulate the pile foundation structure for the composite structure composed of pier and pile foundation.The joint degrees of freedom of the two structural elements are different, so special treatment is needed at the junction of the two elements in order to achieve the effect of deformation coordination.The shell element has the same degree of freedom as the frame element.SAP2000 software and Namibia LNG project are used to analyze and compare the calculation results of thick shell element and solid element in pier and abutment model. The results show that thick shell element can replace solid modeling in the range of engineering accuracy.At the same time, it can effectively improve the modeling efficiency of engineers and technicians.
【作者單位】: 中交第四航務工程勘察設計院有限公司;
【分類號】:U656.1
【相似文獻】
相關期刊論文 前10條
1 黃臘貴 ,楊弦;我國第一座大型高樁伸臂式橋吊碼頭通過驗收[J];水運工程;1986年12期
2 謝耀峰;大變位水平承載高樁性狀的研究[J];土木工程學報;2000年04期
3 王遠宏;楊鵬;;高樁梁板碼頭升級改造可行性分析——以件雜碼頭升級為舾裝碼頭為例[J];中國水運(下半月);2009年02期
4 蔣倜軍;;某高樁梁板碼頭結構設計分析[J];中國水運(下半月);2009年09期
5 李高陽;陳大可;錢正委;朱廣安;;高樁梁板碼頭結構設計分析[J];中國水運(下半月);2011年07期
6 董海明;李強;;碼頭高樁的豎向振動特性與應用[J];中國水運(下半月);2011年09期
7 喬保娟;劉天蘋;李世海;林青;侯岳峰;;高樁墩臺樁土共同作用對結構內力的影響[J];水運工程;2011年08期
8 陳U,
本文編號:1688195
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/1688195.html
最近更新
教材專著