鋼護(hù)筒鋼筋混凝土樁大水位差深水碼頭結(jié)構(gòu)力學(xué)性能試驗(yàn)研究
本文選題:鋼護(hù)筒鋼筋混凝土樁 切入點(diǎn):試驗(yàn)研究 出處:《重慶交通大學(xué)》2014年碩士論文 論文類型:學(xué)位論文
【摘要】:本文結(jié)合“重慶市重大科技專項(xiàng)(交通基礎(chǔ)設(shè)施建設(shè))——重慶港大水位差深水碼頭設(shè)計(jì)、建設(shè)關(guān)鍵技術(shù)攻關(guān)與應(yīng)用”研究項(xiàng)目,依托重慶果園港碼頭結(jié)構(gòu)二期工程,開(kāi)展了鋼護(hù)筒鋼筋混凝土樁大水位差深水碼頭結(jié)構(gòu)力學(xué)性能試驗(yàn)研究和數(shù)值模擬研究。主要的研究?jī)?nèi)容和相關(guān)結(jié)論有: ①結(jié)合實(shí)際工程,完成了模型設(shè)計(jì),包括模型材料的確定、材料參數(shù)的確定、模型材料的換算、模型的制作、測(cè)點(diǎn)的布置及加載的設(shè)計(jì),并利用數(shù)學(xué)編程軟件Matlab對(duì)大量試驗(yàn)數(shù)據(jù)進(jìn)行了提取及整理。 ②根據(jù)試驗(yàn)?zāi)P?運(yùn)用有限元軟件Ansys分別建立了考慮鋼護(hù)筒和鋼筋混凝土樁接觸的簡(jiǎn)化實(shí)體單元模型,以及未考慮鋼護(hù)筒和鋼筋混凝土樁接觸的梁?jiǎn)卧P。?duì)比分析了兩種建模方法的差異性。結(jié)合試驗(yàn)測(cè)試數(shù)據(jù)對(duì)比可知,簡(jiǎn)化實(shí)體模型和試驗(yàn)數(shù)據(jù)吻合度較好,主要是由于實(shí)體模型能較真實(shí)的反映復(fù)合材料各自的受力特點(diǎn)、鋼構(gòu)件焊接點(diǎn)剛度特征和截面的不規(guī)則性,但也及易受焊接截面不規(guī)則性和集中荷載引起的應(yīng)力集中的影響。 ③運(yùn)用簡(jiǎn)化實(shí)體模型的建模方法建立了原型結(jié)構(gòu)的數(shù)值模型,開(kāi)展了原型和模型的對(duì)比分析,完成了模型到原型的推算。并分析了同一豎向荷載或水平荷載作用下最不利排架中樁基的力學(xué)特性,以及不同豎向荷載或橫向荷載作用下鋼筋混凝土樁、鋼橫撐、鋼靠船立柱和鋼前撐的力學(xué)特性。明確了單一荷載作用下結(jié)構(gòu)的薄弱環(huán)節(jié)及各構(gòu)件最不利的關(guān)鍵點(diǎn),為分析組合效應(yīng)的力學(xué)機(jī)理提供了依據(jù),也為新型碼頭結(jié)構(gòu)的優(yōu)化提供了參考。 ④鋼護(hù)筒鋼筋混凝土樁在單一豎向荷載或橫向荷載作用下,從樁頂?shù)戒摌?gòu)件焊接點(diǎn),鋼護(hù)筒的等效應(yīng)力值占樁的80%左右。從鋼構(gòu)件焊接點(diǎn)到樁底,當(dāng)豎向荷載作用時(shí),鋼護(hù)筒發(fā)揮的作用逐漸減小,鋼筋混凝土樁逐漸發(fā)揮作用;當(dāng)橫向荷載作用時(shí),樁的岸側(cè)處于最不利狀態(tài),鋼護(hù)筒岸側(cè)的應(yīng)力分布基本呈倒“R”型,此區(qū)段發(fā)揮承力的主要作用,鋼筋混凝土樁也逐漸發(fā)揮作用。
[Abstract]:Based on the research project of "Chongqing Major Science and Technology Project (Traffic Infrastructure Construction-Deepwater Wharf Design, key Technology Construction and Application of Chongqing University Water level difference", this paper relies on Chongqing Orchard Port Wharf structure Phase II Project. The experimental study and numerical simulation study on the structural mechanical properties of steel-protected reinforced concrete piles with large water level difference deep water wharf are carried out. The main research contents and relevant conclusions are as follows:. The main contents are as follows: 1. The model design is completed, including the determination of the model material, the determination of the material parameters, the conversion of the model material, the making of the model, the layout of the measuring points and the design of the loading. A large number of experimental data are extracted and sorted by mathematical programming software Matlab. (2) based on the test model, a simplified solid element model considering the contact between steel retaining cylinder and reinforced concrete pile is established by using finite element software Ansys, respectively. And the beam element model without considering the contact between steel retaining tube and reinforced concrete pile. The differences between the two modeling methods are compared and analyzed. Combined with the test data, it can be seen that the simplified solid model is in good agreement with the test data. It is mainly due to the fact that the solid model can truly reflect the stress characteristics of composite materials, the stiffness characteristics of welded joints and the irregularity of the sections of steel members, but it is also easy to be affected by the stress concentration caused by the irregularity of welding sections and the concentrated loads. (3) the numerical model of prototype structure is established by using the modeling method of simplified entity model, and the comparative analysis of prototype and model is carried out. The calculation from the model to the prototype is completed, and the mechanical properties of pile foundation in the most unfavorable bent frame under the same vertical load or horizontal load are analyzed, as well as the reinforced concrete pile and steel transverse brace under different vertical or transverse loads. The mechanical properties of steel berthing column and steel front brace are defined. The weak links of the structure under single load and the most unfavorable key points of each member are identified, which provides a basis for analyzing the mechanical mechanism of the combined effect. It also provides a reference for the optimization of the new wharf structure. (4) under the action of single vertical load or transverse load, the equal effect force value of steel retaining cylinder is about 80% of the pile from the top of the pile to the welded joint of the steel member, and from the welding point of the steel member to the bottom of the pile, when the vertical load is applied, The function of steel retaining tube decreases gradually, and that of reinforced concrete pile gradually exerts its function, when the lateral load is acted on, the bank side of the pile is in the most disadvantageous state, and the stress distribution of the bank side of the steel guard tube is basically inverted "R" type, and this section plays the main role of bearing force. Reinforced concrete piles also gradually play a role.
【學(xué)位授予單位】:重慶交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:U656.1
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 高紀(jì)兵,何平,何官健,柏爭(zhēng);蘇通大橋北索塔墩大直徑超長(zhǎng)鋼護(hù)筒施沉工藝[J];施工技術(shù);2005年S1期
2 崔雪梅;吳澤和;;大直徑鋼護(hù)筒下沉施工設(shè)備及其應(yīng)用[J];橋梁建設(shè);2006年S1期
3 潘江波;陳正錦;寧英杰;;鋼護(hù)筒施工質(zhì)量問(wèn)題原因分析和處理辦法[J];交通標(biāo)準(zhǔn)化;2009年11期
4 韋相云;陳明;;深水樁基鋼護(hù)筒的檢測(cè)和鉆孔問(wèn)題處理[J];青海交通科技;2010年S1期
5 王凱;;鉆孔灌注樁鋼護(hù)筒振沉施工工藝[J];安徽建筑;2010年04期
6 陳玲;穆保崗;汪梅;陳力;;考慮鋼護(hù)筒效應(yīng)變截面樁豎向承載力研究[J];江蘇建筑;2010年04期
7 王富頡;謝研;江錫華;;φ4.1m超大直徑厚壁鋼護(hù)筒制作[J];橋梁建設(shè);2010年S1期
8 蔡志堅(jiān);呂為昱;謝研;;φ4.1m超大直徑鋼護(hù)筒插打施工技術(shù)[J];橋梁建設(shè);2010年S1期
9 謝建花;寧艷玲;;椒江二橋鋼護(hù)筒平臺(tái)施工技術(shù)[J];城市道橋與防洪;2011年06期
10 自杰;;椒江二橋主塔樁基鋼護(hù)筒施沉技術(shù)[J];城市道橋與防洪;2011年08期
相關(guān)會(huì)議論文 前10條
1 顧元威;;海上成孔鋼護(hù)筒的優(yōu)化設(shè)計(jì)[A];第十四屆全國(guó)探礦工程(巖土鉆掘工程)學(xué)術(shù)研討會(huì)論文集[C];2007年
2 劉宇峰;黃國(guó)忠;賴學(xué)海;鄭敏;;檳城二橋主橋鋼護(hù)筒施工技術(shù)[A];第四屆全國(guó)鋼結(jié)構(gòu)工程技術(shù)交流會(huì)論文集[C];2012年
3 鄭海濤;張琦;王建勛;;跨海大橋鋼護(hù)筒沉放施工工藝研究[A];第二屆全國(guó)地下、水下工程技術(shù)交流會(huì)論文集[C];2011年
4 譚清明;吳湘明;夏雨成;;深水大流速河流中鋼護(hù)筒的埋設(shè)技術(shù)[A];二○○○年湖北省橋梁學(xué)術(shù)討論會(huì)論文集(上冊(cè))[C];2000年
5 王君;歐陽(yáng)效勇;張先武;吳正安;;武漢軍山大橋主5號(hào)墩鉆孔樁鋼護(hù)筒定位架設(shè)計(jì)[A];中國(guó)公路學(xué)會(huì)橋梁和結(jié)構(gòu)工程學(xué)會(huì)一九九九年橋梁學(xué)術(shù)討論會(huì)論文集[C];1999年
6 丁飛;劉圣偉;徐群;;軍山大橋主6#墩鋼護(hù)筒定位架制安技術(shù)[A];二○○○年湖北省橋梁學(xué)術(shù)討論會(huì)論文集(上冊(cè))[C];2000年
7 李其修;丁煥林;;丹江口二橋水下切割施工[A];救撈專業(yè)委員會(huì)2004年學(xué)術(shù)交流會(huì)論文集[C];2004年
8 王君;任回興;張先武;吳正安;;軍山大橋主5~#墩鉆孔樁鋼護(hù)筒定位架設(shè)計(jì)[A];二○○○年湖北省橋梁學(xué)術(shù)討論會(huì)論文集(上冊(cè))[C];2000年
9 李洪松;曹志毛;;城市橋梁樁基利用鋼護(hù)筒跟進(jìn)穿透流砂層施工技術(shù)[A];2012年全國(guó)橋梁技術(shù)交流會(huì)論文集[C];2012年
10 譚晶輝;;鋼護(hù)筒加固技術(shù)在盾構(gòu)接收井中的應(yīng)用[A];2014中國(guó)城市地下空間開(kāi)發(fā)高峰論壇論文集[C];2014年
相關(guān)重要報(bào)紙文章 前10條
1 曾正賢 劉志強(qiáng);虎口拔牙[N];中國(guó)鐵道建筑報(bào);2008年
2 本報(bào)記者 向杰;張鴻:“我喜歡這種挑戰(zhàn)”[N];科技日?qǐng)?bào);2007年
3 駐浙記者 萬(wàn)潤(rùn)龍 蔣萍 通訊員 莫云;嘉興一鉆井工被困海底逾60小時(shí)[N];文匯報(bào);2010年
4 記者 岳德亮;東海海底救生記[N];新華每日電訊;2010年
5 楊健;科研攻關(guān)在蘇通大橋上[N];解放日?qǐng)?bào);2008年
6 通訊員 張佳郁 劉雙喜 郭永偉 席強(qiáng) 黃杰;挖潛增效各有實(shí)招[N];中國(guó)交通報(bào);2010年
7 本報(bào)記者 徐小杰 通訊員 陳宗興;閩侯:扎實(shí)推進(jìn)項(xiàng)目建設(shè)[N];福州日?qǐng)?bào);2011年
8 本報(bào)記者 閻友華 特約通訊員 陳同堯 朱麗;沖擊世界紀(jì)錄[N];中國(guó)經(jīng)濟(jì)導(dǎo)報(bào);2005年
9 本報(bào)記者 羅京;生死關(guān)頭 坦然應(yīng)對(duì)[N];長(zhǎng)江日?qǐng)?bào);2010年
10 通訊員 余中國(guó);杭州江東大橋提前完成主棧橋施工任務(wù)[N];人民鐵道;2006年
相關(guān)碩士學(xué)位論文 前7條
1 夏熙;大水位差碼頭鋼護(hù)筒與鋼筋混凝土樁的水平受力特性分析[D];重慶交通大學(xué);2014年
2 于黎;鋼護(hù)筒鋼筋混凝土樁大水位差深水碼頭結(jié)構(gòu)力學(xué)性能試驗(yàn)研究[D];重慶交通大學(xué);2014年
3 黃茂生;深厚軟土地基上沉拔鋼護(hù)筒機(jī)理研究[D];北京交通大學(xué);2008年
4 李維洲;跨海大橋大型深水基礎(chǔ)施工技術(shù)研究[D];長(zhǎng)安大學(xué);2008年
5 胡靜;大直徑鉆孔灌注樁卵石層施工技術(shù)研究[D];河北工程大學(xué);2013年
6 李泉源;基于鋼護(hù)筒的鋼筋混凝土樁大水位差碼頭橫向排架可靠度分析[D];重慶交通大學(xué);2014年
7 萬(wàn)朝棟;增建襄渝Ⅱ線鐵路七里溝大橋深水基礎(chǔ)施工技術(shù)與管理[D];天津大學(xué);2012年
,本文編號(hào):1642900
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/1642900.html