【摘要】:對浯溪口水利樞紐工程碾壓混凝土重力壩混凝土分區(qū)設計方案、施工階段遇到的難題及其處理措施進行了總結(jié)和研究,結(jié)果表明該工程混凝土壩分區(qū)設計與施工方案大大減少了混凝土膠凝材料用量,提高了施工機械化程度,加快了施工進度,同時降低了工程造價,在保證工程質(zhì)量安全的同時取得了較明顯的經(jīng)濟效益,可為類似工程混凝土分區(qū)設計與施工提供參考。
[Abstract]:Partition design of roller compacted concrete gravity dam of WUXIKOU hydro project construction phase of concrete, problems encountered and treatment measures were summarized and studied, the result showed that the engineering design and construction of concrete dam zoning scheme greatly reduces the amount of cementitious materials of concrete, improve the degree of mechanization construction, accelerate the construction schedule, and reduce the the cost of the project, to ensure project quality and safety and achieved obvious economic benefits, which can provide reference for the design and construction of concrete partition of similar projects.
【作者單位】: 江西省水利規(guī)劃設計研究院;南昌大學建筑工程學院;
【基金】:江西省水利科技計劃項目(KT201533)
【分類號】:TV642
【正文快照】: 0引言據(jù)不完全統(tǒng)計,目前碾壓混凝土重力壩(RCC)在國內(nèi)外迅速發(fā)展[1-11],世界上20多個國家已經(jīng)修建了200多座RCC壩,分布在寒帶、熱帶的各種氣候環(huán)境之中。其中第1座RCC壩是美國1982年建成的壩高52 m的Willow Creek重力壩,在建的最高的碾壓混凝土重力壩為中國龍灘大壩[5-6],第一
【相似文獻】
相關期刊論文 前8條
1 于海濤;;某遺址防火分區(qū)設計可行性論證[J];消防科學與技術(shù);2011年04期
2 彭連臣;;建筑防火分區(qū)設計探析[J];工程建設與設計;2010年02期
3 任宏偉;;建筑防火分區(qū)設計中的若干問題探析[J];新西部(下半月);2010年04期
4 董愛民;;淺析建筑防火分區(qū)設計的要點[J];科技資訊;2013年22期
5 鄭慧穎;;建筑防火分區(qū)設計探析[J];科技創(chuàng)新與應用;2013年08期
6 何李源;;AP1000核電機組輻射分區(qū)設計調(diào)整[J];輻射防護通訊;2013年02期
7 黃硯玲,韓旭里,陳雄飛,郁可,劉愛萍;大型數(shù)據(jù)庫INFORMIX的分區(qū)設計技術(shù)[J];山東建材學院學報;1998年04期
8 ;[J];;年期
,本文編號:1407552
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/1407552.html
最近更新
教材專著