周期注水在薩北開發(fā)區(qū)水驅(qū)中的研究與應(yīng)用
[Abstract]:The research and application of the method of water dynamics have been strengthened for the development of the high water cut stage in the Sanbei Development Zone, and the better effect has been achieved in practice. The period water injection is a kind of unstable dynamic change in the oil layer by changing the water injection time and the way of the injection well, and the development effect of the oil field is improved. At present, the Sabei Development Zone of Daqing Oil Field has entered the later stage of the high water cut, and the water rise speed of the oil field is slowed down, but with the gradual decrease of the recoverable reserves, the liquid oil is faster than the rising speed, and the conventional oil well measures are getting worse and worse, and the potential for excavating the oil well is not as good as the initial stage. And the underground wave and the volume difficulty of the water injection of the water injection well are further improved. Therefore, in this situation, how to further control the water-bearing rise, increase the recoverable reserves, and delay the decline of the output, it is the most important to improve the development effect at the present stage and to improve the economic benefit, and the periodic water injection is proved to be a very economical and effective means in this stage. The three development layers of the Sabei Development Zone are the oil-bearing composition of the central part of the Daqing Changs, and the large-scale river sand is developed in the high oil layer and the high oil layer. The main oil layer and the part of the oil layer of the Sartu are well connected, the thickness is large, the main oil layer is the main oil layer, and the rest are non-main oil. a layer that is so classified as to facilitate the modulation in development The three sets of oil layers mainly belong to the large-scale, leaf-type delta deposition of the sedimentary system in the northern Songliao basin, and some of them belong to the large-scale river sedimentation in the downstream of the flood plain. The structure of the whole area is more stable, and the covering area of the lake water area is wide The mechanism of the period water injection is to change the working system and working time of the water injection well, to form an additional pressure difference between the longitudinal upper sections of the heterogeneous oil reservoir and to generate the follow-up The addition of the blowby can play a role in the longitudinal flooding of the uniform oil layer, which is beneficial to the improvement of the development effect, and the higher the permeability and the saturation difference between the lower section of the stable condition, the more the contradiction is, the effect of the periodic water injection the more obvious the difference in permeability and saturation, the more the additional pressure difference generated between the layers, the more the amount of water that the good layer can penetrate through the good layer to the differential layer during one cycle of the periodic water injection, and the amount of the reverse flow The more it is, it is reflected in the indicator that the rising speed of the water is slowing down and even the water content is down, reducing the inefficient and inefficient cycle, improving the opening, The results show that the most reasonable period is obtained for the different development modes of pure oil and transition zone. time and mode. The stop-layer continuous well mode, in particular to stop the good layer section, maintain or even strengthen the water injection of the differential layer, in fact, the high layer is subjected to periodic water injection, the residual oil is driven to ooze, and the poor oil layer improves the water absorption profile, and the original water-absorbing layer section starts to absorb water and the interlayer spears The shield is relieved to control the rate of water rise and to reduce The effect is not effective. There are some differences in the development of the pure oil region and the transition zone, especially the four bands in the transition zone. The difference is greater. The method of the cyclic water injection in the pure oil area and the way on the corresponding horizon in the four zones of the transition zone The method is different. Through the combination of the experiment and the numerical simulation, the reasonable period, the water injection pressure and other technical parameter limits are obtained, and the recovery rate of the block is improved and the content of the water is reduced. The paper concludes that the time of the water injection in the low water-bearing period of the oil field should be controlled within 3 months. In the medium-high water-cut period, it should be controlled to be the most suitable for about 40 days within 2 months. In the practical application, it is found that for the water-bearing In the case of high transition zone, the half-cycle of the continuous injection method of the stop layer can be lengthened appropriately, and the effect on oil production is gradually obvious when the effect on oil production is more than 60 days, and the whole well is controlled at 50 The effect is best within the day. By adopting the method of layer-section synchronous period water injection, the oil layer is always filled with water, so that the formation pressure is greatly fluctuated, so that the development condition of the oil field is stable, and the water drive development is improved in the later stage of the high water cut. The effective method of the effect is as follows: the selection of the periodic water injection mode and the determination of the working system, and the reasonable combination of the geological characteristics and the development condition of the block, taking full consideration of the contradiction in the longitudinal upper plane, combining the development condition of the oil layer, the corresponding relation between the injection and production, the layer, In the present development condition, the oil field should make full use of the existing layer and well network, control the pressure field through periodic water injection, increase the utilization rate of the injected water, and make the retention state The oil layer modification measures should be incorporated in the pressure field adjustment, and all kinds of oil layer modification measures should be improved in all directions.
【學(xué)位授予單位】:吉林大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TE357.6
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 計(jì)秉玉,呂志國(guó);影響周期注水提高采收率效果的因素分析[J];大慶石油地質(zhì)與開發(fā);1993年01期
2 高淑明;;應(yīng)用周期注采技術(shù)改善特高含水期開發(fā)效果[J];大慶石油地質(zhì)與開發(fā);2006年S1期
3 李忠榮,邵憲志;大慶長(zhǎng)垣南部油田周期注水的做法及效果[J];大慶石油地質(zhì)與開發(fā);1993年04期
4 高慧英;;大慶油田高壓注水井開關(guān)井周期研究[J];長(zhǎng)江大學(xué)學(xué)報(bào)(自科版);2013年14期
5 宋舜堯;;數(shù)值模擬技術(shù)在周期注水研究中的應(yīng)用[J];化工管理;2015年02期
6 徐巖;楊英;吳寶峰;;薩北開發(fā)區(qū)高含水后期周期注水方法研究[J];內(nèi)蒙古石油化工;2007年12期
7 裴國(guó)平;;周期注水在水驅(qū)開發(fā)中的研究與應(yīng)用[J];中國(guó)石油和化工標(biāo)準(zhǔn)與質(zhì)量;2013年02期
8 姜媛媛;;喇嘛甸油田水下分流河道識(shí)別方法研究[J];中國(guó)石油和化工標(biāo)準(zhǔn)與質(zhì)量;2013年05期
9 黃玲;;周期注水機(jī)理及方式研究[J];內(nèi)蒙古石油化工;2014年16期
10 王爽;;大慶葡萄花油田滲流周期注水應(yīng)用方法研究[J];科技與企業(yè);2015年02期
相關(guān)博士學(xué)位論文 前1條
1 方世躍;改善二次采油效果技術(shù)研究[D];成都理工大學(xué);2010年
本文編號(hào):2509434
本文鏈接:http://sikaile.net/kejilunwen/shiyounenyuanlunwen/2509434.html