上海NEXX第四循環(huán)水場項目風險管理研究

發(fā)布時間:2018-05-24 08:04

  本文選題:風險管理 + 石油化工; 參考:《華東理工大學》2017年碩士論文


【摘要】:大型石油化工循環(huán)水場項目具有規(guī)模大,投資大,工程結構復雜等特點,且涉及專業(yè)眾多,如土建、結構、設備、配管、電氣、儀表、給排水、應力等專業(yè)。項目的順利進行需要各專業(yè)的深度銜接,整個項目的生命周期充滿了各種風險,稍有疏忽,就會出現(xiàn)人員傷亡,項目延期,費用上升等情況,從而使整個項目以及后續(xù)裝置的運行的進度受到極大的影響,因此對此類項目引入項目風險管理,顯得尤為必要。文章以上海NEXX第四循環(huán)水場項目為風險管理研究對象,首先對項目風險管理的理論進行了闡述,通過國內(nèi)外文獻資料的引用,簡要的敘述了目前國內(nèi)外在項目風險管理方面研究或實踐的現(xiàn)狀,然后將風險管理理論運用到上海NEXX第四循環(huán)水場項目中去,針對循環(huán)水場項目的特點,進行了不確定性分析,結合頭腦風暴法,識別出政策風險、經(jīng)濟風險、社會風險、經(jīng)營風險、安全風險、技術風險等七大類風險,通過使用模糊綜合評價法對識別出來的風險進行評估,評估得出風險較大的風險有經(jīng)營風險、安全風險、技術風險等。根據(jù)風險評估的結果采取相應合理的方法如預防、減少、接受、儲備等方式來應對風險,并設置風險監(jiān)控措施對整個項目各個階段進行監(jiān)控。最終將整個循環(huán)水項目的風險控制在合理的范圍內(nèi)。
[Abstract]:The large-scale petrochemical circulating water field project has the characteristics of large scale, large investment, complex engineering structure, and involves many specialties, such as civil engineering, structure, equipment, piping, electrical, instrumentation, water supply and drainage, stress and so on. The smooth running of the project requires the deep convergence of various professions. The whole life cycle of the project is full of various risks. If you neglect it, there will be casualties, project delays, rising costs, and so on. Therefore, it is necessary to introduce project risk management into the project. In this paper, the project of Shanghai NEXX fourth circulating water farm is taken as the research object of risk management. Firstly, the theory of project risk management is expounded, and the reference of domestic and foreign literature is given. This paper briefly describes the current situation of research or practice in project risk management at home and abroad, and then applies the theory of risk management to the project of Shanghai NEXX fourth circulating water field. According to the characteristics of the project, the uncertainty analysis is carried out. Combining the brainstorming method to identify seven kinds of risks, such as policy risk, economic risk, social risk, management risk, safety risk and technical risk, the identified risks are evaluated by using fuzzy comprehensive evaluation method. The assessment shows that there are operational risks, safety risks, technical risks and so on. According to the results of risk assessment, appropriate and reasonable methods, such as prevention, reduction, acceptance, reserve and so on, are adopted to deal with the risks, and risk monitoring measures are set up to monitor the whole project stages. Finally, the risk of the whole circulating water project is controlled within a reasonable range.
【學位授予單位】:華東理工大學
【學位級別】:碩士
【學位授予年份】:2017
【分類號】:TE685

【參考文獻】

相關期刊論文 前10條

1 李昂;;石油化工建設項目風險管理研究[J];建筑與預算;2013年09期

2 劉洪浩;;淺議項目風險管理理論[J];學理論;2011年34期

3 錢淑紅;趙光榮;;淺析化工、石化類建設項目環(huán)境風險評價[J];科技資訊;2011年22期

4 成小江;宋加建;;施工企業(yè)的項目風險控制[J];江蘇建筑;2010年S1期

5 張秀青;曲丹丹;張令戈;孫娜;;石化項目環(huán)境風險評價——以某擬建渣油催化裂解制丙烯等化工原料項目為例[J];安全與環(huán)境工程;2009年04期

6 張俊;;淺析項目風險管理與項目管理[J];黑龍江科技信息;2007年13期

7 穆梅;穆軍;;EPC項目的風險管理[J];國際經(jīng)濟合作;2006年05期

8 武乾;武增海;李慧民;;工程項目風險評價方法研究[J];西安建筑科技大學學報(自然科學版);2006年02期

9 王要武 ,李晨洋;項目風險辨識[J];企業(yè)管理;2005年08期

10 張國興,胡紹蘭;項目風險監(jiān)控研究[J];基建優(yōu)化;2005年03期

,

本文編號:1928308

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/shiyounenyuanlunwen/1928308.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權申明:資料由用戶5870d***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com