基于灰色關(guān)聯(lián)模型的工程勝任力分析
[Abstract]:Since the reform and opening up to the outside world, the state has vigorously developed the construction of engineering infrastructure, and the weak power system is the main content of the current intelligent building trend, so the construction of the weak power project is particularly important. However, in the current weak current engineering, especially in the implementation stage of the project, emergency changes often occur in the weak current system. These changes are often short in time and few in function, which neither affects the design of the main body nor involves the change of the function. Often fine-tuned engineering changes, but such changes still have a close impact on the cost, schedule, and quality of the project. Because of the dependence of weak electric engineering companies on high-tech technology, the application requirements of talents are relatively high. However, due to the limitation of scale, the competency of design positions limits the development of technical talents. It also limits the ability of technical personnel to solve problems. And often deal with emergency changes often rely on high-quality technical personnel to solve. Therefore, this paper introduces the concept of engineering competency model to solve this problem. The idea of this paper is to analyze the relationship between engineering change and competency model, combining with the research and analysis of engineering change solving methods and relevant competency models at home and abroad. The main method to solve the problem of emergency engineering change is to determine the technical talents selected by competency model. The specific method is to analyze the relationship between the feature elements and competency factors of emergency engineering changes by using grey relational analysis. Then construct the engineering competency model to select the technical talents, use the event interview method and questionnaire survey method to construct the model elements of competency, and carry on the weight analysis to these elements, use the analytic hierarchy process to carry on the verification. Then the engineering competency model is obtained, and then the structural equation method is used to verify the model. To return to the actual case, the implementation process and method to solve the emergency change can be worked out, so that the method of solving the engineering emergency change based on the technical talents can be effectively applied in the weak power engineering companies. The significance of this paper is to find an effective way to deal with sudden change events in the construction of weak current engineering. It provides an objective basis for recruitment, training and selection of weak power companies and can establish a suitable training mechanism. In order to improve the efficiency and ability of solving problems in the construction of weak current construction enterprises, a new direction of development has been developed for the technical talents of weak current engineering companies.
【學(xué)位授予單位】:天津大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:TU71
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 姜宏,陳富堅(jiān),趙軍;工程變更及其國(guó)外研究現(xiàn)狀[J];桂林工學(xué)院學(xué)報(bào);2001年02期
2 劉嫦娥;張丹;;工作勝任力研究新視角:一種解釋性方法[J];科學(xué)學(xué)與科學(xué)技術(shù)管理;2009年02期
3 王學(xué)光;;淺談建筑弱電智能化系統(tǒng)工程應(yīng)用[J];科技與企業(yè);2013年05期
4 易思賢;;對(duì)建筑工程項(xiàng)目管理的創(chuàng)新方法探討[J];陜西建筑;2011年04期
5 吳好進(jìn);馬志豪;;ZT公司工程設(shè)計(jì)人員勝任力模型構(gòu)建[J];商;2013年02期
6 李冠軍;;國(guó)外勝任力最新研究成果綜述[J];人力資源管理;2013年02期
7 武剛;林占平;;淺談水電工程施工中的項(xiàng)目管理[J];水利水電工程造價(jià);2011年01期
8 陳民科;基于勝任力的職務(wù)分析及其應(yīng)用[J];人類工效學(xué);2002年01期
9 王重鳴,陳民科;管理勝任力特征分析:結(jié)構(gòu)方程模型檢驗(yàn)[J];心理科學(xué);2002年05期
10 時(shí)勘,王繼承,李超平;企業(yè)高層管理者勝任特征模型評(píng)價(jià)的研究[J];心理學(xué)報(bào);2002年03期
相關(guān)博士學(xué)位論文 前1條
1 徐慧玲;國(guó)際工程總承包項(xiàng)目經(jīng)理勝任力研究[D];中國(guó)礦業(yè)大學(xué)(北京);2010年
本文編號(hào):2452985
本文鏈接:http://sikaile.net/kejilunwen/sgjslw/2452985.html