工程建設(shè)報(bào)建階段進(jìn)度控制研究
發(fā)布時(shí)間:2018-11-01 13:35
【摘要】:隨著我國(guó)經(jīng)濟(jì)建設(shè)的高速發(fā)展,建設(shè)工程類項(xiàng)目如何有效管理,使建設(shè)項(xiàng)目在運(yùn)用新型科學(xué)技術(shù)的前提下,真正做到維護(hù)民生、統(tǒng)一城市規(guī)劃以及自然資源可持續(xù)循環(huán)利用。這些正是國(guó)家和人民群眾所關(guān)心的重大問題。 目前,建設(shè)部對(duì)建筑工程等類似項(xiàng)目頒布了相應(yīng)的管理?xiàng)l例。同時(shí)當(dāng)?shù)卣墙Y(jié)合了當(dāng)?shù)氐木唧w情況,對(duì)建設(shè)工程的各環(huán)節(jié)項(xiàng)目制定出更為細(xì)致的規(guī)定,便于有效地開展工程報(bào)建工作,及時(shí)完成建設(shè)工程前期報(bào)建手續(xù)。其中施工許可證的順利取得正是保證按時(shí)完成建設(shè)工程項(xiàng)目的重要環(huán)節(jié)。 本文通過具體分析研究在建設(shè)工程項(xiàng)目前期報(bào)建階時(shí)段所產(chǎn)生的各種問題,并利用項(xiàng)目管理中工作分解結(jié)構(gòu)、關(guān)鍵路徑法、網(wǎng)絡(luò)圖法等方法,將報(bào)建階段的工作進(jìn)行梳理總結(jié),從而創(chuàng)建出3W模型。 本文創(chuàng)建的3W模型,通過將報(bào)建階段中的具體工作分成三個(gè)方面:設(shè)計(jì)、招標(biāo)、審批工作內(nèi)容,進(jìn)行工作分解,資源分配,項(xiàng)目進(jìn)度安排,得出項(xiàng)目關(guān)鍵路徑。 3W模式的運(yùn)用不僅提高了報(bào)建工作效率,縮短整個(gè)建設(shè)工程項(xiàng)目的時(shí)間,而且能更有效地使用企業(yè)有限的資源,控制整個(gè)項(xiàng)目成本。
[Abstract]:With the rapid development of our country's economic construction, how to manage the construction project effectively so that the construction project can maintain the people's livelihood, unify the urban planning and the sustainable recycling of natural resources under the premise of using the new science and technology. These are the major issues of concern to the state and the masses of the people. At present, the Ministry of Construction of similar projects such as construction promulgated the corresponding regulations. At the same time, the local government has made more detailed regulations on each link of the construction project in combination with the local specific conditions, which is convenient to carry out the project report and construction work effectively, and to complete the construction procedure of the early stage of the construction project in time. The smooth acquisition of construction license is an important link to ensure the timely completion of construction projects. In this paper, through the concrete analysis and study of various problems arising in the pre-construction stage of the construction project, and by using the methods of work breakdown structure, critical path method, network diagram and so on in project management, the paper summarizes the work in the stage of application and construction. Thus the 3W model is created. The 3W model which is created in this paper is divided into three aspects: design, bidding, examination and approval of work content, work decomposition, resource allocation, project schedule arrangement, and get the key path of the project. The application of 3W mode not only improves the efficiency of construction application, shortens the time of the whole construction project, but also effectively uses the limited resources of the enterprise and controls the whole project cost.
【學(xué)位授予單位】:復(fù)旦大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:TU722
本文編號(hào):2304073
[Abstract]:With the rapid development of our country's economic construction, how to manage the construction project effectively so that the construction project can maintain the people's livelihood, unify the urban planning and the sustainable recycling of natural resources under the premise of using the new science and technology. These are the major issues of concern to the state and the masses of the people. At present, the Ministry of Construction of similar projects such as construction promulgated the corresponding regulations. At the same time, the local government has made more detailed regulations on each link of the construction project in combination with the local specific conditions, which is convenient to carry out the project report and construction work effectively, and to complete the construction procedure of the early stage of the construction project in time. The smooth acquisition of construction license is an important link to ensure the timely completion of construction projects. In this paper, through the concrete analysis and study of various problems arising in the pre-construction stage of the construction project, and by using the methods of work breakdown structure, critical path method, network diagram and so on in project management, the paper summarizes the work in the stage of application and construction. Thus the 3W model is created. The 3W model which is created in this paper is divided into three aspects: design, bidding, examination and approval of work content, work decomposition, resource allocation, project schedule arrangement, and get the key path of the project. The application of 3W mode not only improves the efficiency of construction application, shortens the time of the whole construction project, but also effectively uses the limited resources of the enterprise and controls the whole project cost.
【學(xué)位授予單位】:復(fù)旦大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:TU722
【參考文獻(xiàn)】
相關(guān)期刊論文 前5條
1 屠海英;建設(shè)工程項(xiàng)目前期報(bào)建工作理論探討[J];大眾科技;2005年07期
2 胡綺紅;;淺談建筑工程前期報(bào)建工作[J];消費(fèi)導(dǎo)刊;2008年12期
3 王偉前;;工業(yè)企業(yè)規(guī)劃報(bào)建管理創(chuàng)新[J];工業(yè)建筑;2008年S1期
4 胡明東;鄭成德;張奎;朱慶妮;;談房地產(chǎn)項(xiàng)目報(bào)建中的經(jīng)驗(yàn)與體會(huì)[J];建設(shè)科技;2006年07期
5 田系久;;工程項(xiàng)目各階段實(shí)施內(nèi)部控制制度探析[J];財(cái)會(huì)通訊(理財(cái)版);2007年04期
,本文編號(hào):2304073
本文鏈接:http://sikaile.net/kejilunwen/sgjslw/2304073.html
最近更新
教材專著