中—非國(guó)際建設(shè)工程項(xiàng)目中的風(fēng)險(xiǎn)評(píng)價(jià)實(shí)證研究
[Abstract]:Trade between China and Africa has grown in recent years, reaching $198.5 billion in 2012 and estimated at $385 billion in 2015. The African continent is China's most important economic partner (ahead of France and the United States), but Chinese companies, especially those related to construction, are facing a series of management problems in Africa if they do not take appropriate measures. This is likely to pose a serious threat to their future expansion in the African construction market. One of the main problems of international construction project management in China and Africa is risk management. Chinese companies are currently not seriously considering these issues. In this paper, the main risk sources of China-Africa international construction projects are identified through the investigation and interview of China-Africa construction projects. Based on the data obtained from the investigation and analysis, this paper identifies the risks in each stage of the project through empirical research, and analyzes the main risks and risk sources by using the analytic hierarchy process (AHP) method according to the severity and probability of occurrence. Combined with decision support technology (DST) to evaluate the severity of its occurrence. On the basis of risk analysis, this paper puts forward corresponding measures to deal with the risk of major projects, so as to reduce the risks such as the increase of cost and the delay of project delivery in the current China-Africa international construction projects through effective risk management. The results show that during the implementation of SA-ICPs, the lack of investigation on site, environment and organizational culture is one of the biggest risk sources. This paper innovatively proposes different research frameworks and cultural management solutions to fulfill risk management, and applies the framework and scheme to evaluate two project cases. The results show the effectiveness of the research framework and scheme in the risk management of China-Africa International Construction Program. The research in this paper provides reference and help for Chinese contractors and local owners (government) to understand the risk of non-construction project and manage the main risks in the process of project risk assessment according to the results of project risk assessment.
【學(xué)位授予單位】:天津大學(xué)
【學(xué)位級(jí)別】:博士
【學(xué)位授予年份】:2013
【分類號(hào)】:TU71
【共引文獻(xiàn)】
相關(guān)期刊論文 前10條
1 萬(wàn)欣;李啟明;袁競(jìng)峰;;建筑業(yè)交易費(fèi)用測(cè)算及地區(qū)差異的實(shí)證分析[J];東南大學(xué)學(xué)報(bào)(自然科學(xué)版);2013年05期
2 仲謀;郭周明;;中國(guó)企業(yè)海外施工的項(xiàng)目風(fēng)險(xiǎn)識(shí)別——以中鐵建麥加項(xiàng)目為例[J];國(guó)際經(jīng)濟(jì)合作;2014年05期
3 張丹平;楊乃定;劉效廣;;結(jié)構(gòu)性隔離對(duì)NPD項(xiàng)目成功的影響研究[J];管理學(xué)報(bào);2014年07期
4 劉承雨;王繼堯;倪冉;靖培星;;基于模糊數(shù)的煤礦重大危險(xiǎn)源三維風(fēng)險(xiǎn)模型[J];安全與環(huán)境學(xué)報(bào);2014年04期
5 黎藜;劉寶發(fā);;石油項(xiàng)目風(fēng)險(xiǎn)管理研究綜述[J];重慶科技學(xué)院學(xué)報(bào)(社會(huì)科學(xué)版);2014年06期
6 胡京波;歐陽(yáng)桃花;譚振亞;周寧;曾德麟;;以SF民機(jī)轉(zhuǎn)包生產(chǎn)商為核心企業(yè)的復(fù)雜產(chǎn)品創(chuàng)新生態(tài)系統(tǒng)演化研究[J];管理學(xué)報(bào);2014年08期
7 張德華;童紀(jì)新;程書萍;;復(fù)雜工程風(fēng)險(xiǎn)管理體系研究[J];工程經(jīng)濟(jì);2014年11期
8 襲勇;李林;唐利;章宜;;移民項(xiàng)目的低碳經(jīng)濟(jì)評(píng)價(jià)指標(biāo)體系研究[J];華東經(jīng)濟(jì)管理;2013年10期
9 李存金;王俊鵬;;重大科技研發(fā)型項(xiàng)目系統(tǒng)集成虛擬組織模式探討——以人類基因組計(jì)劃為例[J];科技進(jìn)步與對(duì)策;2013年21期
10 徐建中;謝晶;;組織學(xué)習(xí)過(guò)程對(duì)制造企業(yè)國(guó)際化成長(zhǎng)績(jī)效影響[J];哈爾濱工程大學(xué)學(xué)報(bào);2013年11期
相關(guān)會(huì)議論文 前2條
1 毛辛培;豐景春;張可;;建筑業(yè)企業(yè)核心資源的社會(huì)網(wǎng)絡(luò)化模型研究[A];第八屆(2013)中國(guó)管理學(xué)年會(huì)論文集(選編)[C];2013年
2 毛辛培;豐景春;張可;;建筑業(yè)企業(yè)核心資源的社會(huì)網(wǎng)絡(luò)化模型研究[A];第八屆(2013)中國(guó)管理學(xué)年會(huì)——組織行為與人力資源管理分會(huì)場(chǎng)論文集[C];2013年
相關(guān)博士學(xué)位論文 前10條
1 吳仲兵;政府投資代建制項(xiàng)目監(jiān)管體系研究[D];北京交通大學(xué);2013年
2 韓馥冰;高校知識(shí)創(chuàng)新聯(lián)盟及績(jī)效評(píng)價(jià)研究[D];北京交通大學(xué);2013年
3 王帆;地鐵施工安全風(fēng)險(xiǎn)建模及演化研究[D];華中科技大學(xué);2013年
4 肖建英;征地沖突風(fēng)險(xiǎn)管理研究[D];華中科技大學(xué);2013年
5 哈賽;巴基斯坦大型建筑項(xiàng)目風(fēng)險(xiǎn)管理[D];華中科技大學(xué);2013年
6 陳健;基于集成理論的新能源建設(shè)項(xiàng)目群管理方法及應(yīng)用研究[D];華北電力大學(xué);2013年
7 陸龔曙;施工項(xiàng)目群風(fēng)險(xiǎn)元傳遞模型及其信息系統(tǒng)研究[D];華北電力大學(xué);2013年
8 孫德棟;基于網(wǎng)絡(luò)特性分析的時(shí)間費(fèi)用權(quán)衡問(wèn)題研究[D];華北電力大學(xué);2013年
9 陳國(guó)藩;企業(yè)突破性創(chuàng)新風(fēng)險(xiǎn)評(píng)估與動(dòng)態(tài)演化研究[D];中南大學(xué);2013年
10 李明;城鎮(zhèn)排水自動(dòng)監(jiān)測(cè)系統(tǒng)項(xiàng)目風(fēng)險(xiǎn)的生態(tài)化管理模式研究[D];中南大學(xué);2012年
相關(guān)碩士學(xué)位論文 前10條
1 劉緒忠;企業(yè)知識(shí)型員工的MR、SD、SN維度分析及默會(huì)知識(shí)績(jī)效研究[D];山東師范大學(xué);2013年
2 張璐;默會(huì)知識(shí)、學(xué)術(shù)智力與學(xué)習(xí)成績(jī)的關(guān)系研究[D];山東師范大學(xué);2013年
3 呂柏東;幸福隧道工程項(xiàng)目施工管理研究與分析[D];西南交通大學(xué);2013年
4 穆永爽;惠普大連BPO中心知識(shí)管理體系構(gòu)建研究[D];大連理工大學(xué);2012年
5 高萌;基于風(fēng)險(xiǎn)管理角度的國(guó)際工程項(xiàng)目?jī)?nèi)部控制研究[D];首都經(jīng)濟(jì)貿(mào)易大學(xué);2013年
6 董志文;壟茶高速公路建設(shè)項(xiàng)目投融資風(fēng)險(xiǎn)管理研究[D];長(zhǎng)沙理工大學(xué);2013年
7 王聞愷;海上風(fēng)電工程通航風(fēng)險(xiǎn)評(píng)價(jià)及安全保障研究[D];武漢理工大學(xué);2013年
8 王煜;基于投入產(chǎn)出關(guān)系的知識(shí)流與知識(shí)產(chǎn)業(yè)結(jié)構(gòu)優(yōu)化模型[D];西安電子科技大學(xué);2013年
9 王蓉;交通運(yùn)輸建設(shè)項(xiàng)目跟蹤審計(jì)責(zé)權(quán)利模式研究[D];長(zhǎng)沙理工大學(xué);2013年
10 喬艷芬;食品生產(chǎn)企業(yè)供應(yīng)鏈風(fēng)險(xiǎn)管理研究[D];河南理工大學(xué);2012年
本文編號(hào):2222720
本文鏈接:http://sikaile.net/kejilunwen/sgjslw/2222720.html