工程量清單計價模式下的建設(shè)工程評標(biāo)研究
[Abstract]:With the deepening of China's reform and opening up, China's economy has been integrated into the global market, and the domestic market has been internationalized step by step. In order to apply this form urgently, in 2003, our country promulgated the "Construction quantity list valuation Standard" (GB50500-2003). However, as a new measure in the field of cost management, the bill of quantities valuation needs to be matched and reformed in many aspects, and the reform and innovation of bid evaluation system is one of the most important aspects. This paper analyzes in detail the characteristics of the bid evaluation system in our country at present and points out the problems existing in the current bid evaluation system, and emphatically analyzes the main influencing factors of the bid evaluation under the valuation mode of bill of quantities, according to the characteristics of the construction projects in our country. The evaluation index system of construction project is established, which is composed of four index modules: commercial index, technical index, contractor qualification and reputation, and project implementation team, which makes the bid winning condition change from a single price factor to a comprehensive factor. In this paper, the ISM model is used to analyze the sub-system of business index, technical index, contractor qualification and reputation, and the index system of project team, and to establish the adjoining matrix and reachable matrix. Thus, the hierarchical structure digraphs of index factors are obtained. Hierarchical structure digraphs show the division of different levels of index factors and analyze the interaction of index factors with this hierarchy relationship. In this paper, the interrelation of index factors is taken as the input of ANP model, and the evaluation system of bill of quantities in ANP mode is established. On the basis of this system, the unweighted super matrix, weighted super matrix and limit matrix are established. And carries on the consistency test, obtains each index factor weight. The grey correlation matrix is obtained from the grey correlation coefficient by using the network hierarchy grey correlation method, and the weight of the index is added to the calculation of the grey correlation degree. The weight calculation results of ANP are introduced to solve the comprehensive correlation degree, which avoids the defect that the traditional grey correlation analysis method can not take into account the influence degree of the index factors. This paper also analyzes the bidding project of Beijing Gaojing Gas Project B (one towing unit). Through the above research, we can protect the rights and interests of the bidding parties, maintain the normal competition order, and fully embody the principles of openness, fairness and impartiality in bid evaluation.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:TU723.2
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 張靜;李茂清;;由鄰接矩陣求解可達(dá)矩陣的一種改進(jìn)簡便算法[J];電腦知識與技術(shù)(學(xué)術(shù)交流);2007年01期
2 李家俊;張金杰;;工程量清單及計價招投標(biāo)問題的探討[J];工程與建設(shè);2007年03期
3 朱泰英,孫波,陳兆均;基于數(shù)據(jù)包絡(luò)分析的工程建設(shè)項目評標(biāo)方法[J];公路交通技術(shù);2004年02期
4 王成文;李莉;譚忠富;候建英;;輸配分開后供電公司DSM風(fēng)險分析的ISM模型[J];華東電力;2008年01期
5 郭慧娟;;從全面推行工程量清單計價談評標(biāo)[J];建筑;2007年08期
6 曹儀民;李穎;;淺議建設(shè)工程招投標(biāo)評標(biāo)辦法[J];技術(shù)經(jīng)濟(jì)與管理研究;2008年01期
7 杜葵;工程量清單報價與傳統(tǒng)報價模式比較研究[J];建筑經(jīng)濟(jì);2003年01期
8 魏起增;對建筑工程招投標(biāo)及評標(biāo)方法的思考[J];建筑經(jīng)濟(jì);2004年06期
9 鄒偉;;論施工企業(yè)投標(biāo)報價策略與技巧[J];建筑經(jīng)濟(jì);2007年07期
10 羊雅芳;胡君芬;;淺析工程量清單計價在招投標(biāo)中的應(yīng)用[J];建筑經(jīng)濟(jì);2010年02期
本文編號:2124702
本文鏈接:http://sikaile.net/kejilunwen/sgjslw/2124702.html