連云港某置業(yè)廣場(chǎng)施工措施及組織設(shè)計(jì)
本文選題:施工組織設(shè)計(jì) + 進(jìn)度計(jì)劃。 參考:《遼寧科技大學(xué)》2013年碩士論文
【摘要】:本文在查閱了大量施工組織設(shè)計(jì)相關(guān)資料、計(jì)劃文件及相關(guān)合同、設(shè)計(jì)資料及相關(guān)文件、工程的現(xiàn)場(chǎng)資料和相關(guān)的國(guó)家規(guī)范后,以連云港某置業(yè)廣場(chǎng)為研究對(duì)象,綜合了該置業(yè)廣場(chǎng)的各單位工程的特點(diǎn)及相關(guān)資料后,編制了該置業(yè)廣場(chǎng)的單項(xiàng)工程的總施工組織設(shè)計(jì)。對(duì)A、B、C單位工程做出全局性的戰(zhàn)略部署,為各單位工程的施工準(zhǔn)備和物資的保障提供依據(jù)、為單位工程的建設(shè)計(jì)劃提供依據(jù),并對(duì)其施工作業(yè)提供科學(xué)合理的方案和實(shí)施步驟,并為總的施工部署提供施工方案的可行性和合理性提供依據(jù)。編制單項(xiàng)工程的施工組織設(shè)計(jì)的目的是為了更好的全面地控制各單位工程的施工,對(duì)總施工計(jì)劃進(jìn)行合理的分配任務(wù)。在擬定主要工程項(xiàng)目的施工方案和技術(shù)經(jīng)濟(jì)方案后,使A、B、C三個(gè)單位工程能夠有序的開展施工工作,使整個(gè)工程項(xiàng)目中,,人力、物力、財(cái)力、技術(shù)資源充分利用,從而達(dá)到提高工程質(zhì)量、縮短工期、降低工程成本、實(shí)現(xiàn)安全文明施工的目的。本施工組織總設(shè)計(jì)內(nèi)容主要包括:工程總體概況、施工部署、本單項(xiàng)工程的重點(diǎn)難點(diǎn)、主要施工方法、質(zhì)量保證措施、進(jìn)度計(jì)劃及措施、安全文明生產(chǎn)、主要機(jī)械及勞動(dòng)力、施工總平面布置、施工的組織以及腳手架專項(xiàng)工程等。
[Abstract]:After consulting a large number of construction organization design related materials, plan documents and related contracts, design materials and related documents, site data of the project and relevant national specifications, this paper takes a certain home purchase square in Lianyungang as the research object. After synthesizing the characteristics and relevant data of each unit project, the overall construction organization design of the single project of the home plaza is worked out. Make the overall strategic arrangement for the unit project of AZBU C, provide the basis for the construction preparation and material support of each unit project, provide the basis for the construction plan of the unit project, and provide the scientific and reasonable scheme and implementation steps for the construction operation of the unit project. It also provides the basis for the feasibility and rationality of the construction plan. The purpose of compiling the construction organization design of single project is to control the construction of each unit project in an all-round way and to distribute the overall construction plan reasonably. After drawing up the construction plan and the technical and economic plan of the main project, the three unit projects of AZB / C can carry out the construction work in an orderly manner, so that the human, material, financial and technical resources of the whole project can be fully utilized. In order to improve the quality of the project, shorten the duration of the project, reduce the cost of the project, and achieve the goal of safe and civilized construction. The overall design contents of the construction organization mainly include: general situation of the project, construction arrangement, key points and difficulties of this single project, main construction methods, quality assurance measures, progress plans and measures, safe and civilized production, main machinery and labor force, General layout of construction, construction organization and scaffolding special project.
【學(xué)位授予單位】:遼寧科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:TU721
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 阮永芬;楊昆華;王東;;基于模糊一致矩陣?yán)碚摰氖┕し桨竷?yōu)選[J];四川建筑科學(xué)研究;2009年04期
2 張凱;趙國(guó)榮;;粒子群優(yōu)化算法在網(wǎng)絡(luò)計(jì)劃資源優(yōu)化中的應(yīng)用[J];海軍航空工程學(xué)院學(xué)報(bào);2008年01期
3 吳巖真;;試論建筑工程經(jīng)濟(jì)在工程管理中的應(yīng)用[J];華章;2010年10期
4 張厚先;楊昭蘭;;工期固定——資源均衡優(yōu)化方法的改進(jìn)[J];建筑技術(shù);2009年04期
5 王建偉;提高施工人員素質(zhì) 推動(dòng)信息化管理進(jìn)程[J];山西建筑;2003年14期
6 闞英霞;;論施工組織設(shè)計(jì)編制方法的改進(jìn)[J];科技信息(學(xué)術(shù)研究);2008年04期
7 張德江;;淺談建筑施工組織設(shè)計(jì)編制方法的改進(jìn)[J];科協(xié)論壇(下半月);2008年02期
8 馮立國(guó);;建筑施工組織設(shè)計(jì)編制缺陷及方法的改進(jìn)[J];民營(yíng)科技;2010年12期
9 張健;;施工組織設(shè)計(jì)編制偏差與改進(jìn)[J];人民黃河;2009年10期
10 張永會(huì);馬力;;多項(xiàng)目資源管理技術(shù)研究[J];計(jì)算機(jī)工程與設(shè)計(jì);2010年17期
本文編號(hào):2062561
本文鏈接:http://sikaile.net/kejilunwen/sgjslw/2062561.html