基于BIM信息集成平臺(tái)的施工總承包成本動(dòng)態(tài)控制
本文選題:BIM + 信息集成; 參考:《長(zhǎng)安大學(xué)》2013年碩士論文
【摘要】:當(dāng)今經(jīng)濟(jì)的高速發(fā)展,促使信息化產(chǎn)業(yè)以不同的形式逐步滲入各個(gè)行業(yè),對(duì)于建筑業(yè)來講,目前最熱門的即屬建筑信息模型BIM技術(shù)在設(shè)計(jì)施工領(lǐng)域的綜合應(yīng)用。建筑信息模型能夠?qū)⒔ㄖ?xiàng)目在投資生產(chǎn)過程中所產(chǎn)生的多種數(shù)據(jù)或文字信息,通過高速的計(jì)算機(jī)傳輸和運(yùn)算進(jìn)行分析整合,從而在第一時(shí)間內(nèi)得出管理者所需要的各種決策性信息,可在節(jié)約決策時(shí)間的同時(shí),有效降低項(xiàng)目成本。 本文利用建筑信息模型BIM理念,,及其多接口數(shù)據(jù)載入源和統(tǒng)一的數(shù)據(jù)傳遞標(biāo)準(zhǔn),解決各種工程數(shù)據(jù)間的識(shí)別和共享問題,建立BIM信息集成平臺(tái),支持工程數(shù)據(jù)信息的全面動(dòng)態(tài)管理及共享,將建筑項(xiàng)目信息一體化。同時(shí),針對(duì)施工總承包這一特殊的建筑參與方,建立施工總承包商的BIM信息集成平臺(tái)自有控制系統(tǒng),分別闡述進(jìn)度、合同、采購等的施工管理中重點(diǎn)控制體系。 本文重點(diǎn)研究施工總承包在BIM理論體系下的的成本動(dòng)態(tài)控制,主要闡述了在BIM信息集成平臺(tái)下總承包成本動(dòng)態(tài)控制響應(yīng)機(jī)制及其控制流程,其中又將總流程分為計(jì)劃編制、績(jī)效監(jiān)測(cè)、動(dòng)態(tài)評(píng)價(jià)及偏差響應(yīng)四部分分別論述,針對(duì)每個(gè)步驟提出詳細(xì)的流程安排,為成本動(dòng)態(tài)控制的實(shí)際應(yīng)用做好充分準(zhǔn)備。文章利用計(jì)算機(jī)程序中改進(jìn)掙值法的曲線特征,精確核準(zhǔn)成本發(fā)生狀態(tài),判斷成本變化趨勢(shì),通過預(yù)警機(jī)制的設(shè)置,將成本變動(dòng)情況及時(shí)告知相應(yīng)管理人員,在實(shí)際工程應(yīng)用中做到迅速的判定處理,高效的達(dá)到降低施工總承包成本的目的。
[Abstract]:With the rapid development of economy, the information industry is gradually infiltrated into various industries in different forms. For the construction industry, the most popular is the comprehensive application of building information model (BIM) technology in the field of design and construction. The building information model can analyze and integrate many kinds of data or text information produced by the construction project in the process of investment and production through high-speed computer transmission and operation. Thus, all kinds of decision-making information needed by managers can be obtained in the first time, which can save decision time and reduce project cost effectively. In this paper, the concept of building information model (BIM) and its multi-interface data loading source and unified data transfer standard are used to solve the problem of identification and sharing among various engineering data, and the BIM information integration platform is established. Support the overall dynamic management and sharing of engineering data information, and integrate the construction project information. At the same time, aiming at the construction general contract as a special construction participant, this paper establishes the BIM information integration platform's own control system of the construction general contractor, and expounds the key control system in the construction management of progress, contract, procurement and so on. This paper focuses on the dynamic cost control of construction general contracting under the BIM theory system, and mainly expounds the response mechanism and control process of the general contract cost dynamic control under the BIM information integration platform, in which the total process is divided into planning. Performance monitoring, dynamic evaluation and deviation response are discussed in this paper. Detailed process arrangement is proposed for each step, which makes full preparation for the practical application of cost dynamic control. In this paper, the curve characteristics of earned value method are improved in computer program, the state of cost occurrence is accurately approved, the trend of cost change is judged, and the corresponding managers are informed of the cost change in time through the setting of early warning mechanism. In the practical engineering application, the decision is done quickly, and the goal of reducing the total construction contract cost is achieved efficiently.
【學(xué)位授予單位】:長(zhǎng)安大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:TU723.3
【引證文獻(xiàn)】
相關(guān)期刊論文 前1條
1 張飛漣;郭三偉;楊中杰;;基于BIM的建設(shè)工程項(xiàng)目全壽命期集成管理研究[J];鐵道科學(xué)與工程學(xué)報(bào);2015年03期
相關(guān)博士學(xué)位論文 前1條
1 季璇;基于BIM的樓蓋模板優(yōu)化設(shè)計(jì)方法研究[D];中國礦業(yè)大學(xué)(北京);2017年
相關(guān)碩士學(xué)位論文 前9條
1 丁傳奇;基于BIM5D技術(shù)施工階段成本控制的研究[D];河北工程大學(xué);2017年
2 杭立飛;基于BIM技術(shù)的建筑項(xiàng)目全壽命周期成本分析[D];浙江工業(yè)大學(xué);2016年
3 曹小菊;DB項(xiàng)目在設(shè)計(jì)階段的成本控制研究[D];長(zhǎng)安大學(xué);2016年
4 楊田;傾斜攝影測(cè)量與BIM技術(shù)實(shí)現(xiàn)三維模型的研究[D];成都理工大學(xué);2016年
5 王豐碑;基于BIM技術(shù)的建筑工程信息查詢系統(tǒng)設(shè)計(jì)與應(yīng)用[D];鄭州大學(xué);2016年
6 陳琴;基于BIM技術(shù)的施工階段成本動(dòng)態(tài)控制研究[D];揚(yáng)州大學(xué);2016年
7 何斐璐;承包商視角下的改進(jìn)掙得值法研究[D];西南交通大學(xué);2015年
8 戚玉明;全面預(yù)算管理下鸚鵡洲長(zhǎng)江大橋項(xiàng)目成本控制研究[D];西南交通大學(xué);2015年
9 王敏;基于多維矩陣WBS的施工項(xiàng)目成本動(dòng)態(tài)控制研究[D];中國礦業(yè)大學(xué);2015年
本文編號(hào):1865574
本文鏈接:http://sikaile.net/kejilunwen/sgjslw/1865574.html