中廣核阜新萬(wàn)德號(hào)風(fēng)電場(chǎng)工程水土保持研究
[Abstract]:Fuxin Wande wind farm is located in Fumeng county where the ecological environment is relatively weak in northwest Liaoning Province. The soil and water loss problem is serious in this area. Therefore, the evaluation of soil and water conservation is not only an important issue related to people's livelihood, but also plays an important role in promoting the development of national economy and society. According to the existing data of wind farm and site condition, this paper has completed the research work of soil and water conservation evaluation, prediction, prevention and control and monitoring in the study area. The main contents are as follows: (1) balance of earth and rock, The influence of engineering construction on soil and water loss, the scope and responsibility of prevention and control are analyzed and evaluated. On the premise of meeting the needs of construction, the temporary land use is reduced as far as possible, and the scope of construction disturbance and the soil erosion caused by construction are effectively reduced. (2) to determine the prediction range, method and parameters of soil and water loss, and to predict the range of soil and water loss, the amount of soil and water loss, and the harm of soil and water loss. In the prediction period, the amount of soil and water loss produced under the original geomorphological condition is 655.41 t. If the measures of soil and water conservation are not taken, the possible amount of soil and water loss in the period of prediction is 1585.03 t, and the new amount of soil and water loss is 929.62 t. (3) Engineering measures and plant measures are carried out in five prevention and control zones of wind turbine, booster station, road, power collecting line and temporary site of construction in the study area. The prevention and cure area of wind power unit, the prevention area of booster station, the prevention and cure area of collecting electricity line and the prevention area of temporary land for construction are carried out. The temporary measures were arranged in three aspects, and a systematic and comprehensive system of soil and water conservation measures was formed. (4) according to the prediction results of soil and water loss, 6 indexes of soil erosion control were defined: disturbance land control rate, soil erosion control degree, soil loss control ratio, sediment retention rate, vegetation restoration coefficient and forest and grass coverage. To lay a foundation for the follow-up work of soil and water conservation.
【學(xué)位授予單位】:吉林大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:S157
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 袁愛(ài)萍,段淑懷,楊坤;北京市水土保持監(jiān)測(cè)體系的構(gòu)建[J];北京水利;2005年05期
2 蔡強(qiáng)國(guó),陸兆熊,王貴平;黃土丘陵溝壑區(qū)典型小流域侵蝕產(chǎn)沙過(guò)程模型[J];地理學(xué)報(bào);1996年02期
3 蔡強(qiáng)國(guó);坡面侵蝕產(chǎn)沙模型的研究[J];地理研究;1988年04期
4 李小文;;地球表面時(shí)空多變要素的定量遙感項(xiàng)目綜述[J];地球科學(xué)進(jìn)展;2006年08期
5 黃健熙;吳炳方;;基于B/S的水土保持信息查詢系統(tǒng)的設(shè)計(jì)和實(shí)現(xiàn)[J];計(jì)算機(jī)應(yīng)用研究;2006年07期
6 蔡強(qiáng)國(guó);坡長(zhǎng)在坡面侵蝕產(chǎn)沙過(guò)程中的作用[J];泥沙研究;1989年04期
7 郭索彥;李智廣;;我國(guó)水土保持監(jiān)測(cè)的發(fā)展歷程與成就[J];中國(guó)水土保持科學(xué);2009年05期
8 劉震;中國(guó)的水土保持現(xiàn)狀及今后發(fā)展方向[J];水土保持科技情報(bào);2004年01期
9 劉詠梅;楊勤科;王略;;水土保持監(jiān)測(cè)基本方法述評(píng)[J];水土保持研究;2008年05期
10 劉新華,楊勤科,湯國(guó)安;中國(guó)地形起伏度的提取及在水土流失定量評(píng)價(jià)中的應(yīng)用[J];水土保持通報(bào);2001年01期
本文編號(hào):2332170
本文鏈接:http://sikaile.net/kejilunwen/nykj/2332170.html